Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.0 Cr+₹1.4 L (1.35%)Rejected-AOC P MANNARPALAYAM SALEM | SALEM | SALEM | TAMIL NADU | ₹1.0 Cr+₹1.4 L (1.35%) | 2 | Rejected-AOC L2 |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
12 May 2023, 3:00 pmClosed
Project Diretor
DRDA Namakkal
Upgradation/ Strengthening/Periodic Upgradation/ Strengthening/Periodic Renewal and Five year Maintenance of2Road works inMallasamudramBlock of Namakkal District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT)- 2022-23.Pa.No35 /NKL/MGSMT
2023_RDTN_308350_23
DIPR/2142/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Mallasamudram
Required Documents as Per Schedule
4 documents required · 4 mandatory
₹0
₹1.0 L
Yes
DRDA Namakkal
4 Jul 2023
29 Apr 2023
12 May 2023
29 Apr 2023
12 May 2023
5 May 2023
5 May 2023
Amount
Strengthening of M.Kattipalayam Muniyappan Kovil to Thennamarathupalayam road H/o Maraparai (KM 0/0 - 1/130) (R - 71)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime coat over unprimed WMM surface using 7 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over unprimed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying 50mm Consolidated thick Bituminous Mecadam using 0.20 cum of 26.50 – 13.20 mm Graded metal and 0.43 cum of 13.20 – 2.36 mm Grade metal and 0.08 cum of 2.36 mm below with 37 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibrator roller to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30ton CMP W/M bitumen boiler tipper,trucks, paver, finisher, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 504 of MORTH
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory / phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and fixing of Sign boards
90cm Equilateral tringle cautionary signboard
60cm Cricle (MANDATORY SIGN)
Chevron Sign boad 90 cm Octagon (curves)
Reflector
KM Stone
HM Stone
Strengthening of Vaiyappamalai - Paruthi palli road to Marapparai Panchayat limit road (via) Somanampatti H/o. Paruthipalli Km 0/0-0/600
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning including all labourcharges.etc. complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and laying including cost and conveyance of Gritty gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Bituminous concrete
Provision for Road Marking including all cost and conveyance labour and Material charge etc, Complete
Providing and fixing of Sign boards
90cm Equilateral tringle cautionary signboard
60cm Cricle (MANDATORY SIGN)
Chevron Sign boad 90 cm Octagon (curves)
Reflector
KM Stone
HM Stone
Supply Erection Shuttering including Necessary support for Plane Surface including all etc
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and fixing of Bitumen pad for expansion joints
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
msrandco
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .