Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L1 | Accepted-AOC ACCEPTED AS STANDS LOWEST, L1 | |
| 2 | L2₹16.1 L+₹15,628.48 (0.98%)Rejected-AOC 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L2 | Rejected-AOC HIGHER THAN L1 | |
| 3 | L3₹16.2 L+₹25,361.28 (1.59%)Rejected-Finance | L3 | Rejected-Finance HIGHER THAN L1, L2 | |
| 4 | L4₹16.3 L+₹35,168 (2.20%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L4 | Rejected-Finance HIGHER THAN L1, L2 |
Tender Value
₹16.5 L
EMD Value
₹32,942
Closing Date
20 Mar 2020, 2:00 pmClosed
Executive Engineer, NMD, PHE DTE.
Office of the Executive Engineer, Northern Mechanical Division Public Health Engineering Directorate Sukanta Sarani, Paresh Nagar, Savoke Road, Siliguri - 734001, District- Jalpaiguri
Supply, delivery replacement of VT pump spares make Flowmore at GLR-II under Siliguri Comprehensive WS Scheme in the dist. of Darjeeling.
2020_PHED_276327_1
WBPHED/EE/NMD/NIeT- 35 OF 2019-2020
Open Tender
MECHANICAL
Item Rate
30 days
FULBARI, SILIGURI
Please refer Tender documents.
4 documents required · 4 mandatory
₹32,942
Yes
19 May 2020
3 Mar 2020
23 Mar 2020
3 Mar 2020
20 Mar 2020
3 Mar 2020
Amount
Supply & delivery of following spares for VT pump make:- WPIL. (model VT-26-16, 02 stage.)
PIPE PLUG
BEARING FOR SUCTION BELL
SAND COLLAR
SEAL RING
IMPELLER LOCK COLLET
BEARING FOR BOWL
BEARING FOR BOWL
BEARING FOR DISCHARGE CASE
PUMP SHAFT
PUMP SHAFT COUPLING
BOTTOM LINE SHAFT
LINE SHAFT BEARING
LINE SHAFT SLEEVE
LINE SHAFT COUPLING
HEAD SHAFT
PACKING BOX
BEARING FOR PACKING BOX
PACKING
LANTERN RING
PACKING GLAND
WATER DEFLECTOR
THRUST BEARING HOUSING ASSEMBLY
ADJUSTING NUT
Withdrawing and taking out of Vertical solid shaft induction Motor from its existing position with the help of overhead crane after disconnecting all electrical terminals and placement of the same on motor tool. For Two nos pumping machinery.
Withdrawing and taking out of Vertical pumps with the help of overhead crane after withdrawing of respective motor and complete dismantling the pump by skilled personnel towards replacement of the pump spares as required for. For Two nos pumping machinery.
Installation of respective BHT pump along with the motor by the existing lifting arrangement, after resembling the pumping machinery with the supplied materials (to be supplied under sl no. 1.00) as required and old serviceable materials as per direction of EIC. For Two nos pumping machinery.
Commissioning of the Pumping Machinery after making necessary power connection complete as per direction of EIC.
G.S.T. @ 12% (CGST @6% + SGST@6%)
DAS ENTERPRISE
STEEL ART INDUSTRIES PVT LTD
ORIENTAL ENGINEERING CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .