Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance Selected In lottery |
| 2 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance Not Selected in lottery |
| 3 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance Not Selected in lottery |
| 4 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance Not Selected in lottery |
| 5 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance Not Selected in lottery |
Tender Value
₹10.0 L
EMD Value
₹99,918
Closing Date
30 Jul 2026, 3:00 pmClosed
Chief Engineer, Kanpur Municipal Corporation
Chief Engineer Office, Kanpur Municipal Corporation, Motijheel, Kanpur
Construction of a 4 seater toilet at Higher Secondary School Basanti Nagar Juhi Zone 5
2026_NNKAN_1172975_1
1647/AA-5/25-26
Open Tender
Civil Works
Fixed-rate
Zone-5 juhi basanti
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,918
19 Aug 2026
28 Jul 2026
30 Jul 2026
28 Jul 2026
30 Jul 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by engineer in charge with ib a distance of 60 meters | 53.52 | Cum | 1,200 | ₹64,224 |
| 2 | Filling of carted earth | 1.44 | Cum | 316 | ₹455.04 |
| 3 | Prov & laying in position cement concrete 1:4:8 excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size | 1.68 | Cum | 5,600 | ₹9,408 |
| 4 | Sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc labour and T & P etc required for proper completion of the work. Saplings of girth upto 30cm measured at a height of 1 Mt. above ground level and removal of rubbish upto a distence of 50 Mt. out side the periphery of area cleared, including cost o | 1.8 | Cum | 635 | ₹1,143 |
| 5 | Treatment of soil along external perimeter of building 7.5 liters/sqm (5) Treatment of soil under apron along external perimter 5 liters/sq | 1 | Sqm | 120 | ₹120 |
| 6 | Chequred tiles in cl etc all comp | 5.1 | Sqm | 808 | ₹4,120.8 |
| 7 | Brick work with common burnt clay (Non modular) bricks of class-150 in S/S 1:4 cement mortar | 10.38 | Cum | 7,218 | ₹74,951.71 |
| 8 | Extra for B/work in super structure | 7.43 | Cum | 222 | ₹1,649.46 |
| 9 | Half brick masonry in cement mortar | 7.43 | Sqm | 753 | ₹5,594.79 |
| 10 | 12mm thick cement plaster in 1:4 cement, fine sand etc all complete | 85 | Sqm | 195 | ₹16,575 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.19 MB
BOQ_2202707.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .