Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.7 L+₹21,818.13 (2.91%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.1 L+₹58,381.47 (7.78%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹9.4 L+₹1.9 L (25.7%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹12.0 L
EMD Value
₹23,980
Closing Date
30 Jul 2026, 4:00 pmClosed
Executive Engineer PWD RandB Division R S Pura
Executive Engineer PWD RandB Division R S Pura
eNIT/SBD
2026_PWDJK_317243_4
Short e-NIT No. DRSP/52 of 2026-27 Dated 22-07-2026
Open Tender
Civil Works
Percentage
90 days
Kalyana
BOQ
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division R S Pura
₹23,980
R S Pura
7 Aug 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for cleaning of existing building and various types of urgent work as per site requirement,as directed by Engineer I/C Site | 8 | days | 553 | ₹4,424 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge 1:3:6 or richer mix (i/c equivalent design mix) | 8.79 | Cum | 1,725.2 | ₹15,164.51 |
| 3 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: | 4.98 | Cum | 1,458.45 | ₹7,263.08 |
| 4 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | 0.46 | Sqm | 2,516.85 | ₹1,157.75 |
| 5 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead : Of area of 3 sqm. and below | 9 | nos | 110.05 | ₹990.45 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 8.79 | cum | 4,826.5 | ₹42,424.94 |
| - | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.37 | cum. | 7,571.55 | ₹33,087.67 |
| - | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 4.37 | cum. | 1,455.65 | ₹6,361.19 |
| - | Providing and laying Reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) in suspended floors, balconies, landings and staircases having 15 degree slope. upto floor five level excluding the cost of centering and shuttering | 0.61 | cum. | 9,821.85 | ₹5,991.33 |
| - | Reinforcement for RCC work with TMT (Thermo Mechanically Treated bars) including straightening, cutting, bending, placing in position and binding all complete. | 72.9 | kg | 123.2 | ₹8,981.28 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1038746.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .