Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Rejected-Technical VILL PO BANSRA RANIGANJ BARDHAMAN BARDHAMAN 713358 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713358 | - | Rejected-Technical Rejected for price bid opening | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected for price bid opening |
| Sl No | Description | Qty | Unit | SC ENGINEERING SERVICE L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the coil from core for weighment | 1 | Nos. | 2,500 ₹2,500 Lowest |
| 2.00 | Gasket, nut. Bolts and other hardware items | 1 | Nos. | 1,800 ₹1,800 Lowest |
| 3.00 | Silver brazing electrode, DA/oxygen | 1 | Nos. | 3,500 ₹3,500 Lowest |
| 4.00 | Fitting of reformed coils in the limbs | 1 | Nos. | 3,500 ₹3,500 Lowest |
| 5.00 | Assembling of transwitch | 1 | Nos. | 1,850 ₹1,850 Lowest |
| 6.00 | Drying of transformer at recommended temparature | 1 | Nos. | 2,000 ₹2,000 Lowest |
| 7.00 | Cost of new EL grade copper conductor primary: 03 coils x 60Kg = 180kg, Secondary: 03 coils x 40Kg = 120Kg, Total= 300Kg x 1055= 316500.00/- Less scrap 285 Kg x 612 = 174420.00/- (316500 - 174420) = 142080 | 1 | Nos | 1,42,080 ₹1,42,080 Lowest |
| 8.00 | Insulation of primary conductor | 1 | Nos. | 30,000 ₹30,000 Lowest |
| 9.00 | Insulation of secondary conductor | 1 | Nos. | 32,000 ₹32,000 Lowest |
| 10.00 | Re-formation of primary coils as per original size | 1 | Nos. | 24,000 ₹24,000 Lowest |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
5 Sept 2026, 5:00 pmClosed
General Manager, Kunustoria Area
O/o The General Manager, Kunustoria Area, ECL, P.O - Toposi, Paschim Bardhaman, 713362, (W.B)
Repair of burnt TSU and its relocation to another sub-station at Area Complex under Kunustoria Area
2026_ECL_364232_1
ECL/KNT/EnM/e-Ten/26-27/21 D.20.07.2026
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Kunustoria Area
As per NIT
5 documents required · 5 mandatory
₹7,000
30 Sept 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
5 Sept 2026
26 Aug 2026
26 Aug 2026 - 29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the coil from core for weighment | - | Nos. | 2,500 | - |
| 2 | Gasket, nut. Bolts and other hardware items | - | Nos. | 1,800 | - |
| 3 | Silver brazing electrode, DA/oxygen | - | Nos. | 3,500 | - |
| 4 | Fitting of reformed coils in the limbs | - | Nos. | 3,500 | - |
| 5 | Assembling of transwitch | - | Nos. | 1,850 | - |
| 6 | Drying of transformer at recommended temparature | - | Nos. | 2,000 | - |
| 7 | Cost of new EL grade copper conductor primary: 03 coils x 60Kg = 180kg, Secondary: 03 coils x 40Kg = 120Kg, Total= 300Kg x 1055= 316500.00/- Less scrap 285 Kg x 612 = 174420.00/- (316500 - 174420) = 142080 | - | Nos | 1,42,080 | - |
| 8 | Insulation of primary conductor | - | Nos. | 30,000 | - |
| 9 | Insulation of secondary conductor | - | Nos. | 32,000 | - |
| 10 | Re-formation of primary coils as per original size | - | Nos. | 24,000 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 1.22 MB
BOQ_377137.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .