| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹11.8 L (8.11%)Admitted-Finance | ₹1.6 Cr+₹11.8 L (8.11%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical All Required Documents are not submiited |
| Sl No | Description | Qty | Unit | SV PERUMAL L2 | MANIKANDIAR MOORTHY L1 |
|---|---|---|---|---|---|
| 1.00Strengthening to the Road from Pathampatti AD Colony Road Km 0/0-1/0 in Pathampatti Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead of 10 metre & initial of 2 metre in hard stiff clay, stiff black cotton, hard red eart, shales, murrum, gravel,Stoney earth and earth mixed with small size boulderrs SS 20A | 418.78 | Cum | 110 ₹46,065.8 | 102.9 ₹43,092.46 Lowest |
| 1.02 | PICKING old Wornout BT Surface upto. 10cm thick as directed by the deparmtnetal officers | 1,239.12 | Sqm | 20 ₹24,782.4 | 17.15 ₹21,250.91 Lowest |
| 1.03Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.04 | Km 0/0-1/0 | 373.91 | Cum | 1,850 ₹6,91,733.5 | 1,747.99 ₹6,53,590.94 Lowest |
| 1.05Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
| 1.06 | Km 0/0-1/0 | 3,739.12 | Sqm | 75 ₹2,80,434 | 68 ₹2,54,260.16 Lowest |
| 1.07Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.08 | Km 0/0-1/0 | 3,750 | Sqm | 20 ₹75,000 | 16.07 ₹60,262.5 Lowest |
| 1.09PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., | |||||
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
9 May 2022, 3:00 pmClosed
Project Director,
DRDA, Pudukkottai
TNRRIS 2021-22 - Package No. 43 - Strengthening of the 5 road from Thiruvarankulam Block in Pudukkottai District
2022_RDTN_230549_1
TNRRIS 2021-22, Package No. 43 - Pudukkottai Dt
Open Tender
Civil Works - Roads
Item Rate
90 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.5 L
3 Jun 2022
28 Apr 2022
9 May 2022
28 Apr 2022
9 May 2022
28 Apr 2022
Amount
Strengthening to the Road from Pathampatti AD Colony Road Km 0/0-1/0 in Pathampatti Panchayat
Earth work excavation and depositing on bank with initial lead of 10 metre & initial of 2 metre in hard stiff clay, stiff black cotton, hard red eart, shales, murrum, gravel,Stoney earth and earth mixed with small size boulderrs SS 20A
PICKING old Wornout BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc.,
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Construction for Construction of RCC 1.50 m Span Culvert at Ch 140 m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Belove Sill Level
Above Sill Level
C.C. 1:2:4 mix using 20mm ISS HBG Metal Including all Cost and conveyance and all labour charges and all other incidental charges
Supplying And Fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges
C.C. 1:1.5:3 mix using 20mm ISS HBG Metal Including all Cost and conveyance and all labour charges and all other incidental charges
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
Provision for KM Stones (size 1.65 x 0.45 x0.15m)
Provision for Sign Board for Information
Provision for Lettering the Name Board for Information
Strengthening to the Road from Therkkupatti Pillaiyar Koil road Km 0/0 - 1/0 in Pallathividuthi Panchayat
Clearing and grubbing road land incuding uprooting wild Vegetation,grass,bushes,scrubs,saplings and trees of grith upto 300mm, disposal of top organic soil not exceeding 150mm thickness sa per technical specification clause 201
Earth work excavation and depositing on bank with initial lead of 10 metre & initial of 2 metre in hard stiff clay, stiff black cotton, hard red eart, shales, murrum, gravel,Stoney earth and earth mixed with small size boulderrs SS 20A
Picking old Wornout BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc.,
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Construction for NP3 Pipe Culvert at CH 655m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
Provision for KM Stones (size 1.65 x 0.45 x0.15m)
Provision for Lettering the Name Board for Information
Strengthening to the Road from Pattukkottai Aranthangi Road to Panankulam Kalapudaiyar Kovil Road Km 0/0 -1/050 in Panankulam Panchayat
Clearing and grubbing road land incuding uprooting wild Vegetation,grass,bushes,scrubs,saplings and trees of grith upto 300mm, disposal of top organic soil not exceeding 150mm thickness sa per technical specification clause 201
Earth work excavation and depositing on bank with initial lead of 10 metre & initial of 2 metre in hard stiff clay, stiff black cotton, hard red eart, shales, murrum, gravel,Stoney earth and earth mixed with small size boulderrs SS 20A
PICKING old Wornout BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc.,
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Construction for NP3 Pipe Culvert at CH 630 m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
Construction for NP3 Pipe Culvert at CH 720 m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
Provision for KM Stones (size 1.65 x 0.45 x0.15m)
Provision for Lettering the Name Board for Information
Strengthening to the Road from Manipallam - Venkitakulam Road to Manganampatti Village road Km 0/0 - 1/460 in Kayampatti Panchayat
Earth work excavation and depositing on bank with initial lead of 10 metre & initial of 2 metre in hard stiff clay, stiff black cotton, hard red eart, shales, murrum, gravel,Stoney earth and earth mixed with small size boulderrs SS 20A
PICKING old Wornout BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc.,
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Construction for NP3 Pipe Culvert at CH 7m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
Construction for NP3 Pipe Culvert at CH 630m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
Construction for NP3 Pipe Culvert at CH 768m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
Construction for Construction of RCC 1.50 m Span Culvert at Ch 945 m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Belove Sill Level
Above Sill Level
C.C. 1:2:4 mix using 20mm ISS HBG Metal Including all Cost and conveyance and all labour charges and all other incidental charges
Supplying And Fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges
C.C. 1:1.5:3 mix using 20mm ISS HBG Metal Including all Cost and conveyance and all labour charges and all other incidental charges
Construction for NP3 Pipe Culvert at CH 1450 m
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Cost, supply and Laying of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour chargges for filling ect.,, Complete
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
Provision for KM Stones (size 1.65 x 0.45 x0.15m)
Provision for Lettering the Name Board for Information
Strengthening to the Road from Paramanpatti school road Km 0/0-1/026 in Vadagadu Panchayat
Earth work excavation and depositing on bank with initial lead of 10 metre & initial of 2 metre in hard stiff clay, stiff black cotton, hard red eart, shales, murrum, gravel,Stoney earth and earth mixed with small size boulderrs SS 20A
PICKING old Wornout BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and Laying tack coat over WMM surface (treated with primer) using 2.5Kg of bituminous emulsion RS-1 per 10 Sqm.for preparatory to another Bituminous construction over it including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
PREMIX CARPET WITH SEAT COAT TYPE 'A' using paver machine with plastic waste.Providing and laying premix carpet with seal coat Type A to 20mm thick using 0.18cum of 13.20mm,0.09cum of 11.20mm and 0.09cum of 6.70mm with 23.232kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30T capacity,conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 20mm with machanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc.,
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Provision for Repairs to Hardbed at Ch 570 m
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
C.C. 1:2:4 mix using 20mm ISS HBG Metal Including all Cost and conveyance and all labour charges and all other incidental charges
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
Provision for KM Stones (size 1.65 x 0.45 x0.15m)
Provision for Lettering the Name Board for Information
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SV PERUMAL
Bidder Name
SV PERUMAL
MANIKANDIAR MOORTHY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
43_Techbid.pdf
Tender Documents • 0.71 MB
BOQ_271810.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .