Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹71.6 LAccepted-Finance 41 21 A KMC TOWERS C2 C2 SCHEME ROAD THENI 625531 | THENI | TAMIL NADU | 625531 | 1 | Accepted-Finance Based on the BOQ | |
| 2 | 2₹73.5 L+₹1.9 L (2.64%)Accepted-Finance 171 KAMAC ROAD SIVAKASI 626123 | VIRUDHUNAGAR | TAMIL NADU | 626123 | 2 | Accepted-Finance Based on the BOQ |
Tender Value
Refer Docs
EMD Value
₹73,000
Closing Date
30 Mar 2022, 3:00 pmClosed
Project Director
1st floor, DRDA, Theni
Strengthening of road from Ayyanathapuram to Dombuchery link road km 0/0-1/6 in Bodinaickanur Block
2022_RDTN_223349_1
4101/2021/D4 Date 25.02.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
as per tender document
3 documents required · 3 mandatory
₹0
₹73,000
1st floor, DRDA, Theni
3 Feb 2023
1 Mar 2022
30 Mar 2022
1 Mar 2022
30 Mar 2022
14 Mar 2022
14 Mar 2022
Amount
Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over the WBM. surface using Emulsion Bitumen of 4.00 kgs/10 sqm including cost of buituminous emnulsion which will be supplied departmentally at sectiojn stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual workspot handling charges for brushing cleaning and including labour chartes for preparing the surface for laying tackcoat and labour for applying the requikred quantity of bitumen emulsion using towed or self propelled bitumen pressure sprayer charges for rools and plants employed for the working including all other incidental charges such as barricading and providing danger light flags, etc., complete as per standard specification No. 503 of MOST - 10 sqm
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. ( Using Paver with VR )
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Supplying and Fixing of KM stone etc 1.65x0.45x0.15
Supplying and Fixing of HM stone etc 0.75 x 0.23x0.10
60cm Equilatral Triangle Sign Board
60cm x 45cm Rectangular Board
Guide wall at Ch 0/0 -1/0 ( Sub Estimate -1)
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with
Plain Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Cenetering Shuttering including necessary support for plane surface in foundation and Basement and in all floors usingmild steel sheets of size 90x60 cm and 10 gauge stiffened , welded with steel angles of size 25mmx 25mmx3mm for boarding laid over silver
Plain Cement Concrete in CM 1 : 3 : 6 mix using 40 mm gauge hard brocken granite stone jellay for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting et., complete complying with standard specification
Provision for PVC Pipe for Wheep holes
2.00m SpanCulvert at Ch 0/670km ( Sub Estimate -2)
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Supply and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting, bending,tying and forming grills for all works
CC 1:2:4 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
RCC 1:1 1/2 :3 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Supply and filling of Red gravel from local quary with average lead of 1 Km including cost of meterails to side and all other labour charges as per standard specification etc.
Towards the cost of Bitumen Pad for Expansion Joint
Towards the cost of Tar Paper
Towards the cost of PVC Pipes for Weepholes
Provision for 3.00m SpanCulvert at Ch 0/770km ( Sub Estimate -3)
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Supply and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting, bending,tying and forming grills for all works
CC 1:2:4 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
RCC 1:1 1/2 :3 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Supply and filling of Red gravel from local quary with average lead of 1 Km including cost of meterails to side and all other labour charges as per standard specification etc.
Towards the cost of Bitumen Pad for Expansion Joint
Towards the cost of Tar Paper
Towards the cost of PVC Pipes for Weepholes
Provision for Retaining Wall wall at Ch 1/0 -1/6 ( Sub Estimate -4)
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with
Plain Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Cenetering Shuttering including necessary support for plane surface in foundation and Basement and in all floors usingmild steel sheets of size 90x60 cm and 10 gauge stiffened , welded with steel angles of size 25mmx 25mmx3mm for boarding laid over silver
Plain Cement Concrete in CM 1 : 3 : 6 mix using 40 mm gauge hard brocken granite stone jellay for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting et., complete complying with standard specification
Provision for PVC Pipe for Wheep holes
Provision for 3.00m SpanCulvert at Ch 1/120km ( Sub Estimate -5)
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Supply and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting, bending,tying and forming grills for all works
CC 1:2:4 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
RCC 1:1 1/2 :3 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Supply and filling of Red gravel from local quary with average lead of 1 Km including cost of meterails to side and all other labour charges as per standard specification etc.
Towards the cost of Bitumen Pad for Expansion Joint
Towards the cost of Tar Paper
Towards the cost of PVC Pipes for Weepholes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JEGANATHAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .