| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹1.1 L (0.66%)Admitted-Finance | ₹1.8 Cr+₹1.1 L (0.66%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 02 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S MUDRAWATI L1 | M/S BABA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Erection Work | |||||
| 2.00 | Erection of ST single Pole | 211 | Nos | 4,92,263 ₹4,92,263 Lowest | 4,92,685 ₹4,92,685 |
| 3.00 | Erection of STP double Pole with all accessaries | 6 | Nos | 21,030 ₹21,030 Lowest | 22,890 ₹22,890 |
| 4.00 | Erection of PCC Single Pole with all accessaries | 345 | Nos | 11,20,905 ₹11,20,905 Lowest | 11,21,250 ₹11,21,250 |
| 5.00 | Grounting of Pole | 531 | Nos | 5,57,550 ₹5,57,550 Lowest | 5,60,205 ₹5,60,205 |
| 6.00 | Nozling, grouting of stay | 83 | Nos | 1,41,515 ₹1,41,515 Lowest | 1,41,930 ₹1,41,930 |
| 7.00 | Earthing Complete | 430 | Nos | 3,97,750 ₹3,97,750 | 3,01,000 ₹3,01,000 Lowest |
| 8.00 | Safe Mounting & charging of 25 KVAT/F on double Pole | 2 | Nos | 7,700 ₹7,700 Lowest | 7,800 ₹7,800 |
| 9.00 | Safe Mounting & charging of 63 KVAT/F on double Pole | 1 | Nos | 4,200 ₹4,200 Lowest | 4,250 ₹4,250 |
| 10.00 | Safe Mounting & charging of 250KVA T/F on Plint Pole | 1 | Nos | 4,500 ₹4,500 Lowest | 4,550 ₹4,550 |
Tender Value
₹1.3 Cr
EMD Value
₹1.5 L
Closing Date
29 Mar 2023, 2:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER EDC Basti
Construction of 11 Kv LT Line for Nagar Panchayt Hariya and Babhnan Under EDD Harriya
2023_PVVNV_788537_1
61/EDC(B)/2022-23
Open Tender
Electrical Works
Turn-key
180 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
S.E.EDC Basti
₹1.5 L
Yes
3 Apr 2023
22 Mar 2023
30 Mar 2023
22 Mar 2023
29 Mar 2023
22 Mar 2023
Erection Work
Erection of ST single Pole
Erection of STP double Pole with all accessaries
Erection of PCC Single Pole with all accessaries
Grounting of Pole
Nozling, grouting of stay
Earthing Complete
Safe Mounting & charging of 25 KVAT/F on double Pole
Safe Mounting & charging of 63 KVAT/F on double Pole
Safe Mounting & charging of 250KVA T/F on Plint Pole
T-off Channel size 125x65x1300 mmFitting with Pole
Lying,spreding, Tighting &binding of conductor H.T. Line 3 Phase 3 Wire
Tree Cuting
Plinth and Fencing for 250 KVA tranformer
Guarding of 11 KV Line
Erraction of ABC Conductor
V-type x-arm fitting
Erraction of Distribution Box
Centrilize Material
STP Pole 11 Mtr
PCC Pole 9 Mtr
ACSR Wesal Conductor
11 KV V X-Arm
11 KV Pin insulator with Pin
11 KV Disc Insulator with fiting
Top Channel
Earthing Complete
Stay set Complete
11/0.4 KV 25 KVA Trasformer
11/0.4 KV 63 KVA Trasformer
11/0.4 KV 250 KVA Trasformer
S/S Base Angle
T-Off Channel
Danger Board
Guarding Angle
Barbed Wire
ABC Conductor 3x95+1x70+1x16
De-Centrilized Material
X-Arm Holding Clamp
T-Off Channel Clamp
F-Bracket with Nbut & Bolt
M.S. Nut & Bolt of Varius Type
G.I. Wire for Guarding
Sub Station Channel Clamps
Allumminum Lug
Guarding Clamp
Clamp for Transformer
Cable 3.5x70mm
Cable 1x400 MMsq/
Eye Hook
Suspension Clamp
Distribution Box
Dead end Clamp
Droper Channel
Clamp with Nut & Bolt for Guarding channel
M/S BABA ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .