Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.8 LAccepted-AOC | ₹93.8 L | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹95.0 LRejected-Finance 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | ₹95.0 L | L2 | Rejected-Finance Higher Bid |
| Rank | Bidder | Total Amount |
|---|---|---|
| L2 | DEVI CONSTRUCTIONS Bid ID 1572644 | ₹94,95,510 |
| L1 | SRI SEMBAIYANAR CONSTRUCTIONS Bid ID 1572639 | ₹93,80,736 |
| Sl No | Description | Qty | Unit | DEVI CONSTRUCTIONS L2 | SRI SEMBAIYANAR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying of tack coat using Bitumen Emulsion (RS1) at the rate of 2 kg per 10sqm over the WMM primed surface preparatory to another construction over it.as per as per standar specification MORTH V | 9,960 | M2 | 30 ₹2,98,800 | 28 ₹2,78,880 |
| 2.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 498 | m3 | 11,000 ₹54,78,000 | 10,862 ₹54,09,276 |
| 3.00 | Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5. | 298.8 | m3 | 11,325 ₹33,83,910 | 11,250 ₹33,61,500 |
| 4.00 | Providing and Laying of Hot applied Thermoplastic Compound of 2.5mm thick including refllectorising glass beads @ 250grams per sqm area thickness of 2.5mm is exclusive of surface applied glass beads per IRC:35 the Finished surface to be level,uniform and free from steaks and holes etc, Complete as per MORTH Specification NO.803 (ROAD EDGE PACKING) | 372 | m2 | 900 ₹3,34,800 | 890 ₹3,31,080 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
23 Jan 2026, 3:00 pmClosed
Executive Officer
Kurinjipadi TP Office, Virupatchi Road, Kurinjipadi
Providing BT Surface to Raja Veethi Ellakkal to Cuddalore Bypass Road SKS Nagar Main Road Government Hospital Road Hospital Veethi Bhuvanagiri Road to Chinna Kadai Veethi in Kurinjipadi TP
2026_DTP_641610_1
598/2025 TURIF
Open Tender
Civil Works - Roads
105 days
Kurinjipadi TP
Refer Bid Document
2 documents required · 2 mandatory
₹0
₹1.1 L
Kurinjipadi TP Office
4 Feb 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
10 Jan 2026 - 23 Jan 2026
14 Jan 2026
Providing and laying of tack coat using Bitumen Emulsion (RS1) at the rate of 2 kg per 10sqm over the WMM primed surface preparatory to another construction over it.as per as per standar specification MORTH V
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5.
Providing and Laying of Hot applied Thermoplastic Compound of 2.5mm thick including refllectorising glass beads @ 250grams per sqm area thickness of 2.5mm is exclusive of surface applied glass beads per IRC:35 the Finished surface to be level,uniform and free from steaks and holes etc, Complete as per MORTH Specification NO.803 (ROAD EDGE PACKING)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_768489.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid