| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹32.0 L+₹2.1 L (6.90%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹45.3 L+₹15.4 L (51.3%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Technocrats Advisory Services Pvt. Ltd. L2 | Koranne Consultants Pvt Ltd L1 | EKAM Venture L3 |
|---|---|---|---|---|---|---|
| 1.00Professional Staff : | ||||||
| 2.00 | Team Leader Cum Bridge Engineer | 4 | Month | 1,00,000 ₹4,00,000 | 70,000 ₹2,80,000 Lowest | 70,000 ₹2,80,000 Lowest |
| 3.00 | Bridge Engineer | 2 | Month | 75,000 ₹1,50,000 | 50,000 ₹1,00,000 Lowest | 60,000 ₹1,20,000 |
| 4.00 | Highway Engineer | 6 | Month | 65,000 ₹3,90,000 | 40,000 ₹2,40,000 Lowest | 50,000 ₹3,00,000 |
| 5.00 | Material-cum-Geo-technical Engineer – Geologist | 6 | Month | 60,000 ₹3,60,000 | 40,000 ₹2,40,000 Lowest | 50,000 ₹3,00,000 |
| 6.00 | Survey Engineer | 4 | Month | 45,000 ₹1,80,000 Lowest | - | 50,000 ₹2,00,000 |
| 7.00 | Traffic and Safety expert | 4 | Month | 60,000 ₹2,40,000 | - | 50,000 ₹2,00,000 Lowest |
| 8.00 | Quantity Surveyor / Documentation Expert | 4 | Month | 43,000 ₹1,72,000 Lowest | - | 50,000 ₹2,00,000 |
| 9.00Sub Professional Staff : | ||||||
| 10.00 | Staff 1 | 1 | Numbers | - | 25,000 ₹25,000 Lowest | 25,000 ₹25,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
26 Mar 2025, 5:00 pmClosed
E. E. N.H.Dn Nagpur
Civil Line Nagpur
Consultancy Services for Prepartion of Detailed Project Report and Feasibillity study for the Rail Over Bridge at Khaparkheda railway Crossing of Package IV Phase-I Dahegaon to Kamptee Section on NH247 at Ch. 4.880 over Khaparkheda-Pipla Ha
2025_MoRTH_852666_1
NIT-38/EENH/NGP/2024-25
Open Tender
Civil Works
Item Rate
120 days
Rail Over Bridge at Khaparkheda railway Crossing
Pl refer tender Document
7 documents required · 7 mandatory
₹5,900
Pay online in Bharatkosh
₹5 L
Executive Engineer N.H.Dn. Nagpur
7 Jun 2025
10 Mar 2025
27 Mar 2025
10 Mar 2025
26 Mar 2025
12 Mar 2025
12 Mar 2025
Amount
Professional Staff :
Team Leader Cum Bridge Engineer
Bridge Engineer
Highway Engineer
Material-cum-Geo-technical Engineer – Geologist
Survey Engineer
Traffic and Safety expert
Quantity Surveyor / Documentation Expert
Sub Professional Staff :
Staff 1
Staff 2
Staff 3
Staff 4
Support Staff (To be assessed by consultant as per requirment)
Office Manager
Typist
Office Boy
Night Watchman
Transportation : Vehicle provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.
For Conusltant: Innova or Equivalent (Not more than 3 years old)
For Department: Innova or Equivalent (Not more than 3 years old)
Duty Travel to Site (Fixed Costs) :
Office Rent : (The rent cost includes maintenance, cleaning, repairs, etc. )
Office Supplies, Utilities and Communication :
Office Supplies Drafting Supplies Computer
Running Costs
Domestic and International
Communication
Office Furniture and Equipment (Rental) :
Reports and Document Printing
Monthly Report
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D)notification for land acquisition(3 copies each)
LA & Clearances II Report including GAD approval
Survey and Investigation :
A. Survey (Fixed Cost)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer,Detailed topographic surveys using mobile/ aerial LiDAR or better technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Boring in all type of soils
Net Work Survey and GPR :
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC: 25, 1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an intervalof 200 m on either side of proposed Right of Way. Wherever there is aproposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.(lumps um)
Land Acquisition Team including support staff and logistics/transportation
Ex-Land Revenue Inspector/Officer or equivalent
Ex- Kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Logistics for Land acquisition Team
Computer including necessary peripherals
Printers
Technocrats Advisory Services Pvt. Ltd. (BID ID -3191289)
EKAM Venture (BID ID -3190974)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .