Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical BURLA SAMBALPUR | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical AT PUTIBANDH PO PS DHANUPALI DIST SAMBALPUR ODISHA | SAMBALPUR | SAMBALPUR | ODISHA | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.5 Cr
EMD Value
₹4.5 L
Closing Date
18 Sept 2026, 5:00 pmClosed
Addl. Chief Engineer, OTDC Ltd.
O/o The Addl. Chief Engineer, OTDC Ltd.
Improvement of Kardola Craft Village at Sambalpur
2026_OTDC_140041_1
ACE/OTDC/06/2026-27 dtd. 29.08.2026
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Sambalpur
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹4.5 L
Yes
19 Sept 2026
3 Sept 2026
19 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Façade | - | - | - | - |
| 2 | Dismantling brick or stone masonry in cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all material, labour, conveyance, loading and un-loading, royalties, sundries, tools and plants, etc., complete as per the direction of the Engineering-in-charge/Consultant. | 77.52 | CUM | 1,646.6 | ₹1,27,644.43 |
| 3 | Dismantalling and removal of old RCC from beam, column, roof slab,self, chajja etc including stacking of servicable material and removal of debries to an unobjectionable area within 50 mtr lead etc. complete with cost, conveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 44.37 | CUM | 1,731.8 | ₹76,839.97 |
| 4 | Dismantalling and removal of old plain cement concrete from foundation, floor etc including stacking of servicable material and removal of debries to an unobjectionable area within 50 mtr lead etc. complete with cost, conveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 91.8 | CUM | 964.3 | ₹88,522.74 |
| 5 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead etc. complete with cost, conveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 238.68 | SQM | 465.1 | ₹1,11,010.07 |
| 6 | Dismantalling and removal of old cement flooring etc including stacking of servicable material and removal of debries to an unobjectionable area within 50 mtr lead etc. complete with cost, conveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 413.1 | SQM | 117.9 | ₹48,704.49 |
| 7 | Dismantalling and removal of old AC/GCI sheet roofing etc including stacking of servicable material and removal of debries to an unobjectionable area within 50 mtr lead etc. complete with cost, conveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 408 | SQM | 106.3 | ₹43,370.4 |
| 8 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead etc. complete with cost, conveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 627.3 | SQM | 147.4 | ₹92,464.02 |
| 9 | Dismantling and removing old tiled cladding from walls including racking out joints 12mm deep and stacking the useful materials for reuse and removing the debris within 50m lead etc. complete with cost, conveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 122.4 | SQM | 76.6 | ₹9,375.84 |
| 10 | Dismantling steel sections, grill etc including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all material, labour, conveyance, loading and un-loading, royalties, sundries, tools and plants, etc., complete as per the direction of the Engineering-in-charge/Consultant. | 80.48 | QTL | 230.6 | ₹18,558.69 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
DTCN.pdf
Tender Documents • 2.34 MB
BOQ_607977.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .