Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90,430Accepted-AOC | 1 | Accepted-AOC after Negotiated and Accepted |
Tender Value
Refer Docs
Closing Date
20 Apr 2023, 2:00 pmClosed
EE/TE/GCC-I/CNI
A-10 Thiru Vi Ka Industrial Estate, Guindy, Chennai-32
Labour charges for Erection of One number 16 MVA,110/33-11 KV Make M/s Victory, Power Transformer bearing SL NO 4-00071 (Repaired unit) at Kanagapattu 110 kV SS in Chengalpattu EDC towards 2nd Unit
2023_EB_300683_1
EE/TE/GCC-I/CNI/LT-02/23-24
Limited
Electrical Works
Works
30 days
Guindy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Yes
17 Aug 2023
10 Apr 2023
21 Apr 2023
10 Apr 2023
20 Apr 2023
10 Apr 2023
Amount
Hire charges for crane for erection of 1X16MVA Power Transformer accessories.
Labour Charges for erection of 1X16MVA Power Transformer.
Labour charges for transformer oil circulation in main tank and OLTC under Hot oil circulation, vaccum drying wherever applicable and circulation of oil till satisfactory results are obtained before commissioning.
Labour Charges for draining of oil in the Transformer tank excess quantity above 800 litres.
Charges for refilling of oil in the Transformer tank excess quantity above 800 litres.
Fixed charges for provision of filter machine.
Labour charges for laying of control cable upto 8 core.
Labour charges for laying of control cable above 8 core.
Supplying and Glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armour - 19mm Gland
Supplying and Glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armour - 25mm Gland
Supplying and Glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armour - 28mm Gland
Supplying and Glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armour - 32mm Gland
Labour charges for supply & termination of cable core end including the cost of cable socket Lug, ferrules, strap etc as per cable schedule for each terminal.
Labour charges for Neutral bushing earthing at 2 points, transformer tank earthing at 2 points, DM box,Marshalling box and RTCC panel earthing. (M.S. flats for the work will be supplied by the Board)
Labour charges for earthing of Cooler fans and oil pumps of Power Transformers upto 16 MVA capacity using bare copper wires (minimum 10/12 SWG copper wires)
Labour charges for excavation of earth and refilling for an average depth of 0.5mtr and 0.3mtr width for
Labour charges for preliminary cleaning, covering, Aluminium painting and enamel colour painting using air compressor, painting spray gun, brush etc.(including Paint Cost)
Labour charges for providing skilled man power assistance during bushing CT testing, pre commissioning testing and commissioning of Power/Auto TR's (maximum of 3 days for Transformers upto 110 kV class)
Labour charges for gasket cutting as required for various capacity Power transformer during erection
Labour for making panel cut,and mounting of differential relay, annunciator facia etc., in RTCC panel or in other panels using panel cutter
GST for bidders within TamilNadu
SGST for Labour Charge
CGST for Labour Charge
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .