Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC DEEDAR MARKET ROOM NO UB 12 POLICE BAZAR SHILLONG 793001 | EAST KHASI HILLS | MEGHALAYA | 793001 | ₹2.3 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹2.3 Cr+₹1.8 L (0.79%)Rejected-Finance OPP BSF GATE NO 3 AZARA GUWAHATI 17 ASSAM | ₹2.3 Cr+₹1.8 L (0.79%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹2.4 Cr+₹9.8 L (4.20%)Rejected-Finance C O GUPTA EMPORIUM AR BAZAR HAPPY VALLEY SHILLONG 793 004 | EAST KHASI HILLS | MEGHALAYA | 793004 | ₹2.4 Cr+₹9.8 L (4.20%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹3.0 Cr+₹63.1 L (27.1%)Rejected-Finance | ₹3.0 Cr+₹63.1 L (27.1%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹3.0 Cr+₹65.7 L (28.3%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹3.0 Cr+₹65.7 L (28.3%) | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | H K Enterprise L1 | PURBANCHAL BUILDERS L8 | N.K.TRADING COMPANY L7 | M/s Gupta Construction L6 | M/S UTTAM SAHA L3 | M/s Dhani Enterprise L2 | M/s Singh enterprises L9 | MAHINDER ELECTRICALS L5 | N.V.ENGINEERING L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft/ loose soil complete all as specified and as directed. | 20 | SQM | 30 ₹600 | 49 ₹980 | 35 ₹700 | 35 ₹700 | 40 ₹800 | 45 ₹900 | 55 ₹1,100 | 25 ₹500 Lowest | 45 ₹900 |
| 2.00 | Surface dressing not exceeding 15 cm deep in soft/ loose soil complete all as specified and as directed. | 920 | SQM | 25 ₹23,000 Lowest | 59 ₹54,280 | 30 ₹27,600 | 55 ₹50,600 | 35 ₹32,200 | 27 ₹24,840 | 55 ₹50,600 | 45 ₹41,400 | 48 ₹44,160 |
| 3.00 | Rough excavation not exceeding 1.5 m deep and getting out in soft/ loose soil complete all as specified and as directed. | 418.8 | CUM | 165 ₹69,102 | 229 ₹95,905.2 | 45 ₹18,846 Lowest | 200 ₹83,760 | 280 ₹1,17,264 | 150 ₹62,820 | 200 ₹83,760 | 200 ₹83,760 | 200 ₹83,760 |
| 4.00 | Excavating over areas exceeding 1.5 m but not exceeding 3 m deep and getting out in soft/ loose soil complete all as specified and as directed. | 134.4 | CUM | 450 ₹60,480 | 559 ₹75,129.6 | 480 ₹64,512 | 450 ₹60,480 | 300 ₹40,320 | 210 ₹28,224 Lowest | 650 ₹87,360 | 550 ₹73,920 | 780 ₹1,04,832 |
| 5.00 | Excavating in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. or for cable laying or water supply pipes lines etc or not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in soft/ loose soil complete all as specified and as directed. | 534.4 | CUM | 280 ₹1,49,632 | 499 ₹2,66,665.6 | 400 ₹2,13,760 | 400 ₹2,13,760 | 300 ₹1,60,320 | 260 ₹1,38,944 Lowest | 500 ₹2,67,200 | 420 ₹2,24,448 | 375 ₹2,00,400 |
| 6.00 | Excavating in trenches not exceeding 1.5 m wide and exceeding 1.5 m but not exceeding 3.0 in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. or for cable laying or not exceeding 10 sqm on plan and exceeding 1.5 m but not exceeding 3 m in depth and getting out in hard/ dense soil complete all as specified and as directed. | 150 | CUM | 550 ₹82,500 | 599 ₹89,850 | 800 ₹1,20,000 | 810 ₹1,21,500 | 320 ₹48,000 | 275 ₹41,250 Lowest | 600 ₹90,000 | 800 ₹1,20,000 | 900 ₹1,35,000 |
| 7.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in soft/ loose/ hard/ dense soil complete all as specified and as directed. | 1,178.3 | CUM | 90 ₹1,06,047 | 139 ₹1,63,783.7 | 120 ₹1,41,396 | 130 ₹1,53,179 | 50 ₹58,915 Lowest | 54 ₹63,628.2 | 120 ₹1,41,396 | 120 ₹1,41,396 | 145 ₹1,70,853.5 |
| 8.00 | Removing excavated material (excluding hard rock) exceeding 1.50 km but not exceeding 5.0 km and depositing where directed at a level complete all as specified and as directed. | 428.6 | CUM | 450 ₹1,92,870 | 659 ₹2,82,447.4 | 600 ₹2,57,160 | 670 ₹2,87,162 | 105 ₹45,003 | 54 ₹23,144.4 Lowest | 650 ₹2,78,590 | 780 ₹3,34,308 | 760 ₹3,25,736 |
| 9.00 | M & L for cement concrete in foundation, filling and mass concrete in M10(Nominal Mix) using 40 mm nominal size graded crushed stone aggregate complete all as specified and as directed. | 27.8 | Cum | 5,500 ₹1,52,900 | 11,499 ₹3,19,672.2 | 10,500 ₹2,91,900 | 10,300 ₹2,86,340 | 5,000 ₹1,39,000 Lowest | 5,400 ₹1,50,120 | 8,900 ₹2,47,420 | 10,200 ₹2,83,560 | 8,500 ₹2,36,300 |
| 10.00 | M & L for precast cement concrete solid block masonry of grade C(5.0) with concrete M 10 (Nominal Mix) using 20 mm nominal size graded crushed stone aggregate exceeding 10 cm in width and set in cement mortar (1:6) complete all as specified and as directed. | 130 | Cum | 9,000 ₹11,70,000 | 11,499 ₹14,94,870 | 10,800 ₹14,04,000 | 10,800 ₹14,04,000 | 7,000 ₹9,10,000 | 5,940 ₹7,72,200 Lowest | 12,300 ₹15,99,000 | 10,800 ₹14,04,000 | 10,900 ₹14,17,000 |
Tender Value
₹2.6 Cr
EMD Value
₹3.4 L
Closing Date
4 Sept 2025, 6:00 pmClosed
CWE Shillong
HQ CWE Shillong, SE Falls, Shillong - 793011
PROVN OF TRAINING INFRASTRUCTURE AND TRAINING SHED AT SHILLONG UNDER GE SHILLONG
2025_MES_717934_2
8882/SHL/E8
Open Tender
Civil Works
Item Rate
365 days
Shillong
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
GE Umroi
₹3.4 L
Yes
21 Oct 2025
15 Aug 2025
6 Sept 2025
15 Aug 2025
4 Sept 2025
22 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .