RequiredOEM Authorization Certificate Bid to RA enabled No Atomic Absorption Spectrophotometer Aas ( 1 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) TYPE Type of Atomic Absorption Spectrometer (AAS) Double beam Single Beam
RequiredDouble beam Monochromator type Czerny-turner Reflexive grating
RequiredCzerny-turner
RequiredPrisms
RequiredDouble monochromators
RequiredDispersion
RequiredHolographic grating
RequiredEBERT mount
RequiredLITRO 1/7 Detector Type Photo Multiplier Tube (PMT) Photo Multiplier Tube (PMT)
RequiredPhotodiode
RequiredCMOS
RequiredDiode array SPECTRAL Source Wavelength - Minimum 185 180
Required185
Required190 Source Wavelength - Maximum 900 800
Required850
Required900 Accuracy (+/-) 0.01 * Repeatability 0.05 0.05
Required0.1
Required0.15
Required0.2
Required0.25
Required0.3 Diffraction grating (lines/mm) 1800 1200
Required1600
Required1700
Required1800 Wavelength setting and scanning Automatic Automatic
RequiredN/A Slit width Adjustment Automatic Automatic
RequiredN/A Slit width range(nm) 0.1 - 1.0 * Resolution (nm/mm) 0.1 * Bandwidth (nm) 0.1-1.0 0.1-1.0
Required0.1 - 2.0
Required0.1 - 3.0
Required0.1-2.5
Required0.1-1.5 Focal length (mm) 250 to 299 0 to 49
Required50 to 99
Required100 to 149
Required150 to 199
Required200 to 249
Required250 to 299
Required300 and above LIGHT SOURCE Light Source Hollow Cathode Lamp (HCL) * Type of HCL Single element Single element
RequiredMulitiple Element (alloy)
RequiredBoth Single and Mulitiple Element Number of Single element HCLs supplied (inclusive in the scope of supply) 8 * Number of multiple element (alloy) HCLs supplied (inclusive in the scope of supply) N/A 1
Required2
Required3
Required4
Required5
RequiredN/A Measuring modes (K factor and standards) Absorbance Transmittance
RequiredAbsorbance
RequiredConcentration (Wavelength
Requiredtime)
RequiredEmission Detectable Elements using single element HCL Cu
RequiredFe
RequiredZn
RequiredMn
RequiredMg
RequiredB
RequiredK
RequiredMo
RequiredCa
RequiredAs * Detectable Elements using multi element Na-K * 2/7 HCL Measurement level ppm level
Requiredppb level * Lifespan of Single element lamp (mA- Hr) 8000 500
Required1000
Required2000
Required3000
Required4000
Required5000
Required6000
Required7000
Required8000
RequiredN/A Lifespan of multi- element/Alloys lamp (mA-Hr) 8000 500
Required1000
Required2000
Required3000
Required4000
Required5000
Required6000
Required7000
Required8000
RequiredN/A Number of sockets on Turret 8 1
Required2
Required4
Required6
Required8 ATOMIZER Type of atomizer Integrated Flame Burner & GF Flame Burner
RequiredElectro thermal (Graphite furnace)
RequiredIntegrated Flame Burner & GF Nebulizer Pt/Ir nebulizer Pneumatic nebulizer concentric tube
RequiredPneumatic nebulizer cross flow
RequiredFritted disk
RequiredBabington
RequiredUltrasonic
RequiredElectro thermal vaporizer
RequiredPt/Ir nebulizer Background Correction Zeeman background correction D2 Lamp method
RequiredZeeman background correction
RequiredHi-speed reversal method Flame and furnace change over switch Automatic * Burner diameter (mm) 50 50
Required100
RequiredN/A Coolant Liquid type * Sample volume 2 * Corrosion resistant Chamber Yes * Adjustable aerosol based nebulizer flow Yes * Furnace heating range (Degree celcius) 0 - 4000 * Time for analysis (sample) 30 10 - 1200 GENERIC Display through PC inbuilt display
Requiredthrough PC Display type LED LCD with Backlight
RequiredLED
RequiredLCD touchscreen
RequiredTFT
RequiredNA Test result printing Through external printer Through inbuilt Printer
RequiredThrough external printer 3/7 If inbuilt printer
RequiredType of printer N/A Thermal printer
RequiredDot matrix
RequiredLaser b/w
RequiredInkjet b/w
RequiredColor laser
RequiredColor inkjet
RequiredN/A Connectivity USB
RequiredETHERNET
RequiredRS 232 * Safety sensors Pressure sensor
RequiredFlame Sensor
RequiredFlame Ignition Sensor
RequiredBurner interlock
RequiredPower failure protection
RequiredNebulizer Sensor
RequiredAuto ignition Pressure sensor
RequiredFlame Sensor
RequiredFlame Ignition Sensor
RequiredBurner interlock
RequiredN/A
RequiredPower failure protection
RequiredNebulizer Sensor
RequiredAuto ignition Burner movement (lateral
Requiredhorizontal & height) Automatic Automatic
RequiredMannual
RequiredN/A POWER SOURCE Power Supply 230 V A.C ± 10%
Required50 Hz * OPERATING CONDITIONS Minimum Operating Temperature 15 -5
Required-10
Required0
Required5
Required10
Required15 Maximum Operating Temperature 45 35
Required45
Required50
Required55
Required60 Operating Humidity (RH) (%) at 40 degree c 85 80
Required85
Required90
Required95 ACCESSORIES Type of gas cylinders Acetylene Acetylene
RequiredNitrous oxide
RequiredN/A Type of Regulators supplied With Heater With Heater
RequiredWithout Heater
RequiredNA Number of Regulators Supplied (inclusive in the scope of supply) 1 0
Required1
Required2
Required3
Required4 Number of Acetylene Cylinders supplied (inclusive in the scope of supply) 1 0
Required1
Required2
Required3
Required4 Capacity of each Acetylene cylinder (Litres) 40 5
Required10
Required20
Required40
Required47
Required50
RequiredN/A Number of Nitrous oxide Cylinders supplied (inclusive in the scope of supply) 1 0
Required1
Required2
Required3
Required4 Capacity of each Nitrous oxide cylinder (Litres) 40 5
Required10
Required20
Required40
Required47
Required50
RequiredN/A Gas cylinders confirming to IS : 7285 latest * Gas cylinders having PESO certificate Yes Yes
RequiredN/A 4/7 Other accessories (inclusive in the scope of supply) Gas flow control box
RequiredOil Moisture Filters
RequiredSS Exhaust fume hood with blower
RequiredSchematic diagram and instruction manual
RequiredAuto sampler Gas flow control box
RequiredOil Moisture Filters
RequiredSS Exhaust fume hood with blower
RequiredSchematic diagram and instruction manual
RequiredHydride generator
RequiredAuto sampler
RequiredN/A Suitable software for connecting PC & Printer (inclusive in the scope of supply) Yes Yes
RequiredN/A Any other features/accesories covered in scope of supply - * WARRANTY AVAILABILITY OF SPARES warranty (Year) 2 1
Required2
Required3
Required4
Required5 Spares and Consumables inclusive in the scope of supply Yes Yes
RequiredNo CERTIFICATION Availability of UL/CE Certification as per EN 61010-1:2010 Safety requirements for electrical equipment for measurement
Requiredcontrol
Requiredand laboratory use General requirements Yes Yes
RequiredNo Conformance to EMC/EMI as per EN 61326-1:2013 Electrical equipment for measurement
Requiredcontrol and laboratory use Yes Yes
RequiredNo Availability of Test Reports from Central Govt/NABL approved/ILAC accredited Lab to prove conformity to the specification Yes Yes
RequiredNo If yes test report to furnished
Requiredto the buyer on demand Yes * Test Report number and date - * Name and address of - * 5/7 the Lab * Bold specifications are the golden parameters.