| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER |
| 2 | L2₹2.8 L+₹72,611.30 (35.4%)Rejected-Finance JAITPUR JAYANT SINGRAULI PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | ₹2.8 L+₹72,611.30 (35.4%) | L2 | Rejected-Finance NOT L1 DIDDER |
| 3 | L3₹3.4 L+₹1.4 L (66.9%)Rejected-Finance REHTA SAMUDAYIK BHAWAN POST KAKRI SONBHADRA UTTAR PRADESH 231224 | KAKRI | SONBHADRA | UTTAR PRADESH | 231224 | ₹3.4 L+₹1.4 L (66.9%) | L3 | Rejected-Finance NOT L1 DIDDER |
| Sl No | Description | Qty | Unit | M/s Bright Engineering L2 | M/s VISHWAKARMA ENTERPRISES L3 | Shree ram engineering works L1 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc. 1. Cleaning of power rail path. 2. Cleaning of Gearboxes for both Main and Auxiliary cranes. 3. Cleaning of Brake Assemblies of Main and Auxiliary cranes. 4. Changing of Gear oil of Both Main and Auxiliary cranes. 5. Tightening and alignment of Rail Line Bolts and Nuts. 6. Repairing and overhauling Brake assembly of both Main & Auxiliary hoist systems. 7. Overhauling Gearbox of both Main & Auxiliary hoist systems. 8. Dismantling, greasing and fitment of couplings of gearbox assembly. 9. Dismantling, greasing and fitment of brake spares of Brake assembly. 10. Calibration and testing of crane for safe and proper operation of EOT cranes. Note: Maximum requirement of manpower will be 1. Skilled Fitter for 18 nos. manshifts, 2. Skilled Welder for 08 nos. manshifts 3. Skilled Electrician for 05 nos. manshifts 4. Skilled Grinder man for 08 nos. manshifts, 5. Semi-Skilled Fitter for 08 nos. manshifts and 6. Un-killed manpower for 13 nos. manshifts. | ||||||
| 2.00 | Labour charges for above mentioned scope of work including contractor profit. | 1 | Job | 29,000 ₹29,000 Lowest | 47,500 ₹47,500 | 48,500 ₹48,500 |
| 3.00Materials required for repairing of repairing of above job. | ||||||
| 3.01 | Cost of LT brake liner Part No 20403/306/2 | 4 | Nos. | 2,500 ₹10,000 | 4,000 ₹16,000 | 1,600 ₹6,400 Lowest |
| 3.02 | Cost of Hoist brake liner part No 204/306/104 | 4 | Nos. | 3,500 ₹14,000 | 4,000 ₹16,000 | 1,500 ₹6,000 Lowest |
| 3.03 | Cost of Delay Relay timer | 4 | Nos. | 4,600 ₹18,400 | 2,500 ₹10,000 Lowest | 2,500 ₹10,000 Lowest |
| 3.04 | Cost of CT tripping brake Assembly | 2 | Nos. | 15,000 ₹30,000 | 23,000 ₹46,000 | 9,000 ₹18,000 Lowest |
| 3.05 | Cost of Auxiliary contactor (3TA-22100A-11OAC) | 3 | Nos. | 7,500 ₹22,500 | 3,500 ₹10,500 Lowest | 6,500 ₹19,500 |
| 3.06 | Cost of H.L.C Auxiliary contactor | 3 | Nos. | 10,500 ₹31,500 | 3,500 ₹10,500 Lowest | 7,100 ₹21,300 |
| 3.07 | Cost of Repairing thruster brake assembly | 3 | Nos. | 11,500 ₹34,500 | 13,000 ₹39,000 | 8,500 ₹25,500 Lowest |
Tender Value
₹3.1 L
EMD Value
₹4,000
Closing Date
9 Mar 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. - 231222
Repair/overhauling and maintenance of complete system of EOT Crane at Dumper Workshop (New Workshop) at Khadia Project.
2026_NCL_354427_1
KHD/G.M. (Excv)/E-Tender/25-26/1253
Open Tender
Excavation Department Work
Item Rate
13 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,000
24 Aug 2026
24 Feb 2026
10 Mar 2026
24 Feb 2026
9 Mar 2026
25 Feb 2026
24 Feb 2026 - 4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Scope of Work/Technical Specifications etc. 1. Cleaning of power rail path. 2. Cleaning of Gearboxes for both Main and Auxiliary cranes. 3. Cleaning of Brake Assemblies of Main and Auxiliary cranes. 4. Changing of Gear oil of Both Main and Auxiliary cranes. 5. Tightening and alignment of Rail Line Bolts and Nuts. 6. Repairing and overhauling Brake assembly of both Main & Auxiliary hoist systems. 7. Overhauling Gearbox of both Main & Auxiliary hoist systems. 8. Dismantling, greasing and fitment of couplings of gearbox assembly. 9. Dismantling, greasing and fitment of brake spares of Brake assembly. 10. Calibration and testing of crane for safe and proper operation of EOT cranes. Note: Maximum requirement of manpower will be 1. Skilled Fitter for 18 nos. manshifts, 2. Skilled Welder for 08 nos. manshifts 3. Skilled Electrician for 05 nos. manshifts 4. Skilled Grinder man for 08 nos. manshifts, 5. Semi-Skilled Fitter for 08 nos. manshifts and 6. Un-killed manpower for 13 nos. manshifts. | |||||
| 2 | Labour charges for above mentioned scope of work including contractor profit. | 1 | Job | 48,562 | ₹48,562 |
| 3Materials required for repairing of repairing of above job. | |||||
| 3.01 | Cost of LT brake liner Part No 20403/306/2 | 4 | Nos. | 2,550 | ₹10,200 |
| 3.02 | Cost of Hoist brake liner part No 204/306/104 | 4 | Nos. | 3,400 | ₹13,600 |
| 3.03 | Cost of Delay Relay timer | 4 | Nos. | 4,200 | ₹16,800 |
| 3.04 | Cost of CT tripping brake Assembly | 2 | Nos. | 15,500 | ₹31,000 |
| 3.05 | Cost of Auxiliary contactor (3TA-22100A-11OAC) | 3 | Nos. | 10,200 | ₹30,600 |
| 3.06 | Cost of H.L.C Auxiliary contactor | 3 | Nos. | 15,600 | ₹46,800 |
| 3.07 | Cost of Repairing thruster brake assembly | 3 | Nos. | 12,900 | ₹38,700 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.32 MB
COC_ATC.pdf
Tender Documents • 1.44 MB
ITB.pdf
Tender Documents • 0.38 MB
BOQ_367252.xls
BOQ • 0.33 MB
Annexures.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .