| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | L1 | Accepted-Finance lowest rate | |
| 2 | L2₹3.5 L+₹4,602 (1.35%)Rejected-Finance | L2 | Rejected-Finance high rate | |
| 3 | L3₹3.5 L+₹7,080 (2.08%)Rejected-Finance | L3 | Rejected-Finance high rate |
Tender Value
₹3.4 L
Closing Date
8 Aug 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CDR HQ 135 WKS ENGRS
HQ 135 WKS ENGRS PIN-914135 C/O 56 APO
job order
2020_MES_363015_2
3014/Q/03/E3
Limited
Miscellaneous Goods
Supply
HQ 135 WKS ENGRS
as per NIQ
3 documents required · 3 mandatory
₹0
Exempted
13 Aug 2020
25 Jul 2020
11 Aug 2020
27 Jul 2020
8 Aug 2020
27 Jul 2020
30 days
1. Standard Penetration Test as (SPT) Per IS-2131-1981 with the help of shell and auger method from NGL and preparation of bore hole dia 100 to 150 mm upto 6.0 mtrs./ refusal for bldg including boring/ drilling 100 mm dia bore holes through any type of soil/ rock stratum, collection of disturbed/ undistribed soil samples at 1000mm, 1500mm, 2000mm, 3000mm, 4000mm, 5000mm and 6000mm or closer intervals on change of strata which ever is less using sampling equipment as per IS-1892 and undertaning standard penetration tests as per IS-2131 of Dynamic core penetration as test (depending upon the soil strata) as per IS 10042 for following scapes: (a) 100 mm dia bore of 06 mtr depth for 2 x Igloos @ 03 bores/ test location per Igloo (06 Nos /36RM) (b) 100mm dia bore of 6 m depth for VIFT/ Retaining wall @ 01 bore holes for VIFT of each Igloo (Total-02 Nos/ 12RM) (c) 100 mm dia bore of 6 m depth for 2 x SWT @ 01 bore holes of SWT (Total-02 Nos/ 12RM) 2. Evaluation of following index properties of soil through testing of soil samples in approved laboratory as per relevant parts of IS 2720:- (a) Atterberg Limits (liquid limits, plastic limits and shinkage limits). (b) Natural moisture content (c) Wet and dry density of soil (d) Soil particle size distrubution using sieve/ hydrometeranalysis (e) Tri-axial sherar test C &D determination (f) Shrinkage limit (g) Consolidation test (h) Specific gravity test for sand/rock (j) Curshing strength of rack samples (k) permeability test (l) Chemical analysis of ground water sample (min 02 samples) (m) Free soil index (n) Chemical analysis of soil (o) Cone resistance with bore hole log including geographical representation (p) Fricition resistance with bore hoge log including geograhical representation (q) Topography factor test (r) Terrian factor test (s) Drag coefficient test. 3. Determination of safe bearing capacity for the following type of foundations:- (a) RCC Raft foundation for buildings at depth from 1000 mm, 1500mm, 2000mm, 3000mm, 4000mm , 5000mm and 6000mm and more at interval of 500 mm as per relvant IS codes works out on shear as well settlement criteria. (b) RCC raft/ strip foundations for VIFT/ retaining walls at 1000mm, 1500 mm, 2000mm, 3000mm, 4000mm, 5000mm and 6000mm intervals starting from 500mm below GI as per relvant IS code worked out on shear as well as settlement criteria (c) Recommending appropriate valve of safe bearing capacity. 4. Conducting of Contouring Survey at 3.00 Mtr interval with respect to Bench Mark for entire work site of the job on tracing paper approx area 7650 sqm complete all as directed by Engr-in-Charge. 5. Maintenance of videographic/photographic record of soil exploration/ Testing event incl 06 hard copies of Soil Investigation report and conturing survey alongwith soft copy (Compact Disc) to the Engr-in-Charge. 6. Prepartion and submission of detailed Report consisting of following:- (a) layout plan of proposed works and relative positions of test locations. (b) General geography and overview of soil strata and soil properties (c) Bore log charts, soil clarification and other index properties determined (d) Evaluation/ calculations of SBC and other soil parameters as per relevant IS code (e) Recommendations of type of foundations depth an SBC to be adopted for foundation designs (f) Any soil improvement reqd prior to construction of foundation (g) Depth of ground water table if encountered & its effect on SBC (h) Recommendations on drainage of site. 7. Soil investigations will be undertaken under supervision of Geo engineer and report will be vetted by IIT/Govt Engg College/ Geotechincal Engineer holding master degree in soil/ geotechincal engineering
Research and Engineer Enterprises
Shree Hari Test House
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_406370.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .