Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -2.00% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | +1.00% | ₹1.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | +1.50% | ₹1.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹2,940
Closing Date
17 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of Culvert in Saryara Mohalla Bayala ward no. 06 Pyt Mari-B Block and Distt Reasi under capex DDC for the year 2026-27
2026_RDPR_320077_28
e-NIT No. 92 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
120 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,940
23 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
17 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressingof sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 2.72 | cum | 479.3 | ₹1,303.7 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.08 | cum | 4,826 | ₹5,212.08 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 20% Boulders | 8.16 | CUM | 4,294 | ₹35,039.04 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.37 | CUM | 9,821 | ₹33,096.77 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for.Retaining walls, return walls, walls (any thickness) including attached pilasters | 14.87 | sqm | 628 | ₹9,338.36 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for. Above 20 cm wide | 2.16 | sqm | 1,145 | ₹2,473.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for. Above 20 cm wide | 1.23 | sqm | 1,145 | ₹1,408.35 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for. Slab | 7.43 | sqm | 718.2 | ₹5,336.23 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for. Foundation. | 11.9 | sqm | 286.25 | ₹3,406.38 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Cold twisted bars | 320.27 | sqm | 123 | ₹39,393.21 |
stage.html
html • 0.02 MB
finance_1063761.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_1063761.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].