Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹19.0 L
EMD Value
₹25,000
Closing Date
24 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Bruhat Bengaluru Mahanagara Palike
Subramanya J V
Landscape Development of Jayanagar housing Society park gubbalala main road Ward no-184 uttarahalli in Bommanahalli zone Part-5 CALL-2
BBMP/2024-25/OW/WORK_INDENT4720
BBMP/2024-25/OW/WORK_INDENT4720
Reserved
Other Works
Electronic Documents, First(One Cover)
BBMP Senior Assistant Director of Horticulture Bommanahalli
7 documents required · 7 mandatory
₹500
₹25,000
16 Nov 2024
16 Nov 2024
19 Nov 2024
Landscape Development of Jayanagara housing Society park gubbalala main road Ward no-184 uttarahalli in Bommanahalli zone Part-5
SITE /JUNGLE CLEARENCE: Cutting and clearing thin jungle including removal of roots with a intitial lead of 50 m and life of 1.50 m and General Cleaning: Removal of dried leaves solid waste and cleani...
Planting of TreesDigging pits of size 0.75mx0.75mx0.75m and filling upto 50% of the pits with top excavated soil and remaining 50% with sand(0.035 Cum), Fym(0.070Cum), Red Earth(0.105Cum).(i.e, in the...
Cost of the Plant 5-10 Height
Planting of Shrubs Shrubs in Isolated Plants. Digging pits of size 0.45x0.45x0.45 filling up to 50% of the pits with top excavated soil and remaining 50% with the mixture of sand (0.007Cum) FYM (0.014...
Cost of the Plant ( including Transportation and Handling Charges)
Shrubs in Groups Developing the area for shrubs by digging to a depth of 0.45m, filling 50% with sand [0,0375 Cum], FYM [0.075 Cum], Red earth [0.21], [I.e. in the proportion of 1:2:3] and planting wi...
Cost of the Plant (8 Plants per Sqm) including Transportation and Handling Charges
Hedges Developing hedges by digging trenches of size 0.45mx0.45m, filling 50% of the trench with excavated top soil and remaining 50% with the mixture of sand (0.0112 Cum), FYM (0.0224Cum) (i.e. in th...
Cost of plants [7 Plant per Rmt]
Mound Formation: Providing and forming mound using red earth by filling, spreading and leveling to the required grade s per design. (including scraping and removing top layer of soil,removing unwanted...
DEVELOPMENT OF LAWNSCRAPING AND REMOVING TOP SOIL Cleaning the site by scraping and removing top layer of soil, removing unwanted debris, grass, along with excavated earth to a distance of 500m from t...
1st DIGGING FOR LAWN Earthwork digging including removing weeds. debris if any and breaking of clumps watering etc., to a depth of
2nd DIGGING FOR LAWN Digging for second time and removing weeds if any miner leveling to a depth of 0.45m
Soil Filling for Lawn Supply and stocking good quality red earth etc., for filling the top layer to a depth of 0.15m
Providing Sand, FYM and Red earth in the ratio of 1:3:6 and spreading to a depth of 7.5 cm at the required site
Chemical Fertilizer Super Phospates (50 gm/Sq.m:Rs. 0.1.00/ Sq.m), Neeem oil cake (250gm/Sq.m:Rs. 6.00/Sq.m), Bone meal (250gm/Sq.m: Rs. 4.00/Sq.m), Potash (50 gm/Sq.m:Rs.1.00/Sq.m), Furodon(25gm/Sq.m...
Supply of lawn grass Turf
Supplying of Red Soil (New Earth Filling)Supply of Good Quality Red Soil for Gardening and Growing of Plants, Shrubs, Etc., Including the % weightage given to B.B.M.P. Area. (1000*0.1)
Planting of specimen plants Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Chry...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Rapi...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Cyca...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Ficu...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Ficu...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Ficu...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Noli...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Plum...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Plum...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Gold...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Thuj...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Alpi...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Term...
Sprinkler System: Providing and fixing of sprinkler system with in the site by using 25mm/10kg,40mm/6kg, 50mm/6kg good quality PVC pipes,ISI marked sprinklers, control valves and fitiings etc, Includi...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW 1 Part 5.docx
Tender Document • 0.11 MB
Notification Developmen.docx
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .