| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC ELECTRICAL DIVISION HPSEBL MANDI | L1 | Accepted-AOC Lowest rates | |
| 2 | L2₹1.1 L+₹8,580.27 (8.28%)Rejected-Finance HIMACHAL PRADESH HP | L2 | Rejected-Finance Higher rates | |
| 3 | L3₹1.3 L+₹23,545.18 (22.7%)Rejected-Finance VPO JHAJRA TEHSIL NALAGARH DISTT SOLAN | SOLAN | HIMACHAL PRADESH | 171102 | L3 | Rejected-Finance Higher rates |
Tender Value
₹1.4 L
EMD Value
₹1,445
Closing Date
24 Jan 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. executive Engineer
Electrical Division,HPSEBL,Arki
Providing LT extension 3phase and LT augmentation at village Jagota from existing 100KVA SStn. Haripur and providing LT extension 1phase and LT augmentation 1 at village Upper Kaniyara from existing 25KVA SStn. Upper Kaniyara Grown Ghatti in Electric
2026_HPSEB_125636_1
HPSEBL/AED/NIT-39/2025-26
Open Tender
Electrical Works
Percentage
60 days
Under ED Arki
Please refer Tender documents.
11 documents required · 11 mandatory
₹590
₹1,445
6 Feb 2026
15 Jan 2026
27 Jan 2026
15 Jan 2026
24 Jan 2026
15 Jan 2026
Material Part of LT Line. (Section Patta Browry) (TS. No. 119/2025-26) (WBS No. 32100430-001-ARK-LT-070)
ACSR 6/1/2.59, 30mm2 (includes 2 conductor lengths for 1-phase and additional 1% ( sag, jumpering and wastage). (Provided by HPSEBL)
Steel Tubular poles 9 Mtr. Long. (Provided by HPSEBL)
Muffs with concrete filling.
Shackle Insulator (16KN).
D-Iron (U- Clamps).
LT Stay Set.(i/c Stay Clamp) (Provided by HPSEBL)
Stay Wire (7/3.15mm). (6.0Kg Per Stay Set).
Earth wire (GI 8SWG) ( additional 1% sag & wastage) @ 0.102kg/m. (Provided by HPSEBL)
Nuts and Bolts of various sizes (galvanised/ Coated preferably 16mm or more with flat and spring washers).
Aluminium Paint.
PVC Spacer
Material Part of LT Line. (Section Patta Browry) (TS. No. 121/2025-26) (WBS No. 32100430-001-ARK-LT-072)
ACSR 6/1/3.35, 50mm2 (includes 2 conductor lengths for 1-phase and additional 1% ( sag, jumpering and wastage). (Provided by HPSEBL)
Steel Tubular poles 9 Mtr. Long. (Provided by HPSEBL)
Muffs with concrete filling.
Shackle Insulator (16KN).
D-Iron (U- Clamps).
Earth Knob
LT Stay Set.(i/c Stay Clamp) (Provided by HPSEBL)
Stay Wire (7/3.15mm). (6.0Kg Per Stay Set).
Earth wire (GI 8SWG) ( additional 1% sag & wastage) @ 0.102kg/m. (Provided by HPSEBL)
Nuts and Bolts of various sizes (galvanised/ Coated preferably 16mm or more with flat and spring washers).
Aluminium Paint.
PVC Spacer
Erection Part of LT Line. (Section Patta Browry) (TS. No. 119/2025-26) (WBS No. 32100430-001-ARK-LT-070)
Erection of Steel Tubular Pole (8/9 Mtr long Single Pole Str.):- Digging of Pit, Drilling of holes in pole X-Arm, Erection of Pole, Erection of X-Arm, Shackle Insulator, Filling of Pit and ramming, Fixing of bracket, Painting of poles. (Complete in all respect according to REC construction standards)
Erection of Stay Set LT:- Digging of Pit, Fixing of Stay Rod, Filling of Pit, Nozzeling & Tighting .(Complete in all respect according to REC construction standards.)
Sagging of Conductor:- ACSR / AAAC 30mm2, Laying of Conductor, Stringing & Sagging, Binding with Insulator . (Complete in all respect according to REC construction standards.) (Single conductor)
De-Sagging of Conductor:-(Complete in all respect according to REC construction standards.) (Single conductor)
Laying stringing & sagging of GI wire. (Single conductor)
Mannual carriage of LT line material
Erection Part of LT Line. (Section Patta Browry) (TS. No. 121/2025-26) (WBS No. 32100430-001-ARK-LT-072)
Erection of Steel Tubular Pole (8/9 Mtr long Single Pole Str.):- Digging of Pit, Drilling of holes in pole X-Arm, Erection of Pole, Erection of X-Arm, Shackle Insulator, Filling of Pit and ramming, Fixing of bracket, Painting of poles. (Complete in all respect according to REC construction standards)
Erection of Stay Set LT:- Digging of Pit, Fixing of Stay Rod, Filling of Pit, Nozzeling & Tighting .(Complete in all respect according to REC construction standards.)
Sagging of Conductor:- ACSR / AAAC 50mm2, Laying of Conductor, Stringing & Sagging, Binding with Insulator . (Complete in all respect according to REC construction standards.) (Single conductor)
Laying stringing & sagging of GI wire. (Single conductor)
Mannual carriage of LT line material
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
SBD39.pdf
Tender Documents • 2.61 MB
BOQ_185163.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .