| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹9.3 L+₹4,790.50 (0.52%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹9.4 L+₹14,415 (1.56%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹9.8 L+₹49,956.76 (5.40%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest | |
| 5 | L5₹10.7 L+₹1.4 L (15.4%)Rejected-Finance | L5 | Rejected-Finance 5th Lowest |
Tender Value
₹7.9 L
EMD Value
₹13,100
Closing Date
16 Dec 2019, 4:00 pmClosed
Executive Engineer Division No-I HPPWD Shimla-3
Executive Engineer Division No-I HPPWD Shimla-3
Construction of Bhatta Kuffar to koti road km 0/00 to 6/885 (SH C/O Hume pipe culvert at RD 1/120 with wing wall both side of culvert)(Under SCCP
2019_PWD_33008_3
SD-I-CTR-19-20 16640 dt 15-11-2019
Open Tender
Civil Works
Item Rate
60 days
Shimla
As per SBD
12 documents required · 12 mandatory
₹350
Executive Engineer Division No-I HPPWD Shimla-3
₹13,100
30 Jan 2020
4 Dec 2019
17 Dec 2019
4 Dec 2019
16 Dec 2019
4 Dec 2019
Amount
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads & lifts as per drawing and Technical Specification Clause 1603.1 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Earth work in excavation for structure in all depths as per drawing and technical specification for rural roads August 2004 clause 305.1 including setting out, construction of shoring abd bracing, removal of stumps and other deleterious materials and disposal in all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where balsting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) Cement Mortar 1:6:12(one cement:six sand: twelve graded stone aggregate 40mm(forty milimetre) nominal size).
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) Cement Mortar 1:4:8(one cement:four sand:eight graded stone aggregate 20mm(twenty milimetre) nominal size).
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702,704,1202 and 1204 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a)Random rubble masonry (i) In cement mortar 1:6(one cement:six sand).
Construction of dry rubble masonry for retaining walls, breast walls, revetment walls and parapets etc. for substructure and super structure complete as per drawing and technical specifications clause 704.6 & 1302.5 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per specification clause 1204.3.8 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) Granular material.
Providng and laying reinforced cement concrete pipe NP2 (Two) 900mm (nine hudnred milimetre) dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2(One cement:two sand) but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets complete as per drawing and MORD technical specification clause 1108 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
20cm (Twenty centimetre)flagged stone flooring laid in cement mortar 1:3(One cement : three sand) including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Suresh Chand Suman
NIPUN CHAUHAN ASSOCIATES
LAIQ RAM
Baru Thakur
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .