Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹2.4 L (0.79%)Admitted-Finance | ₹3.1 Cr+₹2.4 L (0.79%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹2.7 L (0.88%)Admitted-Finance PURAINA PURE HIMANCHAL HOUSE NO 123 MALAON PARASPUR GONDA | GONDA | UTTAR PRADESH | 271001 | ₹3.1 Cr+₹2.7 L (0.88%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Madhav and Raghav Inframech Pvt. Ltd. L1 | KALBANDE CONSTRUCTION L2 | M/S J AND V INFRATECH PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Work Name - Interception & Diversion of Nallahs with STP works Project of Pipla Narayanwar town under SBM 2.0 | ||||||
| 2.00 | 1. Design and build sewage treatment plant of installed capacity 1.1 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 0.594 Km length Gravity main Line 0.80 Km pumping main line including survey, design, construction of 01 No. of Pumping stations and all appurtenant structures and allied works; and
3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 5 year, starting from the date of commission of the project | 1 | Job | 3,08,86,544 ₹3,08,86,544 Lowest | 3,11,30,786 ₹3,11,30,786 | 3,11,57,771 ₹3,11,57,771 |
Tender Value
₹3.4 Cr
EMD Value
₹1.7 L
Closing Date
21 Dec 2024, 5:30 pmClosed
C.M.O. NAGAR PARISHAD, PIPLANARYNWAR
C.M.O. NAGAR PARISHAD, PIPLANARYNWAR
Interception And Diversion of Nallahs with STP works Project of Pipla Narayanwar town under SBM 2.0
2024_UAD_382156_1
780/PWD/NP/2024
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Lump-sum
365 days
Work
AS PER NIT AND TENDER DOC
5 documents required · 5 mandatory
₹15,000
₹1.7 L
C.M.O. NAGAR PARISHAD, PIPLANARYNWAR
9 Jan 2025
14 Nov 2024
23 Dec 2024
14 Nov 2024
21 Dec 2024
14 Nov 2024
2 Dec 2024
Amount
Work Name - Interception & Diversion of Nallahs with STP works Project of Pipla Narayanwar town under SBM 2.0
1. Design and build sewage treatment plant of installed capacity 1.1 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 0.594 Km length Gravity main Line 0.80 Km pumping main line including survey, design, construction of 01 No. of Pumping stations and all appurtenant structures and allied works; and 3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 5 year, starting from the date of commission of the project
KALBANDE CONSTRUCTION (BID ID -1159389)
M/S J AND V INFRATECH PRIVATE LIMITED (BID ID -1158171)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .