| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 3₹2.9 Cr+₹16.2 L (4.64%)Accepted-AOC | ₹2.9 Cr+₹16.2 L (4.64%) Quoted ₹3.6 Cr | 3 | Accepted-AOC As During discussion with RGTSC HPGCL the firm revised rate are Lower than other firms. |
| 2 | 1₹3.5 CrRejected-AOC | ₹3.5 Cr | 1 | Rejected-AOC As During discussion with RGTSC HPGCL the firm revised rate are higher than CUBIX Engineering Solution. |
| 3 | 2₹3.6 Cr+₹9.8 L (2.81%)Rejected-AOC A 45 NTPC VIDYUT NAGAR DADRI GB NAGAR 201008 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | ₹3.6 Cr+₹9.8 L (2.81%) | 2 | Rejected-AOC As During discussion with RGTSC HPGCL the firm revised rate are higher than CUBIX Engineering Solution. |
| 4 | 4₹3.7 Cr+₹24.1 L (6.94%)Rejected-Finance 3 RD FLOOR CHANAKAYA COMPLEX NEAR VANIYAWAD CIRCLE VILLAGE TOWN NADIAD CITY NADIAD KHEDA GUJARAT 387001 INDIA | KHEDA | GUJARAT | 387001 | ₹3.7 Cr+₹24.1 L (6.94%) | 4 | Rejected-Finance Bidder quoted rate are not with in 5 percent |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualified for not having sufficient Average Annual Turnover during last three years as per PQR of e-NIT |
| Sl No | Description | Qty | Unit | UNITED ENGINEERING L1 | POWERTECH ENGINEERING CO L2 | Cubix Engineering Solution L3 | GIMS ENERGY PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|
| 1.00Part-A: Lump-sum rates for Overhauling of Boiler Pressure Parts, High Pressure Valves, Burners, Wind-Box, Restoration of Drip Seal Shield Assembly, Revival/Re-Installation of ERVS, Revival of Dummied Reducers in penthouse, Restoration of sagged roof of penthouse and providing cup-lock Scaffolding inside the Furnace during forthcoming overhauling of Unit # 2 of 2x600 MW, RGTPP, Khedar, Hisar. | |||||||
| 1.01 | A1: Total lump-sum rate for overhauling of boiler pressure parts, high pressure valves, burners, wind-box, restoration of drip seal shield assembly, revival/re-installation of ERVs, revival of dummied reducers inside penthouse, restoration of sagged roof of penthouse, installation of new motorized valves of make M/s BHEL, repair/hard-facing of coal compartment assemblies and application of ceramic blanketing (as per scope of work). | 1 | Job | 2,37,00,000 ₹2,37,00,000 | 2,24,00,000 ₹2,24,00,000 | 2,47,50,000 ₹2,47,50,000 | 2,23,00,000 ₹2,23,00,000 Lowest |
| 1.02 | A2: Lump-sum rate for supply, erection and dismantlement of cup-lock scaffolding (as per scope of work). | 1 | Job | 52,00,000 ₹52,00,000 | 57,00,000 ₹57,00,000 | 48,50,000 ₹48,50,000 Lowest | 74,00,000 ₹74,00,000 |
| 2.00Part-B Rates | |||||||
| 2.01 | HP joint including cutting, edge preparation, pre-heating, post-heating, heat treatment using thermal gun or flame torch etc. up to 80 mm for metallurgy other than SA213-T91 | 500 | Nos. | 200 ₹1,00,000 Lowest | 300 ₹1,50,000 | 400 ₹2,00,000 | 700 ₹3,50,000 |
| 2.02 | HP joint including cutting, edge preparation, pre-heating, post-heating, heat treatment using thermal gun or flame torch etc. up to 80 mm for metallurgy SA213-T91 | 10 | Nos. | 250 ₹2,500 Lowest | 400 ₹4,000 | 500 ₹5,000 | 700 ₹7,000 |
| 2.03 | Metal build up on worn out tubes. Each build-up of size 100mmX25mm shall be considered as 01 no. build up | 1,200 | Nos. | 100 ₹1,20,000 Lowest | 900 ₹10,80,000 | 400 ₹4,80,000 | 675 ₹8,10,000 |
| 2.04 | Lowering of any eco coil (upper & lower) repositioning after carrying out work/replacement wherever required. HP joints excluded. | 4 | Nos. | 500 ₹2,000 Lowest | 2,000 ₹8,000 | 3,000 ₹12,000 | 1,500 ₹6,000 |
| 2.05 | Lifting of any LTSH coil (upper & lower) repositioning after carrying out work/ replacement wherever required. HP joints excluded. | 3 | Nos. | 500 ₹1,500 Lowest | 2,000 ₹6,000 | 3,000 ₹9,000 | 1,500 ₹4,500 |
| 2.06 | Replacement of damaged skin casing /welding | 15 | per sq. meter | 100 ₹1,500 Lowest | 100 ₹1,500 Lowest | 200 ₹3,000 | 600 ₹9,000 |
Tender Value
Refer Docs
EMD Value
₹7.3 L
Closing Date
15 Dec 2025, 11:00 amClosed
RAKESH HARSH
CE RGTPP Khedar Hisar
Overhauling of Boiler Pressure Parts, High Pressure Valves, Burners, Wind-Box, Restoration of DSS Assembly, Revival or Re-installation of ERVS, Revival of Dummied Reducers, Restoration of sagged roof during forthcoming OH of Unit 2, 2x600 MW RGTPP
2025_HBC_483221_1
202548E58711 5F5B 4624 9C31 B06214271330712PGC
Open Tender
Power/Energy Projects/Products
Works
60 days
KHEDAR
as per attached tender document
2 documents required · 2 mandatory
₹1,180
₹7.3 L
Yes
3 Sept 2026
13 Nov 2025
18 Dec 2025
13 Nov 2025
15 Dec 2025
13 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part-A: Lump-sum rates for Overhauling of Boiler Pressure Parts, High Pressure Valves, Burners, Wind-Box, Restoration of Drip Seal Shield Assembly, Revival/Re-Installation of ERVS, Revival of Dummied Reducers in penthouse, Restoration of sagged roof of penthouse and providing cup-lock Scaffolding inside the Furnace during forthcoming overhauling of Unit # 2 of 2x600 MW, RGTPP, Khedar, Hisar. | |||||
| 1.01 | A1: Total lump-sum rate for overhauling of boiler pressure parts, high pressure valves, burners, wind-box, restoration of drip seal shield assembly, revival/re-installation of ERVs, revival of dummied reducers inside penthouse, restoration of sagged roof of penthouse, installation of new motorized valves of make M/s BHEL, repair/hard-facing of coal compartment assemblies and application of ceramic blanketing (as per scope of work). | 1 | Job | - | - |
| 1.02 | A2: Lump-sum rate for supply, erection and dismantlement of cup-lock scaffolding (as per scope of work). | 1 | Job | - | - |
| 2Part-B Rates | |||||
| 2.01 | HP joint including cutting, edge preparation, pre-heating, post-heating, heat treatment using thermal gun or flame torch etc. up to 80 mm for metallurgy other than SA213-T91 | 500 | Nos. | - | - |
| 2.02 | HP joint including cutting, edge preparation, pre-heating, post-heating, heat treatment using thermal gun or flame torch etc. up to 80 mm for metallurgy SA213-T91 | 10 | Nos. | - | - |
| 2.03 | Metal build up on worn out tubes. Each build-up of size 100mmX25mm shall be considered as 01 no. build up | 1,200 | Nos. | - | - |
| 2.04 | Lowering of any eco coil (upper & lower) repositioning after carrying out work/replacement wherever required. HP joints excluded. | 4 | Nos. | - | - |
| 2.05 | Lifting of any LTSH coil (upper & lower) repositioning after carrying out work/ replacement wherever required. HP joints excluded. | 3 | Nos. | - | - |
| 2.06 | Replacement of damaged skin casing /welding | 15 | per sq. meter | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_561222.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .