Tender Value
₹57.6 Cr
EMD Value
₹28.8 L
Closing Date
5 Oct 2026, 6:00 pm
Executive Engineer, Public Works Division, Pune 1.
Executive Engineer, Public Works Division, Pune 1.
34-1 - Construction of Advanced Training Centre for Instructor at I.T.I. Aundh, Pune. (Including Electrical Work)
2026_PWDRP_1339980_1
E-Tender Notice No. 34 for 2026-2027
Open Tender
Civil Works - Buildings
Item Rate
540 days
I.T.I. Aundh Pune
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹28.8 L
Chief Engineer, Public Work Region, Pune.
19 Sept 2026
19 Sept 2026
6 Oct 2026
19 Sept 2026
5 Oct 2026
19 Sept 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK - Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. | 8,800 | One Square Metre | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling,ramming , watering including shoring and strutting etc. complete. Including all leads and lifts. By Mechanical Means | 9,526.38 | One Cubic Metre | - | - |
| 3 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling,ramming , watering including shoring and strutting etc. complete. Including all leads and lifts By Mechanical Means | 607.73 | One Cubic Metre | - | - |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming , watering including shoring and strutting etc. complete. Including all leads and lifts By Mechanical Means | 78 | One Cubic Metre | - | - |
| 5 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming , watering including shoring and strutting etc. complete. Including all leads and lifts By Mechanical Means | 1,849.17 | One Cubic Metre | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum,ramming ,watering including shoring and strutting etc. complete.Including all leads and lifts By Mechanical Means | 633.73 | One Cubic Metre | - | - |
| 7 | Excavation for foundation in Hard rock bychiselling,wedging,line drilling,etc.including tri millimetre ing and levelling the bed,removing the excavated material upto a distance of 50 metres beyond the building area stackingas directed,dewatering and backfilling with available earth/murum watering,ra millimetre ing etc.complete.Including all leads and lifts.By Mechanical Means | 10.4 | One Cubic Metre | - | - |
| 8 | Filling in plinth and floors with approved excavated material in 15 centimetre . to 20 centimetre . Layers including watering and compacting etc. complete. | 2,438.4 | One Cubic centimetre | - | - |
| 9 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 centimetre to 20 centimetre including watering and compaction etc. complete. | 10,107.06 | One Cubic Metre | - | - |
| 10 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20 centimetre . to 30 centimetre . thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | 640.5 | One Cubic Metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
34_1.pdf
Tender Documents • 5.13 MB
Drawings.pdf
Other Document • 24.45 MB
BOQ_2290831.xls
BOQ • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .