Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L Quoted ₹29.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.0 LRejected-Finance | ₹30.0 L | L2 | Rejected-Finance not qualified |
Tender Value
₹30.0 L
EMD Value
₹3.0 L
Closing Date
6 Feb 2026, 3:00 pmClosed
c.e office
c. e office kanpur nagarnigam
Improvement of street and drain h.n 105/55/17 to 105/55/31 and 105/55/70 jhanda chauraha anf kerb stone and 105/312 and nafisa baji to musaffar bhai and ward-71 zone-01
2026_NNKAN_1103741_2
509/AA-1/2025-26
Open Tender
Civil Works
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹3.0 L
Yes
3 Jul 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismentling of damages cc including stacking dismental materail with in 60m distence etc all complete | 1,488.4 | sqm | 67 | ₹99,722.8 |
| 1.02 | Dismentling of damages cc including stacking dismental materail with in 60m distence etc all complete | 26.65 | sqm | 11 | ₹293.15 |
| 1.03 | Earth work in excavation means (hydraulic excavator/manual means in foundation trenches are drains (not exceeding 1.5 mtr in width or 10swm on plan ), excavation soil and disposal off sarface exavated soil as directed, within lead of 50 m. including dressing of side and ramming of bottoms, lift up to 1.5 m, including getting out the all kinds of soil | 4.73 | cum | 215 | ₹1,016.95 |
| 1.04 | E/W in Surface Excavation no exceeding 30 cm in depth but ecceeding 1.5 m width as well as 10 sqm on plan including getting out and disposal of excavated carth up to 50m and lift up to 1.5 m as directed by the engineer in charge, etc all comp. | 74.42 | cum | 170 | ₹12,651.4 |
| 1.05 | providing and laying in cement cone Concrete 1:4.8(1 Cement4 fine sand and 8cm. gauge stone Ballastjand curing comp including cost of form work in foundation. and floors etc all comp. | 2.8 | cum | 5,740 | ₹16,072 |
| 1.06 | Construction of G.S.B Etc all comp. | 111.63 | cum | 3,671 | ₹4,09,793.73 |
| 1.07 | M-150 b/w with 14 cement & C sand mortar etc all comp Super structure | 1.05 | cum | 6,600 | ₹6,930 |
| 1.08 | Cartage of carth and dismental material upto 3.00km including loading unloading etc all comp | 235.26 | nos | 116.96 | ₹27,516.01 |
| 1.09 | construction of a chamber 60x.60x.9 etc all comp. | 1 | nos | 7,464 | ₹7,464 |
| 1.1 | construction of gully pit as per knn design .60x 60x 75 etc all comp. | 5 | nos | 5,180 | ₹25,900 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2052934.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_2052934.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid