| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC | L1 | Accepted-AOC THE LOWEST BIDDER | |
| 2 | L2₹30.2 L+₹27,672 (0.93%)Rejected-Finance | L2 | Rejected-Finance NOT THE LOWEST TENDERER | |
| 3 | L3₹38.2 L+₹8.3 L (27.8%)Rejected-Finance 35 60 2A LASKARPUR MUGHAL ROAD KAMLA NAGAR AGRA 282005 | AGRA | AGRA | UTTAR PRADESH | 282005 | L3 | Rejected-Finance NOT THE LOWEST TENDERER | |
| 4 | L4₹41.3 L+₹11.5 L (38.3%)Rejected-Finance B 68 MOTIKUNJ MATHURA 281001 UP | MATHURA | UTTAR PRADESH | 281001 | L4 | Rejected-Finance NOT THE LOWEST TENDERER | |
| 5 | L5₹41.7 L+₹11.8 L (39.6%)Rejected-Finance | L5 | Rejected-Finance NOT THE LOWEST TENDERER |
| Sl No | Description | Qty | Unit | JWALA ELECTRIC CONTRACTORS L7 | DHARMENDRA GAUTAM L3 | M/S YATENDRA SINGH L6 | mh enterprises L2 | M/s Hoti Lal Contractor L4 | Karman Infra Projects L5 | M/s M S CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work built in cement mortar including all quoins, asches, pillars etc in any position complete all as specified and as directed. | 286.2 | Cum | 95 ₹27,189 | 200 ₹57,240 | 100 ₹28,620 | 200 ₹57,240 | 190 ₹54,378 | 150 ₹42,930 | 9 ₹2,575.8 Lowest |
| 2.00 | Demolition of cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for bed of drain or coping etc and removing from site out side of Mod land complete all as specified and as directed. | 104 | Cum | 95 ₹9,880 | 80 ₹8,320 Lowest | 230 ₹23,920 | 500 ₹52,000 | 400 ₹41,600 | 350 ₹36,400 | 95 ₹9,880 |
| 3.00 | Excavation over areas, n.exc 1.5m deep and getting out in any type of soil etc complete | 16 | Cum | 95 ₹1,520 | 200 ₹3,200 | 100 ₹1,600 | 50 ₹800 Lowest | 200 ₹3,200 | 150 ₹2,400 | 138 ₹2,208 |
| 4.00 | Excavation over areas, exc 1.5m but n exc 3 mtr deep and getting out in any type of soil etc complete | 16 | Cum | 95 ₹1,520 | 200 ₹3,200 | 100 ₹1,600 | 50 ₹800 Lowest | 300 ₹4,800 | 200 ₹3,200 | 160 ₹2,560 |
| 5.00 | Excavating in trenches for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, drains etc. n exc 1.5 m wide and n exc 1.5 m in depth and getting out in loose/ soft soil complete all as directed. | 610 | Cum | 95 ₹57,950 | 100 ₹61,000 | 150 ₹91,500 | 50 ₹30,500 Lowest | 190 ₹1,15,900 | 180 ₹1,09,800 | 88 ₹53,680 |
| 6.00 | Ditto item no 5 but exc1.50 mtr but n exc 3.0 mtr of depth . | 12 | Cum | 110 ₹1,320 | 120 ₹1,440 | 120 ₹1,440 | 65 ₹780 Lowest | 300 ₹3,600 | 200 ₹2,400 | 95 ₹1,140 |
| 7.00 | M&L for type D2 1:4:8 (using 40mm graded agg) as in lean concrete. | 200 | Cum | 2,000 ₹4,00,000 | 2,000 ₹4,00,000 | 2,800 ₹5,60,000 | 1,500 ₹3,00,000 | 2,000 ₹4,00,000 | 2,800 ₹5,60,000 | 1,495 ₹2,99,000 Lowest |
| 8.00 | Returning, filling in, including spreading , levelling, watering and well ramming in layers n.exc 25 cmthick. Complete in soil all as specified and as directed by Enge-in-Charge. | 290 | Cum | 20 ₹5,800 Lowest | 80 ₹23,200 | 45 ₹13,050 | 40 ₹11,600 | 150 ₹43,500 | 40 ₹11,600 | 20 ₹5,800 Lowest |
| 9.00 | Removal of excavated material (soil) to a distance exc 250m but n.exc 500m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specifeid and directedby the Engr -in -Charge. | 352 | Cum | 20 ₹7,040 Lowest | 180 ₹63,360 | 67 ₹23,584 | 50 ₹17,600 | 180 ₹63,360 | 60 ₹21,120 | 20 ₹7,040 Lowest |
| 10.00 | M&L for RCC M-25 as in roof slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified. | 4 | Cum | 5,000 ₹20,000 | 6,600 ₹26,400 | 8,000 ₹32,000 | 4,500 ₹18,000 | 600 ₹2,400 Lowest | 6,000 ₹24,000 | 4,000 ₹16,000 |
Tender Value
₹43.8 L
EMD Value
₹87,600
Closing Date
15 Jun 2026, 6:00 pmClosed
Garrison Engineer (East) Mathura
Garrison Engineer (East) Mathura
ENHANCEMENT OF RAIN WATER HARVESTING BY IMPROVING SERVICEABILITY OF EXISTING DRAINAGE SYSTEM UNDER GE (EAST) MATHURA
2026_MES_768094_1
1607/E8
Open Tender
Civil Works
Item Rate
180 days
GE (E) Mathura
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (E) Mathura
₹87,600
Yes
31 Jul 2026
27 May 2026
17 Jun 2026
27 May 2026
15 Jun 2026
9 Jun 2026
27 May 2026 - 9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work built in cement mortar including all quoins, asches, pillars etc in any position complete all as specified and as directed. | - | Cum | - | - |
| 2 | Demolition of cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for bed of drain or coping etc and removing from site out side of Mod land complete all as specified and as directed. | - | Cum | - | - |
| 3 | Excavation over areas, n.exc 1.5m deep and getting out in any type of soil etc complete | 16 | Cum | - | - |
| 4 | Excavation over areas, exc 1.5m but n exc 3 mtr deep and getting out in any type of soil etc complete | 16 | Cum | - | - |
| 5 | Excavating in trenches for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, drains etc. n exc 1.5 m wide and n exc 1.5 m in depth and getting out in loose/ soft soil complete all as directed. | 610 | Cum | - | - |
| 6 | Ditto item no 5 but exc1.50 mtr but n exc 3.0 mtr of depth . | 12 | Cum | - | - |
| 7 | M&L for type D2 1:4:8 (using 40mm graded agg) as in lean concrete. | 200 | Cum | - | - |
| 8 | Returning, filling in, including spreading , levelling, watering and well ramming in layers n.exc 25 cmthick. Complete in soil all as specified and as directed by Enge-in-Charge. | 290 | Cum | - | - |
| 9 | Removal of excavated material (soil) to a distance exc 250m but n.exc 500m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specifeid and directedby the Engr -in -Charge. | - | Cum | - | - |
| 10 | M&L for RCC M-25 as in roof slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified. | 4 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_860167.xls
BOQ • 0.29 MB
Tender.pdf
Tender Documents • 3.18 MB
Amend.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .