Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹20.8 L+₹1.6 L (8.36%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹19,100
Closing Date
6 Feb 2024, 2:00 pmClosed
SE-ES
SUPERINTENDING ENGINEER/ ELECTRICAL SYSTEM, NCTPS-I, CHENNAI-120
NCTPS I ES Circle EM II Division S Dn III PHL Carrying out Time bound maintenance works of lighting in Power House area comprising of Station Service buildings Cables Gallery TG floor of all the three Units Switchyard and Transformer yard for
2024_EB_412715_1
CE NCTPS I SE ES WC No 74 2023 24
Open Tender
Power/Energy Projects/Products
Works
360 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,100
Yes
8 May 2025
24 Jan 2024
7 Feb 2024
24 Jan 2024
6 Feb 2024
24 Jan 2024
Amount
Cleaning replacement of 40 W Fluorescent to 18 W LED Tube light and 70W SV lamp to 36 W LED well glass lamp fittings including transport of materials.
Replacement of burnt / failed MCBs in LP boxes at various places of Power house area lighting (Service building, Station building, TG floor of all the three Units and Switch yard etc.,)
Rewiring of LP including dismantling at various places of Power house area lighting etc.,
Cleaning and tightness checking of LDB
Replacement roof extraction fan provided at TG floor of all the three units
Circuit fault rectification of roof extraction fan motors at TG floor
Cleaning, Lubricating, tightness of bolt & Nut of roof extraction fan motor at TG floor of all the three units.
Circuit fault rectification of exhaust fan at cable gallery at ‘O’ mtr and 10.5 mtr for all the three units.
Cleaning, lubricating, tightness checking of exhaust fan at cable Gallery at ‘O’ mtr and 10.5 mtr for all the three units.
Maintenance, Tightness checking and cleaning of LP
Replacement of failed ceiling fan at various places.
Replacement of failed 5A switch, socket and ceiling fan capacitor at various places.
Replacement of damaged Fittings of SV/MV 150W/250W street light to 190 W LED Hi bay light and 72W LED street lights.
Attending circuit fault on testing of light fitting
Cleaning the LED tubelight fitting, shades and other lighting accessories in UCB I, II & III are in service below 6 mtr height (840 lights x 6 times).
E GNANAMANI
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .