| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹20.9 LSame as L1Rejected-AOC | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹26.3 L+₹5.4 L (25.8%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Documents not as per PQC |
Tender Value
₹24.8 L
EMD Value
₹50,000
Closing Date
25 Apr 2022, 4:00 pmClosed
SE OMC I DTPS
SE OMC I DTPS ANPARA SONEBHADRA
Complete Operation, Maintenance and upkeep of Hydrogen Generation Plant and its accessories. Routine and Breakdown maintenance of compressors and its accessories breakdown maintenance of AC. system in BOP area of 2X500 MW, DTPS Anpara Sonebhadra
2022_RVUNL_683415_1
05/DTPS /OMC-I/CAD / 2022-23.
Open Tender
Air Compressor
Item Rate
365 days
SE OMC I DTPS ANPARA SONEBHADRA
As per PQC
3 documents required · 3 mandatory
₹1,180
Dy. GM (F), Construction Unit, C.F.A B.O, DTPS
₹50,000
14 Jun 2022
31 Mar 2022
26 Apr 2022
31 Mar 2022
25 Apr 2022
31 Mar 2022
Amount
Routine maintenance(A)
Complete Operation, Maintenance and upkeep of Hydrogen Generation Plant installed at 2X500 MW, DTPS, Anpara, Sonebhadra.
Routine maintenance of 05 No’s Air compressors, and associated auxiliaries installed in compressor House (As per scope of work job no.1.)
Manpower Support For Annual maintenance contract of Atlas Copco make Air Compressor With T&P and consumables. (03 Unskilled Man power per day)
Routine maintenance of Ingersoll Rand make Mill Reject System Compressor and its accessories
Breakdown Maintenance of MRS Compressor (B)
Replacement /Repair of piston rod or blocking nut of HP/LP cylinder, dismantling, setting right and re assemble
Checking and attending the intercooler/ after cooler thorough cleaning , remounting and replacement of part etc.
Gudgeon pin and small end bush assembly. Opining for checking , rectification and replacement if required
Changing of seal ring / piston ring of HP/LP cylinder
Changing of bearing ring of HP/LP cylinder or Changing of piston half/complete piston of HP/LP cylinder
Replacement of distance pieces / cross head/cross head guide
Opining, cleaning ,repair/replacement of parts of suction / delivery valves of HP/LP cylinder
Attending and checking of oil cooler including replacement of damaged / worn out parts if required.
Oil filter cleaning and attending of primary /secondary lub oil filter
Checking , attending and cleaning with non corrosive scale remover of water jacket of HP/LP cylinder
Attending and resetting of main bearing including repair /replacement of parts, bearing etc. Also attending blockage in lub oil pump.
Opening, attending defect in plumber block, greasing etc
Complete Overhauling and trial run of compressor as per scope of work
Breakdown Maintenance of AC
Cleaning of filter of split AC and cassette AC
Cleaning of filter AHU in PT Plant One AHU filter cleaning is one Job
Replacement of 5.0/4.0 Ton burnt compressor with new one, new compressor provided by department and old compressor is the property of department.
Replacement of 2.0/1.5 Ton burnt compressor with new one, new compressor provided by department and old compressor is the property of department.
Replacement of 2.0 Ton burnt compressor with gas charging (New compressor will be provided by contractor.)
Replacement of 1.5 Ton burnt compressor with gas charging (New compressor will be provided by contractor.)
Gas Charging ( As per requirement) in 5.0 Ton Compressor
Gas Charging ( As per requirement) in 4.0 Ton Compressor
Gas Charging ( As per requirement) in 2.0 Ton Compressor
Gas Charging ( As per requirement) in 1.5 Ton Compressor
Cleaning of Strainer filter of 5.0 Ton Cassette type air conditioner
Cleaning of Strainer filter of 4.0 Ton Tower AC
Repairing/Cleaning of Strainer filter of 2.0 Ton Split type air conditioner.
Cleaning of Strainer filter of 1.5 Ton Split type air conditioner
Replacement of Starting capacitor/ running capacitor of 5.0 Ton Cassette type air conditioner
Replacement of Starting capacitor/ running capacitor of 2.0 Ton split type air conditioner
Replacement of Starting capacitor/ running capacitor of 2.0 Ton window type air conditioner
Replacement of Starting capacitor/ running capacitor of 1.5 Ton split type air conditioner
Replacement of Thermostat of 5.0 Ton Cassette type air conditioners
Replacement of Thermostat of 2.0 Ton split type air conditioners
Replacement of Thermostat of 1.5Ton split type air conditioners
Replacement of Blade of fan blower of 5.0 Ton Cassette air conditioner
Replacement of Blade of fan blower of 4.0 Tower air conditioner
Replacement of Blade of fan blower of 2.0 Ton spilt air conditioner
Replacement of Blade of fan blower of 1.5 Ton spilt air conditioner
Replacement of Fan Motor capacitor of 5.0 Ton Cassette air conditioner
Replacement of Fan Motor capacitor of 4.0 Ton Tower air conditioner
Replacement of Fan Motor capacitor of 2.0 Ton spilt air conditioner
Replacement of Fan Motor capacitor of 1.5 Ton spilt air conditioner
Rewinding of blower of AHU motor
Rewinding of fan motor of 5.0 Ton Cassette air conditioner
Rewinding of fan motor of 4.0 Ton Tower air conditioner
Rewinding of fan motor of 2.0 Ton spilt air conditioner
Rewinding of fan motor of 2.0 Ton window air conditioner
Rewinding of fan motor of 1.5 Ton window air conditioner
Rewinding of fan motor of 1.5 Ton spilt air conditioner
Replacement of indoor assembly PCB card of 1.5/2.0 ton A.C.
Repairing Of condenser coil of 1.5/ 2.0 ton A.C.
Replacement of condenser coil of 1.5 ton A.C.
Replacement Of condenser coil of 2.0 ton A.C.
Replacement Of Starting relay of 1.5/ 2.0 ton A.C.
Top up of Refrigerant of unit as per Requirement
Repair of air blowers of air handling units. The work includes dynamics balancing of blower fan, replacement of bearing repair of shaft and other associated work.
Complete overhauling work of 5.0 Ton cassette air conditioner
Complete overhauling of 2.0 Ton spilt air conditioner
Complete overhauling of 2.0 Ton window air conditioner
Complete overhauling of 1.5 Ton spilt air conditioner
Complete overhauling of 30 .0 Ton Chiller Unit
Complete overhauling of 5 .0 Ton Chiller Unit
Complete overhauling of AHUs
Complete overhauling of 4.0 Ton Tower AC
RAJDHANI ENGINEERING
THE UNIVERSAL CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .