Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹10.4 L (6.71%)Rejected-AOC | ₹1.7 Cr+₹10.4 L (6.71%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.8 Cr+₹24.4 L (15.7%)Rejected-AOC | ₹1.8 Cr+₹24.4 L (15.7%) | L3 | Rejected-AOC L3 |
| 4 | L4₹6.0 Cr+₹4.4 Cr (284.4%)Rejected-AOC | ₹6.0 Cr+₹4.4 Cr (284.4%) | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.1 Cr
EMD Value
₹2.5 L
Closing Date
14 Jun 2024, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Thanakalan
Construction of Rain Water Harvesting Structure (RWHS- 2) on Bangana Khad Construction of Rain Water Harvesting Structure (RWHS-3) on Thanakalan Khad near village Thanakalan, Construction of Rain water harvesting Structure (RWHS-4) on Chaproh Khad)
2024_HPIPH_88769_1
UNA-UNA03-733
Open Tender
Civil Works
Lump-sum
548 days
Thanakalan
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,500
Yes
Executive Engineer Jal Shakti Division Thanakalan
₹2.5 L
Yes
Jal Shakti Circle Una
12 Aug 2024
7 Jun 2024
15 Jun 2024
7 Jun 2024
14 Jun 2024
7 Jun 2024
7 Jun 2024 - 14 Jun 2024
13 Jun 2024
Amount
Planning, investigation, evolution of Hydraulic & Structural Designs and Drawings (including Geotechnical Investigation Report) and construction of Rain Water Harvesting Structure (RWHS- 2)on Bangana Khad: Height = 7.50 M, Length = 18.00 M, Average depth of Foundation below N.S.L = 2.40 M), Construction of Rain Water Harvesting Structure(RWHS-3) on Thanakalan Khad near village Thanakalan: Height= 6.50 M. Length = 18.00 M. Average depth of Foundation Below N.S.L = 2.10 M), Construction of Rain Water Harvesting Structure(RWHS-4) on Chaproh Khad: Height= 6.50 M. ,Length= 21.00 M. Average depth of Foundation Below N.S.L = 2.10 M) with Sluice Gates and any other allied works contingent thereto, complete in all respects including testing and commissioning as per directions and satisfaction of the Engineer-in-Charge.
gagan ohri
abhishek dhiman
SS RANA CONSTRUCTION PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .