Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAccepted-AOC | ₹6.2 Cr Quoted ₹6.4 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹6.5 Cr+₹18.7 L (2.94%)Rejected-AOC | ₹6.5 Cr+₹18.7 L (2.94%) | L2 | Rejected-AOC Rejected |
Tender Value
₹6.4 Cr
EMD Value
₹6.4 L
Closing Date
31 May 2023, 3:00 pmClosed
Addl. Collector (Dev.)/ PD DRDA KRISHNAGIRI
DRDA KRISHNAGIRI
Construction of Bridge across Thenpennai River at Vatttakollai Connecting Vatttakollai and Bodrapalli at Goolium in Krishnagiri Block of Krishnagiri District under NABARD RIDF XXVIII(2022-23) Package No TN 04 KRI 102
2023_RDTN_311487_1
RefNo_2490_2023_R3_22_04_2023
Open Tender
Civil Works - Bridges
Item Rate
540 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6.4 L
DRDA KRISHNAGIRI
13 Jul 2023
6 May 2023
31 May 2023
6 May 2023
31 May 2023
6 May 2023
15 May 2023
Amount
Constrction of bridge across Thenpennai River at Vattakollai Connecting Vattakollai And Bodarapalli H/o.Goolium
Earth work excavation in all classes of soil except Kankar equiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. UNDER ABUTMENTS AND PIPERS LOCATION.
Earth work excavation in all classes of soil except Kankar and Soft Rock requiring blasting except requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS.
Earth work excavation in soft Dissintegrated rock not requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS.
Vibrated Cement Concrete of grade M-15, Nominal Mix, 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS OF ABUTMENTS, WINGS AND PIERS.
Vibrated reinforced cement concrete M30 grade Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTINGS UNDER ABUTMENTS, RETURN WALLS AND PIERS.
Vibrated reinforced cement concrete M30 grade Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS, RETURN WALL STEM BELOW SILL
Vibrated reinforced cement concrete M30 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS BELOW SILL.
Vibrated reinforced cement concrete M30 grade Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS, RETURN WALL ABOVE SILL LEVEL
Vibrated reinforced cement concrete M35 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS ABOVE SILL.
Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.
Vibrated reinforced cement concrete M30 (Design mix) using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for CAPPING BEAM OVER PIER COLUMNS.
Vibrated reinforced Cement Concrete of grade M 30 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site, but Excluding cost and Fabrication of Steel but including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at Heights, Soft Water, hire charges for tools and plants, including all other incidental charges etc., complete as per relevant standard specifications for RCC Pedestal over capping beam and Bed Blocks
Supplying and fixing of Elastometric bearing of required size 320X400X64mm including coast and conveyance to work site, labour for fixing the Correct in position and all other incidental charges., complete as per Specifications
Vibrated reinforced Concrete M-40, Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for T- BEAM MAIN GRIDERS AND CROSS GRIDERS.
Vibrated reinforced Concrete M-30, Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for DECK SLAB AS PER MOST DRG NO .SD/241 & SD / 205
Vibrated reinforced Concrete M-30, Grade, Design Mix, graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS AND POST OVER DECK SLAB
Vibrated reinforced Concrete M-40, Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC Crash Barrier
Providing and fixing of Galvinised Iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Vibrated Cement Concrete M15, Grade, Nominal Mix, 1:2:4 using 20mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB
Vibrated reinforced Concrete M-30, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for APPROACH SLABS
Vibrated Cement Concrete M-20, Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for PCC Parapet Wall Over APPROACHES
Vibrated Cement Concrete M-30, Grade, Design Mix, using 65 % of 25mm, 25% of 12mm & 10% of 6mm IRC size graded metal including cost and conveyance of all materials to site including cement at site including labour charges for toolsand Plants , Complacting, Curing with all leads for Soft water , including all other incidental charges , formwork, cost of premoulded expension joints and fixing the same in position etc., complete for wearing cost of 75 mm uniform thickness over deck slab and aproach slab
Supplying and installation of Strip Seal EXPANSION joint system conforming to specifications for Road and Bridge Works-IV Revision; 2001 Published by Ministry of Surface Transport (Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MOST specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications.
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labor for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labor charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS.
Providing Filter Media Behind the abutments and wings with clean III Grand Material 53 mm to .6 mm to 600 mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the well including cost and conveyance to work site including all labour and other incidental charges for tools and plants employed etc., for filter media as per MOST's (Road wing) Specifications for Roads and Bridges fourth Revision CI 309-3-2-13 and 305-4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for Water and all other Incidental charges etc, complete.
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Upto 16mm Dia
Above 16mm Dia
Supply and Fabrication of Fe 500 Steel Required for all RCC items of works involed in the schedule cost of steel at site fabrication, labour charges nfor cleaning the rods straightening , cutting, bending, tying grills, including Overlappingto the required length whenever necessary and placing the reinforcement in position as specified in the drwawing including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc., complete, S-240 Grade.
Supply and fixing of High Quality of PVC Pipes of 150mm dia Including cost and conveyance of pipe to the site and fixing in position to proper grade and level including charges for fixing and including all other incidental charges etc., complete., for proving utility services in footpaths. 4kg for cm2
Provision for P.C.C Retaining wall
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labor, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS
Vibrated Cement Concrete of grade M20 using 20mm & 12mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specifications, for FOOTINGS OF RETAINING WALLS. (below sill)
Vibrated Cement Concrete of grade M20 using 20mm & 12mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS- (Above sill)
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labor for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labor charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS.
Provision for R.C.C Retaining wall (6.5m Height)
Earth work excavation in al classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS208, including cost of all labour, equipments and all other incidental charges such as bailing out water providing and maintaining necessary cofferdams, sheeting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and constructions, trimming bottom of excavation backfilling, and clearing the sits and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS.
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4, using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW THE FOOTINGS OF RCC RETAINING WALLS.
Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for FOOTINGS OF RCC RETAINING WALLS.
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN BETWEEN THE RETAINING WALLS.
Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
Provision for Approach Road
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 2km for formation of Approach Road.
98% COMPACTION
100% COMPACTION
Providing and Laying Granular Sub base as per table No 400-1/400-2 and Grading III of MORTH Revision IV with and any other Granular material or a combination those of for 150 mm thick to give a CBR of 20 on prepared sub grade in accordance with the requirements of the specifications For Sand, Gravel & 6 mm Aggregate Mix
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Provied and laying of Prime coat using Emulsion Bitumen (SS-1) at the rate of 7Kg/Sqm over the WMM Surface Preparatory to another Construction over it
Providing and laying of Tack coat using Emulsion Bitumen (RS-1) at the rate of 2.5 kg/sq.m over the promer treated WMM surface preparatory to another construction over it.
Providing and Laying of Premix Carpet with seal coat over the Treated WMM surface Preparatrory to another construction Over it.
Provison for Safe Load Test
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
CDR AND CO CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .