Tender Value
₹71.2 L
EMD Value
₹1.4 L
Closing Date
2 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
AGM CE
FCI ZQCL Building Newtown Kolkata
Repair and Renovation work for FCI Zonal Office Kolkata
2026_FCI_929888_1
CE/ZO(E)/02/2026
Open Tender
Civil Works
Works
Kolkata
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.4 L
12 Oct 2026
12 Oct 2026
3 Nov 2026
12 Oct 2026
2 Nov 2026
12 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 5 | cum | 3,455.37 | ₹17,276.85 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 122 | each | 357.29 | ₹43,589.38 |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 340 | Sqm | 71.42 | ₹24,282.8 |
| 4 | Dismantling of toilet fittings & fixtures of all types (C.I./PVC/Vitrious China/ceramic fixtures) including stacking of useful materials near the site and disposal of unserviceable materials. Rate shall be quoted for Each Toilet . | 24 | Each | 1,377.77 | ₹33,066.48 |
| 5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 160 | Cum | 256.82 | ₹41,091.2 |
| 6 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead : Thickness above 10 mm up to 25 mm | 449.35 | Sqm | 75.65 | ₹33,993.33 |
| 7 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 233 | Sqm | 53.17 | ₹12,388.61 |
| 8 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 4,190 | Sqm | 24.47 | ₹1,02,529.3 |
| 9 | Providing and laying water proofing treatment on roofs of slabs by applying
cement slurry mixed with water proofing cement compound consisting of
applying:
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm.
(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all
around.
(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured. | 136.17 | Sqm | 670.3 | ₹91,274.75 |
| 10 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: A layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. | 28.8 | Sqm | 541.96 | ₹15,608.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
MTF.pdf
Tender Documents • 1.83 MB
BOQ_977177.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .