| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance AT CHUAKANI PO CHHUALIBERNA DIST JHARSUGUDA PIN 768216 | JHARSUGUDA | JHARSUGUDA | ODISHA | 768216 | -45.85% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹3.6 L (2.09%)Admitted-Finance | -44.72% | ₹1.8 Cr+₹3.6 L (2.09%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹35.4 L (20.6%)Admitted-Finance AT PO LAMTIBAHAL BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768216 | JHARSUGUDA | ODISHA | 768216 | -34.71% | ₹2.1 Cr+₹35.4 L (20.6%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 Cr+₹72.0 L (41.9%)Admitted-Finance OPPOSITE KEWDA BADI BUS STAND RAIGARH CHATTISGARH 496001 | RAIGARH | RAIGARH | CHHATTISGARH | 496001 | -23.18% | ₹2.4 Cr+₹72.0 L (41.9%) | L4 | Admitted-Finance |
Tender Value
₹3.7 Cr
EMD Value
₹4.7 L
Closing Date
1 Jun 2026, 5:00 pmClosed
STAFF OFFICER(C),IB VALLEY AREA
SO(C), IB VALLEY AREA, MCL AT PO BRAJRAJNAGAR DIST JHARSUGUDA ODISHA. MOB NO 8018253929
Construction of RCC Retaining wall to provide stability and check soil erosion of embankment along the railway track of RLS of SOCP under IB Valley Area
2026_MCL_359667_1
MCL/GM/IBV/SOC/2026-27/13 dt. 15.05.2026
Open Tender
Civil Works - Others
Percentage
150 days
SOCP, IBVA, MCL, Brajrajnagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹4.7 L
18 Sept 2026
15 May 2026
2 Jun 2026
16 May 2026
1 Jun 2026
16 May 2026
16 May 2026 - 25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 ) Oridinary soil Manual Means upto 3 m depth | 2,338.12 | CUM | 233 | ₹5,44,781.96 |
| 2 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 303.57 | CUM | 1,205 | ₹3,65,801.85 |
| 3 | Plain/Reinforced cement concrete in sub-structure including formwork, shuttering etc. complete as per drawing and technical specifications. PCC Grade M15.Height upto 5m | 231.53 | CUM | 6,137 | ₹14,20,868.93 |
| 4 | Plain/Reinforced cement concrete in sub-structure including formwork, shuttering etc.complete as per drawing and technical specifications. RCC Grade M20. Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump | 144 | CUM | 6,485 | ₹9,33,840 |
| 5 | Plain/Reinforced cement concrete in sub-structure including formwork, shuttering etc.complete as per drawing and technical specifications.RCC Grade M25.Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump | 1,271.07 | CUM | 6,978 | ₹88,69,543.9 |
| 6 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600 | 162.61 | TONNE | 85,922 | ₹1,39,71,664.72 |
| 7 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specifications. | 2,400 | each | 227 | ₹5,44,800 |
| 8 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. | 3,121.85 | CUM | 1,533 | ₹47,85,796.05 |
| - | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.49 MB
Tendernotice_2.pdf
PDF • 1.45 MB
BOQ_372529.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .