Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | ₹7.6 L | L1 | Accepted-AOC BELOW |
| 2 | L2₹7.6 LRejected-Finance | ₹7.6 L | L2 | Rejected-Finance Reject |
Tender Value
₹7.6 L
EMD Value
₹38,000
Closing Date
6 Apr 2026, 12:00 pmClosed
EE RED SANTKABIR NAGAR
O/O EE RED SANTKABIR NAGAR
Gram Gauraya Urf Gausesinghpur mein Chath Ghat ke Nirman karya
2026_REDUP_1132164_3
1224/RED/Nivida/2024-25 Dt. 24.02.26
Open Tender
Civil Works
90 days
works
as per sbd
2 documents required · 2 mandatory
₹944
₹38,000
Yes
7 May 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
6 Apr 2026
1 Apr 2026
1 Apr 2026 - 6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earth Work in cutting and embankement in o soil 253 | - | Cum | - | - | |
Excavation in Foundation in odinary soil including lift 1.5 cm lead 3 cm removal and disposal of surphid earth as directed by E/L As per SI No. 251 | - | Cum | - | - | |
Concrete with 40 mm Gauge brick Ballat fine sand and cement in proportion 8:4:1 in foundation and under floor Etc. As per SI NO. 275 | - | Cum | - | - | |
Class M 150 sub class ''A'' Brick in 1:4 with cement and fine sand in foundation upto bed level required for proper completion of work. As per SI. NO. 305 | - | Cum | - | - | |
Class M 150 sub class ''A'' Brick in 1:3 with cement and c sand in super structure with required cutting mulding and scaffolding etc complete As per SI No. 307,309 | - | Cum | - | - | |
R.C.C. Work in 1:1.5:3 with cement,coarse sand and 20 mm stone grit/c provided and fixing necessary centring and shutting and its removal but excuding cost steal and its cutting and binding Etc. Complete in Slab As pe Si. No 284(A) | - | Cum | - | - | |
M.S. Iron Work as reinforcement in RCC Work including cutting bending Wrought to required shape as necessary including binding for proper completion of the work As Per SI.No. 504 | - | Qtl | - | - | |
Struck Pointing With Cement and fine sand mortar consisting one part of cement and two part of Fine Sand including supply of all materials labour T&P required for proper completion of the work As Per SI No. 574 | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2112945.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid