| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAdmitted-Finance | ₹11.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected, Requisite documents not submitted |
| Sl No | Description | Qty | Unit | M/S QADRI ELECTRICALS L1 |
|---|---|---|---|---|
| 1.00Creation of dedicated 200 kVA Substation for Providing of Power Connection for Residential Quarters and Relocation of 250 kVA Substation from Main Gate of Residential Quarters at PDD Complex Bemina falling under the jurisdiction of ESD Watalkadal, ED-3rd Srinagar (Turnkey Basis). | ||||
| 1.01 | Supply, Installation, Testing and commissiong of 200 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Al wound, and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. ( X-mer without OCTC (Off Ckt Tap Changer). The job including integration with system by way of providing Clamps/Jumpers/necessary items required for commissioning.
(Transformer to be provided as per specification & GTP to be approved prior to supply)
1. Creation of dedicated 200 kVA Substation -01 no. | 1 | No. | 3,50,000 ₹3.5 L |
| 1.02 | Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9 kV, 10 kA, Lighting Arrestor Set Heavy duty with Plymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V)
1. Creation of dedicated 200 kVA Substation -01 set
2. Shifting of 250 kVA Substation from Main Gate - 01 Set | 2 | Set | 5,000 ₹10,000 |
| 1.03 | Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V)
1. Creation of dedicated 200 kVA Substation -01 set
2. Shifting of 250 kVA Substation from Main Gate - 01 Set | 2 | Set | 13,000 ₹26,000 |
| 1.04 | Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS.
1. Creation of dedicated 200 kVA Substation -01 set
2. Shifting of 250 kVA Substation from Main Gate - 01 Set | 2 | Set | 4,000 ₹8,000 |
| 1.05 | Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
1. Creation of dedicated 200 kVA Substation -06 No.
2. Shifting of 250 kVA Substation from Main Gate - 02 No. | 8 | No. | 17,000 ₹1.4 L |
| 1.06 | Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm with F-Top
1. Creation of dedicated 200 kVA Substation -450 kg
2. Shifting of 250 kVA Substation from Main Gate - 300 kg | 750 | kg | 140 ₹1.1 L |
| 1.07 | Supply, Laying, stringing, testing and commissioning of 50 mm² ACSR Conductor
1. Creation of dedicated 200 kVA Substation -30 Mtr
2. Shifting of 250 kVA Substation from Main Gate - 30 Mtr | 60 | Mtr | 80 ₹4,800 |
| 1.08 | Supply, Laying, stringing, testing and commissioning of 30 mm² ACSR Conductor
1. Creation of dedicated 200 kVA Substation -360 Mtr | 360 | Mtr | 40 ₹14,400 |
| 1.09 | Supply, installation, testing and commissioning of 300 mm² Cable, 1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type including lugs/clamps/thimbles.
1. Creation of dedicated 200 kVA Substation -44 Mtr
2. Shifting of 250 kVA Substation from Main Gate - 44 Mtr | 88 | Mtrs | 550 ₹48,400 |
Updated dates
Tender Value
₹13.4 L
EMD Value
₹26,800
Closing Date
5 Dec 2025, 4:00 pmClosed
Executive Engineer, ED-3rd Srinagar
Office of Executive Engineer, ED-3rd Srinagar
Creation of dedicated 200 kVA SS for providing of Power Connection for Residential Qtrs and Relocation of 250 kVA SS from Main Gate of Residential Qtrs at PDD Complex Bemina falling under the jurisdiction of ESD Watalkadal, ED-3rd Sgr (Turnkey Basis)
2025_PDD_293203_1
ED-III /27 of 2025-26, Dated - 25/10/2025
Open Tender
Electrical Works
20 days
Office of Executive Engineer, ED-3rd Srinagar
Refer SBD, Technical Specification, Drawings
7 documents required · 7 mandatory
₹1,000
Executive Engineer, ED-3rd Srinagar
₹26,800
30 Dec 2025
25 Oct 2025
6 Dec 2025
25 Oct 2025
5 Dec 2025
29 Oct 2025
29 Oct 2025 - 5 Dec 2025
Amount
Creation of dedicated 200 kVA Substation for Providing of Power Connection for Residential Quarters and Relocation of 250 kVA Substation from Main Gate of Residential Quarters at PDD Complex Bemina falling under the jurisdiction of ESD Watalkadal, ED-3rd Srinagar (Turnkey Basis).
Supply, Installation, Testing and commissiong of 200 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Al wound, and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. ( X-mer without OCTC (Off Ckt Tap Changer). The job including integration with system by way of providing Clamps/Jumpers/necessary items required for commissioning. (Transformer to be provided as per specification & GTP to be approved prior to supply) 1. Creation of dedicated 200 kVA Substation -01 no.
Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9 kV, 10 kA, Lighting Arrestor Set Heavy duty with Plymer Housing, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) 1. Creation of dedicated 200 kVA Substation -01 set 2. Shifting of 250 kVA Substation from Main Gate - 01 Set
Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) 1. Creation of dedicated 200 kVA Substation -01 set 2. Shifting of 250 kVA Substation from Main Gate - 01 Set
Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS. 1. Creation of dedicated 200 kVA Substation -01 set 2. Shifting of 250 kVA Substation from Main Gate - 01 Set
Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. 1. Creation of dedicated 200 kVA Substation -06 No. 2. Shifting of 250 kVA Substation from Main Gate - 02 No.
Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm with F-Top 1. Creation of dedicated 200 kVA Substation -450 kg 2. Shifting of 250 kVA Substation from Main Gate - 300 kg
Supply, Laying, stringing, testing and commissioning of 50 mm² ACSR Conductor 1. Creation of dedicated 200 kVA Substation -30 Mtr 2. Shifting of 250 kVA Substation from Main Gate - 30 Mtr
Supply, Laying, stringing, testing and commissioning of 30 mm² ACSR Conductor 1. Creation of dedicated 200 kVA Substation -360 Mtr
Supply, installation, testing and commissioning of 300 mm² Cable, 1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type including lugs/clamps/thimbles. 1. Creation of dedicated 200 kVA Substation -44 Mtr 2. Shifting of 250 kVA Substation from Main Gate - 44 Mtr
Supply, Installation, Testing and commissiong of 11kV Polymeric composite Pin Insulator with pins 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm 1. Creation of dedicated 200 kVA Substation -24 No. 2. Shifting of 250 kVA Substation from Main Gate - 09 No.
Supply, Installation, Testing and commissiong of 11KV Disc Insulators (Polymer Type) 12 KV, 45KN Complete with fittings (Lighting Impulse 75 KV positive and 80 KV negative , creepage distance 320 mm) 1. Creation of dedicated 200 kVA Substation -03 No. 2. Shifting of 250 kVA Substation from Main Gate - 03 No.
Supply and Fixing of Galvanized Nuts and Bolts of sizes 1. Creation of dedicated 200 kVA Substation -15 kg 2. Shifting of 250 kVA Substation from Main Gate - 8 kg
Design, Fabrication, Supply, installation, testing and commissioning of LT Distribution Box for 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuits. 1. Creation of dedicated 200 kVA Substation -01 No. 2. Shifting of 250 kVA Substation from Main Gate - 00 No.
Design, Fabrication, Supply, installation, testing and commissioning of LT Distribution Box for 250 kVA DTR with 400 Amp MCCB 3P 36 kA for incomer & 200 Amp MCCB 3P 16 kA 1 No. and 160 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits. 1. Creation of dedicated 200 kVA Substation -00 No. 2. Shifting of 250 kVA Substation from Main Gate - 01 No.
Providing of material and laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set, along with baby insulators & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. 1. Creation of dedicated 200 kVA Substation -03 No. 2. Shifting of 250 kVA Substation from Main Gate - 03 No.
Supply and Fixing of Danger Plates with Clamps 1. Creation of dedicated 200 kVA Substation -05 No. 2. Shifting of 250 kVA Substation from Main Gate - 01 No.
Supply and Fixing of Anti-Climbing Device with Clamps 1. Creation of dedicated 200 kVA Substation -06 No. 2. Shifting of 250 kVA Substation from Main Gate - 02 No.
Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm 1. Creation of dedicated 200 kVA Substation -06 No. 2. Shifting of 250 kVA Substation from Main Gate - 02 No.
Supply & fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6) mm, nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete 1. Creation of dedicated 200 kVA Substation -02 Set 2. Shifting of 250 kVA Substation from Main Gate - 02 Set
Supply & Fixing of GI Wire 6 SWG & 8 SWG 1. Creation of dedicated 200 kVA Substation -08 kg
Supply and Painting of poles with red Oxide 1. Creation of dedicated 200 kVA Substation -06 Ltr 2. Shifting of 250 kVA Substation from Main Gate - 02 Ltr
Supply and Painting of poles with Aluminium Paint 1. Creation of dedicated 200 kVA Substation -06 Ltr 2. Shifting of 250 kVA Substation from Main Gate - 02 Ltr
Supply & fixing of PG Clamps/ Wedge connectors 1. Creation of dedicated 200 kVA Substation -06 No. 2. Shifting of 250 kVA Substation from Main Gate - 06 No.
Shifting (Dismantling & re-erection, Testing and Commissioning-Integration with system) of 250 KVA Distribution Transformer from current site to Proposed Site including carriage, transportation, loading, unloading.
Dismantling of old substation alongwith allied material and shifting of same to divisional store including transportation, carriage, loading/unloading from site to divisional store. details: 1. Old Substation Poles with allied Material 2. Old Cable
Providing of material and laying of Cement bottoming 1:2:4 mix as per Standards 0.48 cum /pole 1. Creation of dedicated 200 kVA Substation -06 No. 2. Shifting of 250 kVA Substation from Main Gate - 02 No.
HT Metering for Creation of dedicated 200 kVA Substation
Design, Fabrication, Supply, installation, testing and commissioning of 11kV Pilfer resistant metering cubicle for 3phase 4 wire metering system made of MS Sheet steel thickness not less than 2mm duly power coat painted suitable for indoor as well as outdoor as per the site requirement. The cubicle shall be painted through 7-tank process. The External dimensions should be adequate. Panel having two compartments upper Meter compartment and lower CT/PT compartment. Provided with synthetic or semi synthetic gasket firmly glued to the sufrace, Dust, weather and Vermin proof and shall comply degree of protection IP 65 both the chambers having one sided hinged door arrangments. The metering panel shall be provided with two No MS channels of size 100 x 50 mm on the front and rear sides duly welded and 4 No of lifting hooks. It should be possible to take meter reading manually, through CMRI and computer without opening the LV chamber door
Supply, installation, testing and commissioning of Single Phase, Single core, single ratio, Epoxy resin Cast Current Transformers suitable for 11kV, copper wound primary type with rated burden 5VA and accuracy class 0.5 or better and conforming to IS2705 (part-I & II) amended upto date. ISF shall be upto 5. The CT ratio shall be as under:. CT ratio:- i. 2.5 /5 for 25kVA DT ii. 5/5 for 63kVA DT iii. 7.5/5 for 100kVA DT iv. 15/5 for 200kVA DT v. 20/5 for 250kVA DT vi. 25/5 for 400kVA DT vii. 50/5 for 630kVA DT viii. 75/5 for 1MVA DT
Supply, installation, testing and commissioning of 11kV/ 110 V, Three phase epoxy resin cast PT with rated burden 15VA per phase andaccuracy class 0.5 or better and conforming to IS:3156 (part-I&II) amended upto date with proper colour coded identification. PTs shall be of uniform insulating and withstand separate source 23 KV pf for one minute.
Supply, installation, testing and commissioning of Bus Bar as per details: CTs bus bar:- 40x6 mm copper strip or adequate size. PTs bus bar: Copper wire 8 SWG or 30x0.6mm copper flat strip to connect PT terminal or adequate size duly insulated by the monoplast tape.
Supply, installation, testing and commissioning of PVC Copper wire flexible multi-strand of required size for secondary connections for CT wiring the minimum wire size shall be 4 mm2 (RYB) and for PT wiring minimum wire size shall be 2.5 mm2 (RYB).
Supply and fixing of Copper Lugs preferably ring type duly crimped for termination of wires and tapes
Providing and fixing of Grounding bus of minimum 40mm copper, 25cm long fixed to the unit in HV chamber. The CTs, PT meter and 11 KV Cable sheath shall be grounded to the bus through grounding wire (green) of min size 10mm2.
Supply, installation, testing and commissioning of 3Ph, 3 Wire HT CT/PT operated Fully static Smart Tri-Vector Energymeters DLMS CompliantCategory 'C' with RS232 port for modem compatibility. 11kV/110V, Ph-Ph (3P,3W) metersfor measurement of different electrical parameters including Active Energy (kWh/ MWh), Reactive Energy (kVArh/MVArh), Apparent Energy (kVAh/ MVAh) etc. (make L&T, Secure,ABB)
Supply and fixing of Pedestal made out of G.I Channel of size 75 x 40 mm or angle iron of size (65 x 65 x 5) mm, duly painted as per site requirement for mounting of metering panel including concrete foundation wherever required including cost of nuts and bolts.
Supply and fixing of Independent flexible PVC pipes for CT wiring and PT wiring of appropriate size from HTcompartment to meter compartment
Supply, installation, testing and commissioning of 3 Core 11 kV Aluminium cable XLPE armoured 35 mm2 including cost of clamp for its fixing where ever required.
Supply, installation, testing and commissioning of Cable termination kits suitable for 3 x 35 mm2 XLPE Cable (indoor/outdoor)
Providing and laying of Earthing by way of 40 mm GI Pipe earthing for HT metering. Job includes , excavation, enhancement material and man Hole Chamber (500x450x600)mm with frame and cover.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
SBD27.pdf
Tender Documents • 0.88 MB
Combineapprovedkpdcl.pdf
Other Document • 28.39 MB
DTspecifications.pdf
Other Document • 0.70 MB
BOQ_947190.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid