| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.8 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹45.0 L+₹20,065 (0.45%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹48.3 L+₹3.5 L (7.82%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L4₹48.6 L+₹3.8 L (8.37%)Accepted-Finance GOVT CONTRACTOR ROOM NO 10 MARTHOMA CHURCH SHOPPING COMPLEX POST BOX NO 240 GOAL GHAR SRI VIJAYA PURAM PIN 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L4 | Accepted-Finance Accepted | |
| 5 | L5₹48.8 L+₹3.9 L (8.78%)Accepted-Finance | L5 | Accepted-Finance Accepted |
Tender Value
₹59.9 L
Closing Date
3 Nov 2021, 3:00 pmClosed
Executive Engineer, RCD,APWD, Wimberly Gunj
Executive Engineer, RCD,APWD, Wimberly Gunj
Providing road side drainage between Bambooflat and Stewart Gunj under RCD, Wimberly Gunj
2021_APWD_4056_1
NIT No. 68/EE/RCD/APWD/WG/2021-22
Open Tender
Civil Works - Others
Item Rate
120 days
Wimberly Gunj
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
5 Nov 2021
8 Oct 2021
5 Nov 2021
9 Oct 2021
3 Nov 2021
22 Oct 2021
Amount
EARTH WORK
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
CONCRETE WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns
REINFORCED CEMENT CONCRETE
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in lintels, beams and bressumers, including setting in cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering and shuttering but , excluding the cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
FLOORING
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate
FINISHING
12 mm cement plaster finished with a floating coat of neat cement of mix :
1:4 (1 cement: 4 fine sand)
T ABDUL BASHEER
K BALAKRISHNAN
MANICKAM ENTERPRISES
M/s V M K CONSTRUCTION
I THIRUMALAI
M/s P A S Construction
V M YOUSUF
A Palani
M Abdul Hameed
Haneefa Constructions
M/S SUNDARAM CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .