| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | 2₹1.8 L+₹21,999 (13.8%)Rejected-AOC 1 338 BX 1ST STREET UTHUKULI ROAD GOLDEN NAGAR CHENGAPPALLI TIRUPPUR 638 812 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 638812 | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Sathish Kumar & Co L1 | M/s A.Chelladurai & Co L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. | 11 | m³ | 150 ₹1,650 Lowest | 250 ₹2,750 |
| 2.00 | Plain cement concrete in CC 1:3:6, using 20mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 2 | m³ | 5,800 ₹11,600 Lowest | 6,600 ₹13,200 |
| 3.00 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, etc., complete but excluding cost of steel reinforcement. | 3 | m³ | 8,000 ₹24,000 Lowest | 9,500 ₹28,500 |
| 4.00 | Refilling foundation with gravel including cost of all materials labour all leads and lifts , watering, consolidation etc., complete as per standard specification and as per direction of the Engineer incharge. | 3.64 | m³ | 2,700 ₹9,828 | 400 ₹1,456 Lowest |
| 5.00 | Brick work in CM 1:5 using fly ash bricks, including cost of all materials, labour, curing, all leads and lifts etc., complete. | 5.5 | m³ | 6,200 ₹34,100 Lowest | 7,000 ₹38,500 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for grade beam including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement) | 1 | m³ | 8,500 ₹8,500 Lowest | 17,500 ₹17,500 |
| 7.00 | Plastering in CM 1:5, 12 mm thick including the cost of all material, cement, labour charges, scafolding charges, all leads, lifts, as per standard specification | 26.5 | m² | 290 ₹7,685 Lowest | 300 ₹7,950 |
| 8.00 | Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. | 350 | kgs | 90 ₹31,500 Lowest | 100 ₹35,000 |
| 9.00 | Colour washing two coats using exterior emulsion paint over one coat of primer of best quality including cost of all materials, labour,all leads & lifts etc., complete, as per standard specification. | 26.5 | m² | 250 ₹6,625 Lowest | 350 ₹9,275 |
| 10.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹12,193.92 Lowest | 9 ₹13,871.79 |
Tender Value
Refer Docs
EMD Value
₹1,900
Closing Date
17 Aug 2026, 2:00 pmClosed
SE/CEDC/North/CBE
O/o The Superintending Engineer, CEDC/North, Tatabad, Coimbatore-12
SE/CEDC/N/CBE/C/No.01/26-27
2026_EB_690253_1
SE/CEDC/N/CBE/C/No.01/2026-27
Open Tender
Civil Works
Works
60 days
Central store/North/Coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,900
Yes
6 Oct 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. | 11 | m³ | - | - |
| 2 | Plain cement concrete in CC 1:3:6, using 20mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 2 | m³ | - | - |
| 3 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, etc., complete but excluding cost of steel reinforcement. | 3 | m³ | - | - |
| 4 | Refilling foundation with gravel including cost of all materials labour all leads and lifts , watering, consolidation etc., complete as per standard specification and as per direction of the Engineer incharge. | 3.64 | m³ | - | - |
| 5 | Brick work in CM 1:5 using fly ash bricks, including cost of all materials, labour, curing, all leads and lifts etc., complete. | 5.5 | m³ | - | - |
| 6 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for grade beam including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement) | 1 | m³ | - | - |
| 7 | Plastering in CM 1:5, 12 mm thick including the cost of all material, cement, labour charges, scafolding charges, all leads, lifts, as per standard specification | 26.5 | m² | - | - |
| 8 | Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. | 350 | kgs | - | - |
| 9 | Colour washing two coats using exterior emulsion paint over one coat of primer of best quality including cost of all materials, labour,all leads & lifts etc., complete, as per standard specification. | 26.5 | m² | - | - |
| 10 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_829787.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .