Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.8 LAdmitted-Fee/PreQual/Technical/Finance WARD NO 03 PO PANIGRAHIPENTHO P S BADA BAZAR DIST GANJAM ODISHA PIN 760006 | PANIGRAHIPENTHO | GANJAM | ODISHA | 760006 | -29.99% | ₹27.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹29.3 L+₹1.5 L (5.41%)Admitted-Fee/PreQual/Technical/Finance | -26.20% | ₹29.3 L+₹1.5 L (5.41%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹29.5 L+₹1.6 L (5.83%)Admitted-Fee/PreQual/Technical/Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | -25.91% | ₹29.5 L+₹1.6 L (5.83%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹29.7 L+₹1.9 L (6.84%)Admitted-Fee/PreQual/Technical/Finance AT JAGANATHPUR PO TURUBUDI PS JARADA DIST GANJAM PIN 761209 | GANJAM | ODISHA | 761209 | -25.20% | ₹29.7 L+₹1.9 L (6.84%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹30.8 L+₹3.0 L (10.7%)Admitted-Fee/PreQual/Technical/Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | -22.50% | ₹30.8 L+₹3.0 L (10.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹39.8 L
EMD Value
₹39,800
Closing Date
18 May 2026, 5:30 pmClosed
SE, Berhampur Irrigation Division, Berhampur
O/o SE, Berhampur Irrigation Division, Berhampur, PIN 760004
Improvement to the left bank of Desaghai Nalla in between Desaghai Anicut and Isaneswar Temple near village Golanthara.
2026_CEBMB_128812_7
e-BEID-01/2026-27
National Competitive Bid
Civil Works - Others
Percentage
180 days
Berhampur
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹39,800
Yes
3 Sept 2026
7 May 2026
19 May 2026
7 May 2026
18 May 2026
7 May 2026
7 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees in area of light jungles upto 300mm girth, removal of stumps of trees cut earlier, disposal of unserviceable materials and debris away from the work site and stacking of serviceable materials to be used or auctioned up including removal and disposal of top organic soil not exceeding 150mm in thickness with all leads, lifts and delifts, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge | 12,320 | One Sqm | 8.4 | ₹1,03,488 |
| 2 | Compacting and watering upto O.M.C. rolling earth work with P.R.R. in embankment in layers not exceeding 0.23m by power road roller including hire and running charges of the roller with in intial lead & lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth, well watered and compaction up to O.M.C with P.R.R., all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer in charge. (Measurement is to be taken on finished level section) | 6,517.5 | One Cum | 115.9 | ₹7,55,378.25 |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all leads, lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per specification and as directed by the Engineer-in-charge within initial lead of 1km from the place of excavation, B & O.C. Workers Welfare Cess etc. complete as per specification and as directed by the Engineer-in-charge.(Measurement is to be taken on finished level section) | 9,812 | One Cum | 210.1 | ₹20,61,501.2 |
| 4 | Labour for collection & spreading moorum and consolidation with HRR including watering but excluding cost and conveyance of moorum of all materials, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-Charge.(Measurement is to be taken on finished level section) | 440 | One Cum | 1,508.7 | ₹6,63,828 |
| 5 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 32.1 | One Cum | 276.9 | ₹8,888.49 |
| 6 | Filling in foundation and plinth and sides of structures with sand of approved quality including watering & ramming with all leads, lifts and delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T & P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-Charge. | 5.85 | One Cum | 976.6 | ₹5,713.11 |
| 7 | Cement concrete (1:3:6) with 4cm size hard granite crusher broken metal of approved quality free from weathered skin surface and any other deleterious materials with all leads, lifts & delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, watering & curing, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 11.7 | One Cum | 6,189.9 | ₹72,421.83 |
| 8 | Cement concrete (1:2:4) with 12mm size hard granite crusher broken chips of approved quality free from weathered skin surface or any other deleterious materials with all leads, lifts & delifts including cost, conveyance, royalty EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, providing weep holes & construction joint as per requirement T&P, watering and curing, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 25.18 | One Cum | 7,832.5 | ₹1,97,222.35 |
| 9 | Providing Form Work for concrete with F-1 finish for unexposed surfaces of structures with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials & T & P, B & O.C. Workers Welfare Cess complete as directed by the Engineer-in-Charge. | 57.12 | One Sqm | 663.6 | ₹37,904.83 |
| 10 | Supplying, laying and fixing in position 600mm dia. R.C.C. spun pipes of NP3 class confirming to ISI specification with collars jointed with cement mortar 1:3 with all leads,lifts & delifts including cost, conveyance etc. of all materials, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 20 | One Rmt | 3,191.6 | ₹63,832 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
DTCN07.pdf
Tender Documents • 4.27 MB
BOQ_589825.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .