Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹21.1 L+₹17,160 (0.82%)Rejected-Finance | L2 | Rejected-Finance High | |
| 3 | L3₹21.3 L+₹34,320 (1.64%)Rejected-Finance | L3 | Rejected-Finance High | |
| 4 | L4₹26.4 L+₹5.5 L (26.3%)Rejected-Finance | L4 | Rejected-Finance High | |
| 5 | L5₹27.2 L+₹6.3 L (29.9%)Rejected-Finance | L5 | Rejected-Finance High |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
12 May 2021, 6:00 pmClosed
GE Gurdaspur
Garrison Engineer, Gurdaspur (Tibri)
Manning and operation of pump houses and sewage istallation at Zone-I area of Tibri Mil Stn under GE Gurdaspur.
2021_MES_437703_1
GE GSR-05/2021-2022
Open Tender
Civil Works
Item Rate
330 days
Garrison Engineer, Gurdaspur (Tibri)
As per tender documents
8 documents required · 8 mandatory
₹500
GE Gurdaspur
₹90,000
1 Jun 2021
22 Apr 2021
14 May 2021
22 Apr 2021
12 May 2021
7 May 2021
Amount
Manning, operation and routine maintenance of water supply installations Pump House No 01 (DBN) in 03 shifts per day (each shift of 08 hrs) including Sunday, Holiday and reliver duties by deploying 01 Semi Skilled operator per shift. Details of equipment / plant installed in each installation requiring operation are as under :- (i) Deep well type Submersible pump set 20 BHP, 3 phases, 415 volts installed in bore well submersible pump set : 01 No. (ii) LT Panel board complete comprising with MCCB's , Star Delta starter, Ammeter, voltmeter, indicatior lamps etc.-01 Nos. (iii) Water chlorination system comprising of hypochloride solution doser / bleaching powder doser / chloronome plant, as per inventory for disinfection of water and to maintain specified residual chlorine all as directed. (Note :- Chemicals e.g hypochlorite solution / bleaching powder / chlorine gas will be issued by department free for use for regular dosing ). (iv) Complete installation complex comprising of bore well pump house building, over head reservoir control valves and surrounding area inside fencing. Note for Srl item No 2 to 9 :- (i) Scope of work shall include pumping of water from borewell to OH reservoir, chlorination using installed doser and chemicals at specified dose and delivery water to connected areas at specified timing in 03 shifts per day and maintaining records all as directed. (ii) Scope of work shall also include operation of stand by Gen Set (if held at Pump house) during comercial supply failure / break downs. (iii) Regular cleaning and maintenance of area of installation complex including cutting of grass / bushes all around pump house bldg, OH reservoir and surrounded area inside fencing of installation is deemed to be included in the unit rate quoted. Accepting officer shall inspect the site in every month . In case area found dirty a penalty of Rs. 1000/- per plant shall impose to contractor. In absence of any pump operator/ Helper a penalty of Rs. 500/- per person per shift shall be impose to contractor. (iv) Periodical servicing and maintenance of installed machineries including dusting, lubrication, tightening of bolts and nuts, glands and seals, cleaning of silver contacts of starters, tightening of cable connections etc. complete for day to day requirement. The cost of cleaning materials, T&P required etc shall be included in quoted rates. Contractor shall be fully responsible for up keep of installations neat and clean. (v) Cost of stationary required for log books / plant running records of installation, including record of chamical dosing and residual chlorine on specified format and periodical maint record, duty roaster of manpower deployed etc shall be included in item rate quoted. The chemical e.g sodium hypochlorite solution and bleaching powder required for disinfection shall be issued by department free for dosing which shall be collected by Contractor's rep from MES store yard on routine basis. Cost of bucket required for manual dosing of chemicals at each installation and hand gloves for safety of tradesman shall be included in item rate quoted. Arrangement of security passes of the operators are responsibility of the Contractor. (vi) Major repairs required for the pump sets, valves, pannels etc shall be got done by department which will have to be intimated immediately on its unserviceability. However if any unserviceability occured due to negligency of operator e.g single phasing, overload, loose contact etc, the repair responsiblility shall entirely rest on contractor and will be done by the contractor at his own expense. (viii) The contractor will be responsible for reliever/rest of operator duty without any financial effects. (ix) All the operators should have minimum education of ITI certificate with an experiance of minimum 3 years of such type of duties. Engineer-in- charge will personally take interview of all the operators and have full power to reject any operato have no knowledge to operate the pumps. (x) Operator shall be in proper uniform on duty. Uniform will be as directed by Engineer-in-Charge including name plate of the operator. Panelty of Rs. 200/- per incidence will be levied if operator is found without authorized uniform.
Manning, operation and routine maintenance of water supply installations Pump House No 04 (96 Bde) in 03 shifts per day (each shift of 08 hrs) round the clock including Sunday, Holiday and reliver duties by deploying 01 semi skilled operator per shift . Details of equipment / plant installed in each installation requiring operation are as under :- (i) Submersible pump set deep well type 50 BHP , 3 Phases, 415 volts installed in bore well submersible pump set : 01 No (ii) LT control Panel board complete comprising of MCCB's , Star Delta starter, Ammeter, voltmeter indicator lamps etc-01 No. (iii) Water chlorination system comprising of hypochlorite solution doser / bleaching powder doser / chloronome plant, as per inventory for disinfection of water and to maintain specified residual chlorine all as directed. (Note :- Chemicals e.g hyprochlorite solution / bleaching powder / chlorine gas will be issued by department for regular dosing ). (iv) Complete installation complex comprising of bore well pump house building, over head reservoir control valves and surrounding area inside fencing.
Manning, operation and routine maintenance of water supply installations Pump House No 06 (96 Bde) in 03 shifts per day (each shift of 08 hrs) round the clock including Sunday, Holiday and reliver duties by deploying 01 semi skilled operator per shift. DETAILS OF EQUIPMENT/ PLANT INSTALLED IN EACH INSTALLATION REQUIRING OPERATION ARE AS UNDER :- (i) Submersible pump set deep well type 55 BHP, 3 phases, 415 volts installed in bore well submersible pump set : 01 No. (ii) LT Panel board complete comprising with MCCB's , Star Delta starter, Ammeter, voltmeter, indicatior lamps etc.-01 Nos. (iii) Standby Gen Set of capacity between 31..5 KVA to 100 KVA (to be operated during power failure) complete with control panel , change over switch, cables etc (At one installation only). (iv) Water chlorination system comprising of hypochlorite solution doser / bleaching powder doser / chloronome plant, as per inventory for disinfection of water and to maintain specified residual chlorine all as directed. (Note :- Chemicals e.g hyprochlorite solution / bleaching powder / chlorine gas will be issued by department for regular dosing ). (v) Complete installation complex comprising of bore well pump house building, over head reservoir control valves and surrounding area inside fencing.
Manning, operation and routine maintenance of water supply installations Pump House at (66 ARMD) in 03 shifts per day (each shift of 08 hrs) round the clock including Sunday, Holiday and reliver duties by deploying 01 semi skilled operator per shift . DETAILS OF EQUIPMENT/ PLANT INSTALLED IN EACH INSTALLATION REQUIRING OPERATION ARE AS UNDER :- (i) Submersible pump set deep well type 50 BHP, 3 phases, 415 volts installed in bore well submersible pump set : 01 No. (ii) LT Panel board complete comprising with MCCB's , Star Delta starter, Ammeter, voltmeter, indicatior lamps etc.-01 Nos. (iii) Standby Gen Set of capacity between 31.5 KVA to 100 KVA (to be operated during power failure) complete with control panel , change over switch, cables etc (At one installation only). (iv) Water chlorination system comprising of hypochlorite solution doser / bleaching powder doser / chloronome plant, as per inventory for disinfection of water and to maintain specified residual chlorine all as directed. (Note :- Chemicals e.g hyprochlorite solution / bleaching powder / chlorine gas will be issued by department for regular dosing ). (v) Complete installation complex comprising of bore well pump house building, over head reservoir control valves and surrounding area inside fencing.
Manning, operation and routine maintenance of Sewage pump house No. 04 (96 Bde area) in 02 shifts per day (each shift of 08 hrs) (06.00 hrs to 14.00 hrs and 14.00 hrs to 22.00 hrs) including Sunday/ Holiday and reliver duties by deploying minimum 01 semi skilled operator per shift . DETAILS OF EQUIPMENT/ PLANT INSTALLED IN EACH INSTALLATION REQUIRING OPERATION ARE AS UNDER :- (i) Non clog submersible pump set 12.5 BHP : 04 Nos (One pump set to run at a time). (ii) LT Panel board complete comprising with MCCB's , KWH meter, bus bar, Ammeter, Voltmeter, indicator lamp etc : 01 No. (iii) Complete installation comprising of sewage well, pump house/ panel room with voltage stabilizer 25 KVA and control valves. NOTES :- The sewage pump operator will take out the sewage pump from sump and cleaning the debris and re-install the pump as and when required or as directed by AGE E/M/ JE E/M, but not more than 3 times per month. The cost of taking out sewage pump and cleaning the entry of the pump and re-installing pump will be included in the quoted rate of contracts.
Manning, operation and routine maintenance of Sewage installations PH No 05 (Tatra Chawk) and Sewage installation at New STP 2 Tank New PH No 06 of 02 shifts per day (each shift of 08 hrs) (06.00 hrs to 14.00 hrs and 14.00 hrs to 22.00 hrs) including Sunday/ Holiday and reliver duties by deploying minimum 01 semi skilled operator per shift . DETAILS OF EQUIPMENT/ PLANT INSTALLED IN EACH INSTALLATION REQUIRING OPERATION ARE AS UNDER :- (i) Sewarage pump set 15 BHP : 02 Nos (One pump set to run at a time at both the pump house). (ii) LT Panel board complete comprising with MCCB's , KWH meter, bus bar, Ammeter, Voltmeter, indicator lamp etc : 02 No. (iii) Complete installation comprising of sewage well, Pumps/ Valves/pipe lines/ pump house/ panel room, security lights etc. NOTES :- The sewage pump operator will take out the sewage pump from sump and cleaning the debris and re-install the pump as and when required or as directed by AGE E/M/ JE E/M, but not more than 3 times per month. The cost of taking out sewage pump and cleaning the entry of the pump and re-installing pump will be included in the quoted rate of contracts.
Manning, operation and routine maintenance of Gurdaspur Sewage Pump House No. 3 in 02 shifts per day (each shift of 08 hrs) (06.00 hrs to 14.00 hrs and 14.00 hrs to 22.00 hrs) including Sunday/ Holiday and reliver duties by deploying minimum 01 semi skilled operator per shift . DETAILS OF EQUIPMENT/ PLANT INSTALLED IN EACH INSTALLATION REQUIRING OPERATION ARE AS UNDER :- (i) Sewarage pump set 15 BHP : 02 Nos (One pump set to run at a time). (ii) LT Panel board complete comprising with MCCB's , KWH meter, bus bar, Ammeter, Voltmeter, indicator lamp etc : 01 No. (iii) Complete installation comprising of sewage well, Pumps/ Valves/pipe lines/ pump house/ panel room, security lights etc. NOTES :- The sewage pump operator will take out the sewage pump from sump and cleaning the debris and re-install the pump as and when required or as directed by AGE E/M/ JE E/M, but not more than 3 times per month. The cost of taking out sewage pump and cleaning the entry of the pump and re-installing pump will be included in the quoted rate of contracts.
Manning, operation and routine maintenance of water supply installations Pump House at Shikar Amn Dump in 02 shifts per day (each shift of 08 hrs) round the clock including Sunday, Holiday and reliver duties by deploying 01 semi skilled operator per shift . Details of equipment / plant installed in each installation requiring operation are as under :- (i) Submersible pump set deep well type 20 BHP , 3 Phases, 415 volts installed in bore well submersible pump set : 01 No (ii) LT control Panel board complete comprising of MCCB's , Star Delta starter, Ammeter, voltmeter indicator lamps etc-01 No. DG Set of capacity 25/34 KVA. Drawing of FOL from Main Office as and when required. (iii) Water chlorination system comprising of hypochlorite solution doser / bleaching powder doser / chloronome plant, as per inventory for disinfection of water and to maintain specified residual chlorine all as directed. (Note :- Chemicals e.g hyprochlorite solution / bleaching powder / chlorine gas will be issued by department for regular dosing ). (iv) Complete installation complex comprising of bore well pump house building, over head reservoir control valves and surrounding area inside fencing.
Harbhajan electric co
P S BUILDERS
M/S BALWINDER SINGH
JAI DURGA CONSTRUCTION CO
M/s Parv Enterprises
M/S J N TRADERS
RAM CHAND SAINI & BROS.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .