| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹37.8 LAccepted-AOC AT PLOT NO 2047 SABARASAHI LANE KALPANA SQUARE BHUBANESWAR KHORDHA ODISHA | BHUBANESWAR | KHORDHA | ODISHA | ₹37.8 L | 1st | Accepted-AOC After transparent lottery system M/s B. M. ELECTRICALS AND CONSTRUCTION got successful 1st lowest tenderer. |
| 2 | 1st₹37.8 LRejected-AOC PLOT NO 783 JAIL ROAD JHARPADA BHUBANESWAR | BHUBANESWAR | KHURDHA | ODISHA | ₹37.8 L | 1st | Rejected-AOC Bidder not qualified in transparent lottery system. |
| 3 | 1st₹37.8 LRejected-AOC AT DUMDUMA KHANDAGIRI PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA | KHORDHA | ODISHA | 751019 | ₹37.8 L | 1st | Rejected-AOC Bidder not qualified in transparent lottery system. |
| 4 | 1st₹37.8 LRejected-AOC AT EMERALD GREED DUPLEX A 7 KALARAHANGA PATIA BHUBANESWAR DIST KHORDHA ODISHA PIN 751024 | KHORDHA | ODISHA | 751024 | ₹37.8 L | 1st | Rejected-AOC Bidder not qualified in transparent lottery system. |
Tender Value
₹44.5 L
EMD Value
₹44,600
Closing Date
29 Dec 2025, 5:00 pmClosed
Superintending Engineer
O/o S.E., Bhanjanagar (RandB) Division, Bhanjanagar
Shifting, Re erection of HT Line,LT Line and S/S from padamnabha Flou mill to G.P office Subalaya Improvement such as widening and strengthening of 6th of A.K.O road to Polasara via Subalaya (ODR) from 00/000 to 20/617 Km in the district of Ganjam
2025_EICCL_123443_2
S.E.-BNJ-RandB-18/2025-26
Open Tender
Electrical Works
Percentage
90 days
Bhanjanagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹44,600
Yes
17 Aug 2026
18 Dec 2025
30 Dec 2025
18 Dec 2025
29 Dec 2025
18 Dec 2025
18 Dec 2025 - 26 Dec 2025
PART-A(100KVA S/S) Supply, Fabrication and Installation of 9mtr. Long 300kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Top Channel(100x50x6mm) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Transformer Mounting Channel (100x50x6mm) GI Channel 2.8mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of AB Switch & HG Mounting Channel (75x40x6mm) 2.8mtr. long @6.8Kg/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Transformer Belting Bracket (50x50x6mm) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV Disc insulator Insulator Polymer 45KN as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV H/W fitting(B&S type) (3Bolted) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV AB switch 3pole (200amp), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV HG Fuse 3pole (200amp), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Lighting arrester (9KV,5KA) DH class as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of PG clamp for 55mm2 AAA conductor as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of L.T distribution Box with MCCB Aluminium Busbar of Two bay with kitkat fuse for 100KVA S/S as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of HT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Stay clamp(1.4KG/Pair), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 7/10 SWG stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of GI pipe earthing 40mm dia medium gauge 3mtrs. long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 25x6mm GI Flat earthing (1.2mtr/Kg) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of M.S Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 3.5Cx120sqmm LT PVC Cable Unarmoured as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of RCC Base as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 55mm2 AAA conductor as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Black paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Yellow color paint for Back Ground paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Labour Charges for Dismentalling of AB switch including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply, Fabrication and Installation of 9mtr. Long 300kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply, Fabrication and Installation of 100x116mm Rs Joist Pole(23Kg/mtr.) 10mtr. Long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply, Fabrication and Installation of 100x116mm Rs Joist Pole(23Kg/mtr.) 11mtr. Long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply, Fabrication and Installation of 150x150mm Rs Joist Pole(30.6Kg/mtr.) 11mtr. Long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply, Fabrication and Installation of 160x152mmWPB Pole(30.44Kg/mtr.) 13mtr. Long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 100x50x6mm channel for Straight Cros arm 1.2mtr each 12nos. &0.2mtr. long12Nos. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV Disc insulator Insulator Polymer 45KN as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV H/W fitting(B&S type) (3Bolted) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of HT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Stay clamp(1.4KG/Pair), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 7/10 SWG stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of M.S Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV "V" Cross arm(22Kg) GI as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of G.I Back Clamp For 11KV "V" Cross arm(1.7Kg) each as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV F clamp as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11 kv pin insulator 320CD Polymer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of RCC Base plate for PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 55mm2 AAA conductor as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of PG clamp for 55mm2 AAA conductor for jumpering as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
PART-B( 11KV line) Supply, Fabrication and Installation of 10mtr. Long 330kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 10SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Eye Hook for Cradle Guard as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 40mm nominal bore GI pipe earthing with 3 mtr. long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 50x6mm GI Flat earthing (1.2mtr/Kg) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Black paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Yellow color paint for Back Ground paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
PART-C(Road Crossing) Supply and Installation of 75x40x4.8mm G.I channel2.2mtr long 4nos. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of (3x50+1x35+1x16) mm2 LT XLP
Supply and Installation of Pole clamp for Eye Hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
E AB Cable as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Eye Hook For AB Cable as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Dead end Clamp for I Hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Suspension clamp with I hook Cement as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of LT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of strain fitting as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of LT Stay Clamp 1.4Kg/Pair) , as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of MS Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 7/12SWG( 1.4Kg/Pair) , as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of LT Distribution Box polycarbonate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of IPC KZ2X150 LT ABC 50SQMM TYPE -B as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Black paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Yellow color paint for Back Ground paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of RCC Base as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
PART-D(LT Line) Supply, Fabrication and Installation of 8mtr. Long 200kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Buckless for steel strap per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Top Pressure GI Channel(100x50x6mm) 3.0mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Double pole Belting Channel (75x40x6mm) GI Channel 2.8mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Bracing Channel (50x50x6mm) GI Channel 3.512mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of AB Switch Mounting Channel (75x40x6mm) 2.8mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of fish plate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of supporting Channel for AB Switch Handle(100x50x6mm) 2.8mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 50x6mm GI Flat earthing (1.2mtr/Kg) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV H/W fitting(B&S type) (3Bolted) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV Disc insulator Insulator Polymer 70KN as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of PG clamp for 55mm2 AAA conductor for jumpering as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of G.I Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of HT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Stay clamp(1.4KG/Pair), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 7/10 SWG stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of supporting Channel for Down pipe(75x40x4.8mm) 2.8mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11KV AB switch 3pole (400amp), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Lighting arrester (9KV,10KA) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of GI pipe earthing 40mm dia medium gauge 3mtrs. long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 11 kv 5 KN pin insulator 320CD Polymer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of 55mm2 AAA conductor as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Black paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of RCC Base as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and painting of Yellow color paint for Back Ground paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
PART-E(AB Switch) Supply, Fabrication and Installation of 9mtr. Long 300kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of G.I Base plate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Cement concrete for 11MTR RS Joist Pole C.c 1:1.5:3 by using 4cm size HBG metal as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Cement concrete for 13MTR RS Joist Pole C.c 1:1.5:3 by using 4cm size HBG metal as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Couping of Poles in ratio 1:1.3:3 by using 4cm size HBG metal as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Cement concrete for 9/8MTR PSC Pole C.c 1:1.5:3 by using 4cm size HBG metal as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of material for masonary work for earth pit,charcoal,salt etc per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Cement concrete for Support of stay/ anchore plate/stud as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of Civil Cost for making TRF plinthas per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
PART-D(Civil work) Supply and Installation of Cement concrete for 10MTRPSC Pole C.c 1:1.5:3 by using 4cm size HBG metal as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Supply and Installation of G.I fencing with gate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Labour Charges for Dismentalling of Existing 100KVA DTR including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
Labour Charges for Dismentalling of ACST/AAA Conductor including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
DTCN_2.pdf
Tender Documents • 0.69 MB
BOQ_572232.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .