Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -3.33% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹1.4 L (1.27%)Admitted-Finance | -2.10% | ₹1.1 Cr+₹1.4 L (1.27%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹6.0 L (5.50%)Admitted-Finance | +1.99% | ₹1.1 Cr+₹6.0 L (5.50%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical ok |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical ok |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
5 Mar 2026, 6:00 pmClosed
WDSC JHALAWAR
WDSC JHALAWAR
CONSTRUCTION OF ANICUT PAKKA CHECK DAM, MPT,CCT, DCCT AT G.P KOHADIJHAR , ASALPUR , BORBAND MJSA 2.2 PS AKLERA ( 31 Work)
2026_WDSC_539413_1
NIT NUM 18 2025-26 WDSC JHALAWAR
Open Tender
Civil Works
Percentage
JHALAWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹2.3 L
Yes
27 Mar 2026
17 Feb 2026
6 Mar 2026
17 Feb 2026
5 Mar 2026
17 Feb 2026
Item Description
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) #196(ब)
lhesUV dUdzhV 1 lhesUV % 3 jsr % 6 fxV~Vh iRFkj dh 20 fe-eh- ukeh; eki dh uhao es feykdj Mkyuk rFkk dwVuk] rjkbZ vkfn lfgr psd Mse@,fudV ds fy;s
lhesUV dUdzhV 1 lhesUV % 2 ctjh % 4 ,XkzhxsV vuqikr esa iRFkj dh 12 fe-eh- ukeh; eki dh ,XkzhxsV ds lkFk Mkyuk] dwVuk rFkk rjkbZ vkfn lfgr psd Mse@,fudV ds fy;s
lsUVfjax 'kVfjax ¼r[rk ,oa <qykcanh½ dk vkj-lh-lh- Nr] Lysc] NTts] fyUVy] fjVsfuax okWy vkfn Mkyus ds fy;s yxkuk 4-5 ehVj ÅapkbZ rd ds fy;s rFkk gVkuk vkfn fo'ks"k fooj.k ds vuqlkj 'kVfjax LVhy
15 से 30 सेमी मोटे हथोड़े से तरासे हुए एकल पत्थर की पिचिंग समस्त उठान के साथ, आपूर्ति के साथ ।
आर.सी.सी. काम के लिए लोहे को काटना] मोड़ना तथा स्थान पर लगाना तथा बांधने का कार्य मय आपूर्ति के ।
इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। नये कार्य पर।
5 सेमी. से 7.5 सेमी. गहराई तक डागबेलिंग का कार्य ¼BSR RD&PR 2025-26 vkbZVe ua- 167 आईटम न. 6 (ब) )
taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr ¼BSR RD&PR 2025-26 vkbZVe ua- fofo/k 191½
Benching Base and depositing the excavated material including dressing etc. complete with in intial lead up to 50m and lift up to 1.5m (WRD BSR 2023 Item No. 20,Chapter No.V)(10% Deduct)
Compaction on Earth By manually or plain roller. (density 90% of Proctor) (WRD BSR 2023 Item No. 18(A),(Chapter No.V)(10% Deduct)
Dressing of uneven embankment in required profile (WRD BSR 2023 Item No. 23,(Chapter No.V)(10% Deduct)
Watering of earth including cost of carriage of water when source of water is Beyond 1 Km but upto 5 Km extra per Km) (WRD BSR 2023 Item No. 28 A & B,(Chapter No.V)(10% Deduct)
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (c) Hard soil mixed with Kankar / boulders, Morrum (WRD BSR 2023 Item No. 1(C) ,(Chapter No.V)(10% Deduct)
Preparing locally available Munja tufts, digging of pits and planting (includes local transportation upto 1 km.) ¼ 6 ykbu esa ½ (BSR 2025 FOREST DEPT. ITEM NO.3.2.1.1(10% Deduct)
ccwy ds cht dh vkiwfrZ 2 fdyks@ykbu izfr 100 eh- ¼ 4 ykbu esa ½
क्वेरी रविस जिसमें 40 प्रतिशत पत्थर के स्पाल हो या कंकर या घाड़ला को बिछाना तथा आपूर्ति करना, पानी छिड़कना तथा दुरमुट से कूटना। ¼BSR RD&PR 2025-26 vkbZVe ua- 124½½
60X120X5.0cm ds ls.M LVksu ds ,d vksj ,usey isUV ls iqrkbZ djuk] dk;Z dk fooj.k ,oa lkbV ij 75X30X40 cm dh lkbt esa 1%3%6 lhesUV dzUdzhV CykWd ls LFkkkfir djuk
5 सेमी. से 7.5 सेमी. गहराई तक डागबेलिंग का कार्य ¼BSR RD&PR 2025-26 vkbZVe ua- 167 आईटम न. 6 (ब) )
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी को 15 सेमी. परत में दबाना (compaction) एवम् बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढ़ाना एवम् उतारना प्रारंभिक लीड 250 मी. एवम् लिफ्ट 3 मी. तक। ईकाई 1 घन मी. Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य)
नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना
LVkbZyks ?kkl ds cht dh vkiwfrZ ¼cktkj nj½ 1 fdyks@लेंन प्रति 100 eh- ¼3 लेंन में ½
[email protected] ds cht dh vkiwfrZ ¼cktkj nj½ 2 fdyks@लेंन प्रति 100 eh- ¼2 लेंन में½
LVkbZyks ?kkl ds cht dh cqokbZ 3 ykbZu es [email protected] ds cht dh cqokbZ 2 ykbZu es
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_961790.xls
BOQ • 0.34 MB
ITEM01.pdf
Tender Documents • 0.85 MB
DATE.pdf
PDF • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .