| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -3.33% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance | -2.10% | ₹1.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.1 CrAdmitted-Finance | +1.99% | ₹1.1 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical ok |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical ok |
Updated dates
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
5 Mar 2026, 6:00 pmClosed
WDSC JHALAWAR
WDSC JHALAWAR
CONSTRUCTION OF ANICUT PAKKA CHECK DAM, MPT,CCT, DCCT AT G.P KOHADIJHAR , ASALPUR , BORBAND MJSA 2.2 PS AKLERA ( 31 Work)
2026_WDSC_539413_1
NIT NUM 18 2025-26 WDSC JHALAWAR
Open Tender
Civil Works
JHALAWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹2.3 L
Yes
27 Mar 2026
17 Feb 2026
6 Mar 2026
17 Feb 2026
5 Mar 2026
17 Feb 2026
Item Description
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) #196(ब)
lhesUV dUdzhV 1 lhesUV % 3 jsr % 6 fxV~Vh iRFkj dh 20 fe-eh- ukeh; eki dh uhao es feykdj Mkyuk rFkk dwVuk] rjkbZ vkfn lfgr psd Mse@,fudV ds fy;s
lhesUV dUdzhV 1 lhesUV % 2 ctjh % 4 ,XkzhxsV vuqikr esa iRFkj dh 12 fe-eh- ukeh; eki dh ,XkzhxsV ds lkFk Mkyuk] dwVuk rFkk rjkbZ vkfn lfgr psd Mse@,fudV ds fy;s
lsUVfjax 'kVfjax ¼r[rk ,oa <qykcanh½ dk vkj-lh-lh- Nr] Lysc] NTts] fyUVy] fjVsfuax okWy vkfn Mkyus ds fy;s yxkuk 4-5 ehVj ÅapkbZ rd ds fy;s rFkk gVkuk vkfn fo'ks"k fooj.k ds vuqlkj 'kVfjax LVhy
15 से 30 सेमी मोटे हथोड़े से तरासे हुए एकल पत्थर की पिचिंग समस्त उठान के साथ, आपूर्ति के साथ ।
आर.सी.सी. काम के लिए लोहे को काटना] मोड़ना तथा स्थान पर लगाना तथा बांधने का कार्य मय आपूर्ति के ।
इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। नये कार्य पर।
5 सेमी. से 7.5 सेमी. गहराई तक डागबेलिंग का कार्य ¼BSR RD&PR 2025-26 vkbZVe ua- 167 आईटम न. 6 (ब) )
taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr ¼BSR RD&PR 2025-26 vkbZVe ua- fofo/k 191½
Benching Base and depositing the excavated material including dressing etc. complete with in intial lead up to 50m and lift up to 1.5m (WRD BSR 2023 Item No. 20,Chapter No.V)(10% Deduct)
Compaction on Earth By manually or plain roller. (density 90% of Proctor) (WRD BSR 2023 Item No. 18(A),(Chapter No.V)(10% Deduct)
Dressing of uneven embankment in required profile (WRD BSR 2023 Item No. 23,(Chapter No.V)(10% Deduct)
Watering of earth including cost of carriage of water when source of water is Beyond 1 Km but upto 5 Km extra per Km) (WRD BSR 2023 Item No. 28 A & B,(Chapter No.V)(10% Deduct)
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (c) Hard soil mixed with Kankar / boulders, Morrum (WRD BSR 2023 Item No. 1(C) ,(Chapter No.V)(10% Deduct)
Preparing locally available Munja tufts, digging of pits and planting (includes local transportation upto 1 km.) ¼ 6 ykbu esa ½ (BSR 2025 FOREST DEPT. ITEM NO.3.2.1.1(10% Deduct)
ccwy ds cht dh vkiwfrZ 2 fdyks@ykbu izfr 100 eh- ¼ 4 ykbu esa ½
क्वेरी रविस जिसमें 40 प्रतिशत पत्थर के स्पाल हो या कंकर या घाड़ला को बिछाना तथा आपूर्ति करना, पानी छिड़कना तथा दुरमुट से कूटना। ¼BSR RD&PR 2025-26 vkbZVe ua- 124½½
60X120X5.0cm ds ls.M LVksu ds ,d vksj ,usey isUV ls iqrkbZ djuk] dk;Z dk fooj.k ,oa lkbV ij 75X30X40 cm dh lkbt esa 1%3%6 lhesUV dzUdzhV CykWd ls LFkkkfir djuk
5 सेमी. से 7.5 सेमी. गहराई तक डागबेलिंग का कार्य ¼BSR RD&PR 2025-26 vkbZVe ua- 167 आईटम न. 6 (ब) )
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी को 15 सेमी. परत में दबाना (compaction) एवम् बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढ़ाना एवम् उतारना प्रारंभिक लीड 250 मी. एवम् लिफ्ट 3 मी. तक। ईकाई 1 घन मी. Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य)
नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना
LVkbZyks ?kkl ds cht dh vkiwfrZ ¼cktkj nj½ 1 fdyks@लेंन प्रति 100 eh- ¼3 लेंन में ½
[email protected] ds cht dh vkiwfrZ ¼cktkj nj½ 2 fdyks@लेंन प्रति 100 eh- ¼2 लेंन में½
LVkbZyks ?kkl ds cht dh cqokbZ 3 ykbZu es [email protected] ds cht dh cqokbZ 2 ykbZu es
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_961790.xls
BOQ • 0.34 MB
ITEM01.pdf
Tender Documents • 0.85 MB
Download all tender documents and submit your bid