| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-AOC BIRPARA PO BIRPARA DIST JALPAIGURI W B PIN 735204 | ALIPURDUAR | WEST BENGAL | 735204 | ₹9.9 Cr Quoted ₹10.7 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹11.0 Cr+₹30.0 L (2.79%)Rejected-Finance | ₹11.0 Cr+₹30.0 L (2.79%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹11.0 Cr+₹25.2 L (2.34%)Rejected-Finance | ₹11.0 Cr+₹25.2 L (2.34%) | L3 | Rejected-Finance 3RD LOWEST |
| 4 | Rejected-Technical | - | - | Rejected-Technical DOCUMENT NOT QUALIFIED |
| 5 | Rejected-Technical | - | - | Rejected-Technical DOCUMENT NOT QUALIFIED |
Tender Value
₹10.8 Cr
EMD Value
₹21.6 L
Closing Date
16 Mar 2020, 12:30 pmClosed
S E PRAYAGRAJ CIRCLE PWD PRAYAGRAJ
S E PRAYAGRAJ CIRCLE PWD PRAYAGRAJ
Improvement of the riding surface of Allahabad Gorakhpur road from km 11.650 to 26.650
2020_CEALD_442304_1
1093/06COM(3) PRG. CIRCLE/2020 dT. 27-02-2020
Open Tender
Civil Works - Roads
Item Rate
180 days
PRAYAGRAJ
AS PER NIT
3 documents required · 3 mandatory
₹2,336
EXECUTIVE ENGINEER CD3 PWD PRAYAGRAJ
₹21.6 L
Yes
S E PRAYAGRAJ CIRCLE PWD PRAYAGRAJ
4 Jun 2020
2 Mar 2020
17 Mar 2020
2 Mar 2020
16 Mar 2020
2 Mar 2020
4 Mar 2020
Amount
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Excluding GST)
Providing and laying Dense Graded Bituminous Macadam (50mm) with 100-120 TPH computerized type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder (VG-30) @ 4.50 percent by weight of total mix and filler, transporting the hotmix to work site, laying with a hygrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tensem rollers to achieve the desired compaction as per MORT&H specification clause 507 complete in all respects. (Excluding GST)
Providing and laying bituminous concrete (30mm) with 100-120 TPH computerized hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. (Excluding GST)
Brick masonary work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per Technical specification. (For repair of drain in abadi portion) (Excluding GST)
Plastering with cement mortar (1:3) on Brick work in substructures as per technical specification (For repair of drain in abadi portion) (Excluding GST)
M/S SINCERE CONSTRUCTION
M/s Strong Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .