Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.7 LAccepted-AOC 112 21 A 2 K N MUKHERJEE ROAD P O TALPUKUR BARRACKPORE 24 PGS N | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹51.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹53.9 L+₹2.3 L (4.36%)Rejected-Finance | ₹53.9 L+₹2.3 L (4.36%) | L2 | Rejected-Finance l2 |
| 3 | L3₹55.1 L+₹3.4 L (6.66%)Rejected-Finance 159 KAILASH GHOSHI ROAD KOLKATA WEST BENGAL 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | ₹55.1 L+₹3.4 L (6.66%) | L3 | Rejected-Finance l3 |
| Sl No | Description | Qty | Unit | MIK ENTERPRISES L1 | POWER INDIA L3 | PASS TREAT L2 |
|---|---|---|---|---|---|---|
| 1.00Round the clock operation & maintenance of 20 MGD capacity Raw water pumping station 6 KV substation at Nazirgunj, Howrah with adequate nos. of personnel for each month as per direction of EIC. | ||||||
| 1.01 | For the period of first year | 6.5 | Month | 1,25,400 ₹8,15,100 Lowest | 1,28,300 ₹8,33,950 | 1,26,900 ₹8,24,850 |
| 1.02 | For the period of second year | 12 | Month | 1,30,750 ₹15,69,000 Lowest | 1,33,200 ₹15,98,400 | 1,32,500 ₹15,90,000 |
| 1.03 | For the period of third year | 12 | Month | 1,35,000 ₹16,20,000 Lowest | 1,39,600 ₹16,75,200 | 1,37,200 ₹16,46,400 |
| 2.00Checking of all the mechanical parts and preventive maintenance of all pump machinery incld lifting dismantling and installation the same after removing the foreign materials from clogged pump internals as per technical specification and scope of work and direction of EIC.(Twice in a week) | ||||||
| 2.01 | For the period of first year | 52 | day | 1,030 ₹53,560 Lowest | 1,210 ₹62,920 | 1,100 ₹57,200 |
| 2.02 | For the period of second year | 104 | day | 1,080 ₹1,12,320 Lowest | 1,280 ₹1,33,120 | 1,150 ₹1,19,600 |
| 2.03 | For the period of third year | 104 | day | 1,110 ₹1,15,440 Lowest | 1,295 ₹1,34,680 | 1,210 ₹1,25,840 |
| 3.00Checking of all the electrical parts including Battery Bank and preventive maintenance of all the electrical machinery as per technical specification and scope of work and direction of EIC.((Twice in a week) | ||||||
| 3.01 | For the period of first year | 52 | day | 1,035 ₹53,820 Lowest | 1,205 ₹62,660 | 1,120 ₹58,240 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
27 Jul 2026, 1:00 pmClosed
Executive Engineer, GAP-II, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER (E/ M)/GAP-II 1/425, Gariahat Road(s), Kol-68
Round the clock Operation and Maintenance of 20 MGD Raw Water Pumping station consisting of 6 Nos. pump motor set (both state and AMRUT Fund) and 6 KV substation at Nazirgunj, Howrah (for a period of 30.5 Months ).
2026_KMDA_1032078_2
EE(E/M)/GAP-II/KMDA /2W-18/2025-26/16 Date -29.06.2026
Open Tender
ELECTRICAL WORKS M/R
Item Rate
925 days
Nazirgunj
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
Office of the Executive Engineer, GAP II, EM, KMDA
7 Sept 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Round the clock operation & maintenance of 20 MGD capacity Raw water pumping station 6 KV substation at Nazirgunj, Howrah with adequate nos. of personnel for each month as per direction of EIC. | |||||
| 1.01 | For the period of first year | - | Month | - | - |
| 1.02 | For the period of second year | - | Month | - | - |
| 1.03 | For the period of third year | - | Month | - | - |
| 2Checking of all the mechanical parts and preventive maintenance of all pump machinery incld lifting dismantling and installation the same after removing the foreign materials from clogged pump internals as per technical specification and scope of work and direction of EIC.(Twice in a week) | |||||
| 2.01 | For the period of first year | - | day | - | - |
| 2.02 | For the period of second year | - | day | - | - |
| 2.03 | For the period of third year | - | day | - | - |
| 3Checking of all the electrical parts including Battery Bank and preventive maintenance of all the electrical machinery as per technical specification and scope of work and direction of EIC.((Twice in a week) | |||||
| 3.01 | For the period of first year | - | day | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_2534404.xls
BOQ • 0.34 MB
Docs6_GAP2.pdf
Tender Documents • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .