Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
14 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Comprehensive Annual Maintenance Contract (CAMC) of Traction Transformer Make- M/s JSTI fitted in Rake-08 of Vande Bharat (Train-18), Qty.: 01Rake, Period: 24 Months.
EL-2026-27-05R
EL-2026-27-05R
Single
24 Months
Unknown (Unspecified Location)
₹0
₹3.2 L
16 Jun 2026
16 Jun 2026
30 Jun 2026
A-Comprehensive Annual Maintenance Contract (CAMC) for Traction Transformer installed
B-Mandatory Spares for Rake-08
C-Condition Based Spares for Rake-08
Item Breakup - A-Comprehensive Annual Maintenance Contract (CAMC) for Traction Transformer installed in Train Rake-08
Annual Maintenance Contract for traction transformer installed in Numbers Rake-08 (IC 2008) of Vande Bharat (Train-18), Qty.: 01Rake, Period: 24 Months (04 Transformer) (1 Nos. = 1 traction transformer for 1 month). Total 12310628.16
Item Breakup - B-Mandatory Spares for Rake-08
Preventive Spares for traction transformer (as per Annexure-I).
Breakdown Spares for traction transformer (as per Annexure-I). Total 2163114.64
Item Breakup - C-Condition Based Spares for Rake-08
Oil Level Glass Kit (Consist of 02 items) RATLAM DIVISION-ELECTRICAL/WESTERN RLY
SS Upper grid and Filter mesh assembly for cooling unit radiator Set (Consist of 11 items)
SS Lower grid and Filter mesh assembly for cooling unit radiator Set (Consist of 07items)
Auxiliary Junction Box (AJB) kit (Consist of 04 items)
Power Junction Box (PJB) kit (Consist of 04 items)
Drain / Filter valve kit (Consist of 04 items)
Cooling unit Radiator Valve kit (DN80) (Consist of 06 items)
Main Breather Kit (Consist of 06 items)
LV bushing kit (Consist of 08 items)
LV Box Gasket (Consist of 02 items)
HV Bushing kit (Consist of 05 items)
Vibration Meter
Damper Kit-60 Shore (Consist of 06items)
Damper Kit-75 Shore (Consist of 06items) Total 1762920.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1.Letterofcreditasmodeofpayment04-06-2018.pdf
ATTACHMENT
2.ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf Procedureforpaymentofcontractorbill
ATTACHMENT
3.PBGproforma.pdf
ATTACHMENT
4.NOrelativecertificate.pdf
ATTACHMENT
5.certificateforrailwayemployeere-engagement_11.pdf
ATTACHMENT
6.BidsecurityAnnexure-VIA.pdf
ATTACHMENT
7.FormatVA.pdf
ATTACHMENT
8.FormatforAnnualcontractualturnoverAnnexure-VIB1.pdf
ATTACHMENT
9.GCCAPRIL-2022.pdf
ATTACHMENT
10.GCCACS-1dt.14-07-2022.pdf
ATTACHMENT
11.GCCACS-2dt.13-12-2022.pdf
ATTACHMENT
12.GCCACS-3dt.26-04-2023.pdf
ATTACHMENT
13.GCCACS-4dt.07-08-2023.pdf
ATTACHMENT
14.GCCACS-5dt.20-10-2023.pdf
ATTACHMENT
15.GCCACS-6dt.21-12-2023.pdf
ATTACHMENT
16.GCCACS-7dt.25-09-2024.pdf
ATTACHMENT
17.GCCACS-8dt.20-12-2024.pdf
ATTACHMENT
18.GCCACS-9dt.09-01-2025.pdf
ATTACHMENT
19.GCCACS-10dt.27-03-2025.pdf
ATTACHMENT
20.ACS-1113.03.2026SECURED.pdf
ATTACHMENT
21.ClarificationannexureV.pdf
ATTACHMENT
23.TERMINATIONCONTRACT.pdf
ATTACHMENT
11thCorrectionSlipofMaintenanceMannual.pdf
ATTACHMENT
EligibleCriteriyaforOEM_1.pdfSECURED.pdf
ATTACHMENT
VANDE_BHARAT_Volume_11.pdfSECURED.pdf
ATTACHMENT
VANDE_BHARAT_Volume_2_.pdf
ATTACHMENT
TS791JSTITractiontransformer.pdf
ATTACHMENT
2.ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf
ATTACHMENT
Download all tender documents and submit your bid