Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹4.1 L+₹2.0 L (100.0%)Rejected-Finance RABINDRA NAGAR SILIGURI 734 006 | SILIGURI | DARJEELING | WEST BENGAL | 734006 | L2 | Rejected-Finance Highest | |
| 3 | L3₹4.9 L+₹2.9 L (141.0%)Rejected-Finance RABINDRA NAGAR SILIGURI 734 006 | SILIGURI | DARJEELING | WEST BENGAL | 734006 | L3 | Rejected-Finance Highest | |
| 4 | L4₹5.0 L+₹2.9 L (141.5%)Rejected-Finance PAL CHOUDHURY VILLA 4TH FLOOR NETAJI SUBHAS ROAD SUBHASPALLY | L4 | Rejected-Finance Highest |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
10 Jan 2020, 2:00 pmClosed
Superintending Engineer PWD Electrical
Superintending Engineer PWD North Bengal Electrical Circle P.W.D Inspection Bungalow Annex Building 1ST Floor Kutchery Road Venus More Siliguri
E.I work of proposed HDU Unit over existing SNCU Building within the premises of Birpara State General Hospital, Alipurduar S.I.T.C of online UPS
2020_WBPWD_263426_1
WBPWD/SENBEC/NIT-17(3RD CALL)/19-20
Open Tender
ELECTRICAL WORKS ORG
Item Rate
15 days
Birpara State General Hospital
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
Siliguri
19 Mar 2020
2 Jan 2020
13 Jan 2020
2 Jan 2020
10 Jan 2020
6 Jan 2020
6 Jan 2020
Amount
SITC of 3Ph- 3Ph true Online UPS System in standalone configuration with advance DSP based technology’ Double conversion IGBT Rectifier and IGBT based inverter UPS system with inbuilt/External Isolation transformer with cabinet and SMF battery backup using 12V batteries including battery protection M.S Rack suitable dimension, well air ventilation to ensure the battery optimum life cycle, proper rating cable for interlinks cable and D.C cable up to 10 mtrs from UPS to batteries including labour charges for installation testing and commission and carrying charges with following Special Features.
Protections: input & Output over / under voltage single phasing, DC - High / under voltage, Battery charging over current, output overload / Short Circuit / Over temp. UPS auto on mains recovery protections. Input & Output over / under voltage, single phasing, DC – High / under voltage, battery charging over current output overload / short circuit / over temp. UPS auto ON mains recovery switchgear: MCB / MCCB for input battery, output & manual bypass switch operating temp. 0 to 40Deg C, IP 20enclosure,
RH max 95% forced air cooling, max sound less then 60db, communication: Rs. 232, Rs. 485, dual input Kit, monitoring software: UPS monitoring software on windows XP platform, Certification: ISO 9001:2015 ISO 14001: 2015, ISO 18001 RoHS & OHSAS 18001, CE Certification: IEC/EN 62040-1-1, IEC/EN50091-1, IEC/EN 60950 (safety) IEC/ EN 50091-2, IEC/EN 62040-2 (EMC Emission), IEC/EN 62040-3 (performance & Design) IEC/EN 61000-4 (EMC Emmunity) & IEC/EN 60146.
Battery make:- Exide Power Safe/ Amararaja Quanta Note- i. The agency must procure the materials from the manufacturer / OEM or from their authorized sales channel so that the standard warranty / support of the Manufacturer / OEM becomes applicable to the products to be delivered and installed by them. ii. Documents that authenticates such procurement form the manufacturer / OEM or from their authorized sales channel and standard warranty / support should be sent from the e-mail of the manufacturer / OEM / authorized sales channel to the e-mail of Engineer-in-charge and hard copy of it to be submitted during execution of work / submission of bill.
iii. If any refurbished material is supplied and installed, penal action will be taken as per existing rules. (Three years spare & maintenance warranty after commissioning of the UPS to be provided; security deposit will be released after three years of commissioning date, DLP period 3 years, AGENCY / CONTRACTOR / OEM HAS TO ATTEND AND RECTIFY FAULT(S) WITHIN 24 HOURS OF RECEIPT OF COMPLAINT. CERTIFICATE IN THIS REGARD IS TO BE UPLOADED.)
MAA ENTERPRISES
M S MAYA AND SONS
BONANZA ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .