Tender Value
₹97.5 L
EMD Value
₹97,500
Closing Date
16 Jan 2023, 12:00 pmClosed
EE(PT-I), IMC, Itanagar
Itanagar
1.Const. of RCC Retaining wall at D Sector, Itanagar, 2.Construct of RCC Culvert at RWD colony, 3).Const. of RCC Retaining wall at upper ESS Sector Itanagar, 4.Const. of RCC Retaining wall at Old Dony colony Itanagar
2023_IMCAP_1010_1
IMC/EE(PT-I)/20/2022-23
Open Tender
Civil Works
Item Rate
183 days
Itanagar
Tender fee, EMD and Documents as per NIT
4 documents required · 4 mandatory
₹5,000
EE(PT-I),IMC, Itanagar
₹97,500
16 Jan 2023
7 Jan 2023
16 Jan 2023
7 Jan 2023
16 Jan 2023
7 Jan 2023
Amount
SH:- C/o RCC Retaining wall at D-Sector, Itanagar under ward Nos.07.
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specifications
b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for :
a) Foundation, footings, bases of columns etc. and mass concrete.
b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc..
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Carriage of Material
SH:- C/o Construct of RCC Culvert at RWD colony under ward No. 07
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
A) Manual Means (Depth upto 3 m)
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/TMT steel
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Foundations and plinth
b) Walls including attached buttresses, pilasters etc.
Providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.50 coarse sand : 3 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :
a) Foundations and plinth
Centring and shuttering including strutting proping etc. and removal of form work for:
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Carriage of Material
SH:- C/o RCC Retaining wall at Old Donyi Colony Itanagar ward No.07
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specifications
b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for :
a) Foundation, footings, bases of columns etc. and mass concrete.
Carriage of Material
SH:- C/o RCC Retaining wall at upper ESS Sector Itanagar under ward No. 07.
Earth work in excavation in soil containing 50 % or more of single or small size boulders up to 30 cm, size including in 20 cm, layers and breaking clods, ramming and dressing up for the purpose of making embankments of filling up ground depression lead up to 50 mtrs and left upto 1.50 mtrs.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specifications
b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for :
a) Foundation, footings, bases of columns etc. and mass concrete.
b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Carriage of Material
SH:- C/o CC footpath at Hiltop.
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the ndulations etc. and disposal of surplus earth, lead upto 50 m.)
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
Centring and shuttering including strutting proping etc. and removal of form work for:
Carriage of Material
Sh:- C/o Septic Tank with soakpit at upper ESS Sector, under ward No.07
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
Brick work with best available local bricks in foundation and plinth in cement mortar 1:3 (1 cement : 3 fine sand).
Reinforcement of RCC work including bending, binding and placing in position complete.
Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
25 mm thick cement concrete flooring 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) finished with a floating coat of neat cement
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand).
Neat cement punning.
Carriage of Material
Sh:- C/o Boundary wall at MES D- Sector.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) in ordinary soil by manual means depth upto 3m
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundation and Plinth
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
a) M 20 1 : 1.5 : 3(1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
Centring and shuttering including strutting, propping etc and removal of form work for :
a) Foundation, footings, bases of columns etc. and mass concrete.
Reinforcement of RCC work including bending, binding and placing in position complete.
Brick work with best available local bricks in foundation and plinth in cementmortar 1:3 (1 cement : 3 fine sand).
20 mm cement plaster 1 : 3 (1 cement : 6 fine sand).
Finishing walls with water proofing cement paint of approved brand and manufacture and required shade on new work (three or more coats) to give an even shade.
Applying cement slurry on RCC slabs or cement concrete work using 2.75 Kg of cement per Sq.m. for receiving cement concrete floor including roughening, cleaning etc complete.
Carriage of Material
C/o RCC Retaining wall near jio tower at RWD colony.
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specifications
b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for :
a) Foundation, footings, bases of columns etc. and mass concrete.
b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Carriage of Material
M/S G R I ENTERPRISES
stage.html
html • 0.02 MB
finance_1119.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .