Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.1 LAccepted-AOC 607 6TH FLOOR PRATEEK CENTRE SANJAY PLACE AGRA 282002 | AGRA | UTTAR PRADESH | 282002 | 1 | Accepted-AOC ACCEPTED BEING L1 | |
| 2 | 2₹33.4 L+₹1.2 L (3.85%)Rejected-Finance DOOR NO 68 2963 E3 MANDAKKARA ROAD AYYAPPANKAVU ERNAKULAM KERALA 682 018 | ERNAKULAM | ERNAKULAM | KERALA | 682018 | 2 | Rejected-Finance Not being L1 | |
| 3 | 3₹33.5 L+₹1.4 L (4.33%)Rejected-Finance | 3 | Rejected-Finance Not being L1 | |
| 4 | 4₹34.2 L+₹2.1 L (6.58%)Rejected-Finance | 4 | Rejected-Finance Not being L1 | |
| 5 | 5₹37.4 L+₹5.2 L (16.2%)Rejected-Finance HIMACHAL BUILDING SHOP NO 10 CD BARFYWALA ROAD JUHU LANE ANDHERI W MUMBAI 400058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | 5 | Rejected-Finance Not being L1 |
Tender Value
₹36.4 L
EMD Value
₹72,800
Closing Date
20 Nov 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer (I) (CG) Goa
Garrison Engineer (I) (CG) Goa HQ Coast Guard DHQ-11 Chicolna PO- Bogmalo Goa 403806
INSTALLATION OF SMART ELECTRIC METERING SYSTEM IN CGRA AT MANGALORE UNDER GE(I)(CG) GOA
2023_MES_621640_1
8433/GOA/E8
Open Tender
Miscellaneous Works
Item Rate
210 days
CGRA MANGALORE
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Garrison Engineer (I) (CG) Goa
₹72,800
Yes
15 Apr 2024
4 Oct 2023
27 Nov 2023
4 Oct 2023
20 Nov 2023
19 Oct 2023
4 Oct 2023 - 11 Oct 2023
Amount
Supply, Installation, Testing & Commissioning of Microprocessor based Single phase tamper proof electronic smart energy meter( pre paid and postpaid)rating with 2 wire 240 Volts, 50 HZ, of range 5-60 Amps, confirming to IS 16444 with LED/LCD display and parameters like Voltage, Current, Frequency, Power, Power factor, KWh/KVA, RF compatible for Wide area network/LORAWAN for energy monitoring and billing system, with user based disconnection /reconnection through remote software / data export to MES ERP software including poly carbonate meter box all as specified and as directed by Eng in- Charge with 5 Years warranty complete all as specified and directed. Note:- Quoted rate shall have deemed to be inclusive of following parameters: - (a) Meter reading record shall be submitted before and after replacement duly signed by the contractor rep and MES rep.(b) Old meters should be handed over to MES store.(c) Any rejoining of wires /cables shall be done using suitable ferrule /cable connectors after removal of meter (d) The cost of making good disturbed surfaces & matching to the existing surface is deemed to be included in the unit quoted rates. (e) Taking download energy meter fixed in panels of any capacity any type after carefully disconnecting electrical connections.
Supply, Installation, Testing & Commissioning of Microprocessor based Three phase tamper proof electronic smart energy meter (pre paid and postpaid)rating with 4 wire 415 Volts, 50 HZ, of range 10-60 Amps, confirming to IS 16444 with LED/LCD display and parameters like Voltage, Current, Frequency, Power, Power factor, KWh/KVA,RF Compatible for Wide area network/ LORAWAN for energy monitoring and billing system, with user based disconnection /reconnection through remote software / data export to MES ERP software including poly carbonate meter box with 5 Years warranty complete all as specified and directed. Note : Quoted rate shall have deemed to be inclusive of following parameters: - (a) Meter reading record shall be submitted before and after replacement duly signed by the contractor rep and MES rep.(b) Old meters should be handed over to MES store. (c) Any rejoining of wires /cables shall be done using suitable ferrule /cable connectors after removal of meter.(d) The cost of making good disturbed surfaces & matching to the existing surface is deemed to be included in the unit quoted rates. (e) Taking down old energy meter fixed in panels of any capacity any type after carefully disconnecting electrical connections.
Supply fixing testing, commissioning and configuration of (MDM system) OWN premise server/ NIC server/ AWS server with user level web based software with following modules with life time License for MDM Software complete all as specified and directed. (i) Meter data management Modules :- The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system . The billing system wold support offline meter data entry. the meter data management system would capture and provide the following data. ii) Secured Mobile App/ Online payment gatway for all MES Users :- (a) 30min instantaneous data from all the meters for seven parameters - cumulative energy , Power, Current , Voltage, Power factor and frequency. (b) Monthly and quarterly billing survey data for cumulative energy and max demand and tampering features. (ii) Billing Module :- The billing module would collect the dat from the meter data management module, calculate billing determinant and make energy data / billing data available to admin and end user. (iii) Occupation and Vacation module :- The system would support occupation/ vacation based on the unit categories. The system would support automatic data capture on occupation and vacation events. (iv) Customer Module :- The system would include a customer portal for the resident/occupants to log in and view their own energy/billing data. (v) Energy Accounting module :- The system would include features of energy accounting, the system would to able to account for total energy block wise, facility wise and would also allow calculations of the unaccounted energy in case total energy meter is also available. (iv) Communication Module :- The system would provide communication of energy data and bills via print, email and sms methods. (vii) Meter Master Data :- The system would support meter days repository. The system would support meter replacement process. (viii) Excel Export :- The system would support export of metering and billing data in excel format.
Supply, installation, testing and commissioning of Outdoor Long Range RF accumulator/PCU (DCU ) and MQTT based intelligent network server for bridging between gateway and end application for long range up to 700M suitable for communicating with Remote Server through Private IP and the data Exchange to Server and meter Vice Versa complete all as specified and directed. Note:- The rate quoted shall deemed to be included the following operation cost for a period of 3 years. 1. The cost of pole / fixing / mounting arrangement on which the accumulator to be installed and SMPS power supply with power backup for minimum up to 2 Hours is deemed to be included in the unit quoted rates 2. Monthly sim charges for the DCU. The contractor would ensure supply of appropriate SIMs to ensure necessary single availability. The contractor would change the sim or sim provider as required. In case of network issues, the contractor would liaison with the telecom service providers for necessary resolution. 3. Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts. 4. Software AMC. This would include necessary upgradations in the software such as support to the chrome browser changes, android version changes , iOS version changes. These changes happen on frequent basis and the software would support all the changes. 5. Changes in the government tariff structure. The government tariff structure changes may require software upgrade. The same would be included in the AMC scope of work. 6. Remote server admin support - Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. 7. Reports Development - The additional reports as needed for the success of the project would be developed 8. Software installation on any alternate / backup server if required 9. The communication network monitoring and support 10. Configuration of the repaired / replaced hardware in the system 11. Trouble shooting and necessary actions to run the system as required. 12. Software bug fixing as and when required 2. WARRANTY: Intelligent network server, (MDM system) OWN premise server/ NIC server/ AWS server with user level web based software , mechanical structures, electricals works including power conditioning unit/ Inverters/ charge controller/distribution boards/digital meters/ switch gear/ storage batteries for whole system etc and overall workman ship of SPV power plants systems must be warranted against any manufacturing/design/installation defects for a minimum periods of 3 Years from the date of completion of work.
ELAN ENGINEERS
KVL CONSTRUCTION
KIRAN TRADERS
M/s PIONEER CONTRACTORS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .