Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAdmitted-Finance | ₹36.0 L | L1 | Admitted-Finance |
| 2 | L2₹36.9 L+₹96,812.60 (2.69%)Admitted-Finance | ₹36.9 L+₹96,812.60 (2.69%) | L2 | Admitted-Finance |
| 3 | L3₹38.7 L+₹2.7 L (7.49%)Admitted-Finance 0 MANPUR CHITBARAGAON CHITBARAGAON BALLIA UTTAR PRADESH 221713 | BALLIA | UTTAR PRADESH | 221713 | ₹38.7 L+₹2.7 L (7.49%) | L3 | Admitted-Finance |
| 4 | L4₹39.3 L+₹3.4 L (9.34%)Admitted-Finance | ₹39.3 L+₹3.4 L (9.34%) | L4 | Admitted-Finance |
| 5 | L5₹39.8 L+₹3.8 L (10.6%)Admitted-Finance | ₹39.8 L+₹3.8 L (10.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHAND CONSTRUCTION CO L4 | Sanjeev Kumar Verma L1 | M/S Narinder Pal Choudhary L2 | Ankit Sagar L6 | NATIONAL TRADING COMPANY L3 | M/S Darshan Kumar L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exceeding 15 cm thickness (below or above GL) and removing out side MD land on contractor own arrangement, complete all as specified and directed.
Note:- Demolition includes any no of layers including overleaped tiles , stone etc during execution and no extra cost shall be borne by Govt exchequer. | 34.6 | Cum | 100 ₹3,460 | 1 ₹34.6 Lowest | 50 ₹1,730 | 300 ₹10,380 | 100 ₹3,460 | 100 ₹3,460 |
| 2.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for, complete all as specified and directed. | 2.6 | Cum | 100 ₹260 | 1 ₹2.6 Lowest | 50 ₹130 | 300 ₹780 | 100 ₹260 | 100 ₹260 |
| 3.00 | Dismantling of floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, complete all as specified and directed. | 34 | Sqm | 10 ₹340 | 1 ₹34 Lowest | 10 ₹340 | 125 ₹4,250 | 20 ₹680 | 15 ₹510 |
| 4.00 | Dismantling of mild steel work of any description, complete all as specified and directed. | 5 | Qtl | 400 ₹2,000 | 1 ₹5 Lowest | 300 ₹1,500 | 325 ₹1,625 | 100 ₹500 | 447 ₹2,235 |
| 5.00 | Dismantling of timber scantling 40 sq cm and over in section, in any position, complete all as specified and directed. | 1.2 | Cum | 800 ₹960 | 1 ₹1.2 Lowest | 300 ₹360 | 1,000 ₹1,200 | 200 ₹240 | 700 ₹840 |
| 6.00 | Taking down chowkhats or frames with shutters (without taking off shutters from the frames) of size n. exc 1.5 Sqm each, complete all as specified and directed.
Note-: The rate inlcudes making good of surfaces w/o any extra cost to Govt. | 60 | Each | 50 ₹3,000 | 1 ₹60 Lowest | 10 ₹600 | 200 ₹12,000 | 50 ₹3,000 | 90 ₹5,400 |
| 7.00 | All as per item No 6.00 here-in-before but exc 1.5 Sqm and n.exc 4 sqm each. | 73 | Each | 70 ₹5,110 | 1 ₹73 Lowest | 10 ₹730 | 300 ₹21,900 | 50 ₹3,650 | 90 ₹6,570 |
| 8.00 | Taking down shutters of any description exc 1 sqm but n exc 2 sqm each, complete all as specified and directed. | 40 | Per Leaf | 20 ₹800 | 1 ₹40 Lowest | 10 ₹400 | 100 ₹4,000 | 50 ₹2,000 | 20 ₹800 |
| 9.00 | Taking down door shutter of any desc exc 1 sqm but not exc 2 sqm and refixing in the same opening, complete all as specified and directed. | 10 | Per Leaf | 20 ₹200 | 100 ₹1,000 | 10 ₹100 Lowest | 250 ₹2,500 | 50 ₹500 | 120 ₹1,200 |
| 10.00 | Taking down old ceiling board of any description and re fixing same opening after adjusting and repair of existing hangar wire and ceiling grid, complete all as specified and directed.
Note: Contractor shall preserve all dismantleD ceiling board and grid in order to refix the same any damage shall be borne by contractor. | 200 | Sqm | 10 ₹2,000 Lowest | 100 ₹20,000 | 10 ₹2,000 Lowest | 180 ₹36,000 | 50 ₹10,000 | 100 ₹20,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
14 Aug 2026, 6:00 pmClosed
GE 862 EWS
GE 862 EWS PIN 913862 c/o 56 APO
CERTAIN BLDGS REPAIRS TO ROOFING FLOORING JOINERY PLUMBING AND OTHER BR WORKS IN RIGHT SIDE OF TAIN BRIDGE NORTH ZONE UNDER AGE BR DETT A NAUSHERA GARRISON OF GE 862 EWS
2026_MES_779224_1
GER-55/2026-27
Open Tender
Civil Works
Item Rate
270 days
GE 862 EWS
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE 862 EWS
₹90,000
Yes
20 Aug 2026
17 Jul 2026
18 Aug 2026
17 Jul 2026
14 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exceeding 15 cm thickness (below or above GL) and removing out side MD land on contractor own arrangement, complete all as specified and directed.
Note:- Demolition includes any no of layers including overleaped tiles , stone etc during execution and no extra cost shall be borne by Govt exchequer. | - | Cum | - | - |
| 2 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for, complete all as specified and directed. | - | Cum | - | - |
| 3 | Dismantling of floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, complete all as specified and directed. | - | Sqm | - | - |
| 4 | Dismantling of mild steel work of any description, complete all as specified and directed. | - | Qtl | - | - |
| 5 | Dismantling of timber scantling 40 sq cm and over in section, in any position, complete all as specified and directed. | 1.2 | Cum | - | - |
| 6 | Taking down chowkhats or frames with shutters (without taking off shutters from the frames) of size n. exc 1.5 Sqm each, complete all as specified and directed.
Note-: The rate inlcudes making good of surfaces w/o any extra cost to Govt. | 60 | Each | - | - |
| 7 | All as per item No 6.00 here-in-before but exc 1.5 Sqm and n.exc 4 sqm each. | 73 | Each | - | - |
| 8 | Taking down shutters of any description exc 1 sqm but n exc 2 sqm each, complete all as specified and directed. | 40 | Per Leaf | - | - |
| 9 | Taking down door shutter of any desc exc 1 sqm but not exc 2 sqm and refixing in the same opening, complete all as specified and directed. | 10 | Per Leaf | - | - |
| 10 | Taking down old ceiling board of any description and re fixing same opening after adjusting and repair of existing hangar wire and ceiling grid, complete all as specified and directed.
Note: Contractor shall preserve all dismantleD ceiling board and grid in order to refix the same any damage shall be borne by contractor. | 200 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_872766.xls
BOQ • 0.46 MB
TD.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .