| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹15.5 L (11.2%)Admitted-Finance 2 1068 MALLIGAI STREET EZHIL NAGAR IYER BUNGALOW MADURAI 625014 | MADURAI | TAMIL NADU | 625014 | ₹1.5 Cr+₹15.5 L (11.2%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHARVAA ASSOCIATES L1 | PR AND CO L2 |
|---|---|---|---|---|---|
| 1.00NAME OF WORK: Providing Metalling and BT from Vanjipatti to Nellukundupatti Km 0/0 -2/3 | |||||
| 2.00Clearing the scrub jungle with uprooting and including all cuttings depositing of the products, removing from the site disposal by burying etc., complete including all incidental charges as directed by the departmental officers (SSR 301, 302, MOST 201) | |||||
| 3.00 | 0/0-2/3 | 4,968 | Sqm | 4.1 ₹20,368.8 Lowest | 5 ₹24,840 |
| 4.00Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305 | |||||
| 5.00 | 0/0-2/3 | 2,100 | Cum | 89.5 ₹1,87,950 Lowest | 95 ₹1,99,500 |
| 6.00Picking existing BT surface | |||||
| 7.00 | 0/0-2/3 | 2,375 | sqm | 1,531 ₹36,36,125 Lowest | 2,000 ₹47,50,000 |
| 8.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms | |||||
| 9.00 | 0/0-1/0 | 178 | Cum | 677.94 ₹1,20,673.32 Lowest | 677.94 ₹1,20,673.32 Lowest |
| 10.00 | 1/0-2/0 | 180 | Cum | 686.28 ₹1,23,530.4 Lowest | 686.28 ₹1,23,530.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
25 Feb 2021, 3:00 pmClosed
ADDITIONAL COLLECTOR DRDA MADURAI -20
DRDA MADURAI -20
MADURAI DISTRICT STRENGTHENING AND BLACK TOPPING OF 2 NOS. OF ROADS IN KOTTAMPATTI BLOCK AT MADURAI DISTRICT UNDER TNRRIS 2020-21 ADNL PACKAGE NO 15
2021_RDTN_196934_2
d6/236/2021/TNRRISADNLP15
Open Tender
Civil Works
Item Rate
180 days
Kottampatti
Refer Tender document
3 documents required · 3 mandatory
₹0
₹1 L
15 Jun 2022
24 Feb 2021
25 Feb 2021
24 Feb 2021
25 Feb 2021
24 Feb 2021
Amount
Clearing the scrub jungle with uprooting and including all cuttings depositing of the products, removing from the site disposal by burying etc., complete including all incidental charges as directed by the departmental officers (SSR 301, 302, MOST 201)
Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305
Picking existing BT surface
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing 75mm consolidated thickness WBM for top layers using 1 cum of grade III metal 2.50% of 63mm, 20% of 53mm, 72.50% of 45mm metal, 2.50% of 22.40mm and 2.50% of 11.20mm IRC size hard broken metal and 0.24 cum of gravel whose PI values is less than "6" for blind age and filler for 10 sqm, area including cost and conveyance of all materials from approved quarries to worksite and stacking of materials to department standard metric gauage for premeasurements including labour for laying, spreading new mwtal hand packing to camber gravel binding, watering with all leads for good water even if the season is worst drought forming edge bunds and consolidation by 8-10 tonne power roller and finishing to the total thickness with lines grades and cross sections as specified as per the departmental specifications including hire charges for all tools and plants and including fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete
Applying tack coat over WBM surface using 3kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section store and cost of which will be recovered at the words as per special conditions appended inc
Applying tack coat over WBM surface using 4kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section store and cost of which will be recovered at the words as per special conditions appended inc
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Suppy and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Suppy and fixing of KILOMETER STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Sign board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Clearing the scrub jungle with uprooting and including all cuttings depositing of the products, removing from the site disposal by burying etc., complete including all incidental charges as directed by the departmental officers (SSR 301, 302, MOST 201)
Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying tack coat over WBM surface using 3kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section store and cost of which will be recovered at the words as per special conditions appended inc
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Suppy and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Suppy and fixing of KILOMETER STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Sign board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Earth work excavation for Foundation in all clauses of soil, such as gravelly soil, hard stiff clay stiff black cotton soil, hard red earth and earth mixed with 50% of fair sized boulders and hard gravelly soil except sand, silt or other loose soils sandy loam and ordinary soil, hard rock requiring blasting etc.,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Plain CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supplying and centering shuttering including necessary support for plane surface for RCC column, footing , raft slabs, grade beams ,bed blocks using steel sheets of size 90cmx60cm and 10 gauge stiffened welded with mild steel angles of size 25mmx25mmx3mm for h laid over silver oak(country wood) first size 10cmx6.5cm spaced at about 90cm centre to centre supported by casurinas props of 10cm to 13 cm dia. Spaced at 75cm center complete complying with standard specification as directed by departmental officers (Below G.L)
Plain CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PR AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .