| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC ROOM NO 262 PART II NEAR SANKER MANDIR GANESH MURTHI NAGAR COLABA MUMBAI 05 | MUMBAI | ₹6.3 L | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹7.7 L+₹1.5 L (23.2%)Rejected-Finance | ₹7.7 L+₹1.5 L (23.2%) | L2 | Rejected-Finance Being Lowest |
| 3 | L3₹10.3 L+₹4.0 L (63.3%)Rejected-Finance | ₹10.3 L+₹4.0 L (63.3%) | L3 | Rejected-Finance Being Lowest |
| 4 | L4₹10.9 L+₹4.6 L (73.5%)Rejected-Finance | ₹10.9 L+₹4.6 L (73.5%) | L4 | Rejected-Finance Being Lowest |
| 5 | L5₹11.3 L+₹5.0 L (79.3%)Rejected-Finance | ₹11.3 L+₹5.0 L (79.3%) | L5 | Rejected-Finance Being Lowest |
| Sl No | Description | Qty | Unit | Abida Enterprises L1 | ALAM ENTERPRISES L4 | M/s. Mohan Enterprise L3 | M/S SATISH KUMAR SINGH & SONS L2 | M/S. KESHAB CHANDRA GHOSH L5 | Puskal Builders Pvt Ltd L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for complete removal of existing treatment on walls and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over the surface, complete all as specified and as directed.
Note:- Second coat will only be carried out after 12 Hrs of first coat. | 3,000 | Square Metre | 122 ₹3,66,000 Lowest | 210 ₹6,30,000 | 195 ₹5,85,000 | 142 ₹4,26,000 | 215 ₹6,45,000 | 211 ₹6,33,000 |
| 2.00 | Material and labour for 1 to 2mm thick cement based wall care putty on walls to give uniform surface. Before applying of wall care putty, remove existing treatment of putty, completed all as specified and as directed. | 500 | Square Metre | 60 ₹30,000 Lowest | 130 ₹65,000 | 125 ₹62,500 | 90 ₹45,000 | 135 ₹67,500 | 131 ₹65,500 |
| 3.00 | Taking down cement plaster on brick or stone walls etc. including raking out joints, hacking for keys, scrubbing down with water etc. and rubish off the premises, complete all as specified and as directed. | 104 | Square Metre | 35 ₹3,640 Lowest | 150 ₹15,600 | 140 ₹14,560 | 110 ₹11,440 | 155 ₹16,120 | 155 ₹16,120 |
| 4.00 | Material and labour for rendering 15mm thick plaster in cement mortar(1(cement):6(sand) on fair faces of concrete or brick work and finish the surface even fair, complete all as specified and as directed. | 44 | Square Metre | 230 ₹10,120 Lowest | 380 ₹16,720 | 375 ₹16,500 | 320 ₹14,080 | 386 ₹16,984 | 380 ₹16,720 |
| 5.00 | Material and labour for rendering 15mm thick plaster in cement mortar(1(cement):4(sand) on fair faces of concrete or brick work in two layers (10mm thick 1st layer + 5mm thick finishing layer) mixed with water proofing compound as per manufacturer’s instructions on top layer only and finish the surface even fair, complete all as specified and as directed.
Note :- WPC will be measured and paid separately under relevant item. | 50 | Square Metre | 240 ₹12,000 Lowest | 400 ₹20,000 | 390 ₹19,500 | 340 ₹17,000 | 413 ₹20,650 | 405 ₹20,250 |
| 6.00 | Supply of integral water proofing compound. | 2 | Kilogram | 200 ₹400 | 80 ₹160 | 85 ₹170 | 50 ₹100 Lowest | 86 ₹172 | 85 ₹170 |
| 7.00 | Material and labour for rendering 5mm thick in cement mortor (1:3) on fair faces of concrete surfaces as in ceilings (sunshed, chajja etc) and finishing surfaces even and fair, complete all as specified and as directed. | 10 | Square Metre | 180 ₹1,800 Lowest | 350 ₹3,500 | 345 ₹3,450 | 250 ₹2,500 | 359 ₹3,590 | 350 ₹3,500 |
| 8.00 | Material and labour for 1 to 2mm thick cement based wall care putty on newly plastered surfaces of walls to give uniform surface, completed all as specified and as directed. | 44 | Square Metre | 40 ₹1,760 Lowest | 150 ₹6,600 | 150 ₹6,600 | 85 ₹3,740 | 156 ₹6,864 | 155 ₹6,820 |
| 9.00 | Material and labour for preparation of newly plastered surfaces of wall and applying two coats of 1st quality acrylic distemper over a coat of alkali resistant primer, complete all as specified and as directed.
Note:- Second coat will only be carried out after 12 Hrs of first coat. | 44 | Square Metre | 70 ₹3,080 Lowest | 120 ₹5,280 | 115 ₹5,060 | 70 ₹3,080 Lowest | 126 ₹5,544 | 130 ₹5,720 |
| 10.00 | Material and labour for preparation of newly plastered surfaces of walls and applying two coats of cement base paint over a coat of alkali resistant primer, complete all as specified and as directed.
Note:-Second coat will only be carried out after 12 Hrs of first coat. | 50 | Square Metre | 70 ₹3,500 Lowest | 120 ₹6,000 | 115 ₹5,750 | 75 ₹3,750 | 126 ₹6,300 | 130 ₹6,500 |
Tender Value
₹9 L
EMD Value
₹18,000
Closing Date
16 Jul 2026, 6:00 pmClosed
AGE (I) AF PURNEA
AGE (I) AF PURNEA, P.O - CHUNAPUR AIR FIELD, DIST- PURNEA BIHAR, PIN CODE-854303
WELCOME MAINT AND MISC B/R REPAIRS TO OMQ AND SINGLE LIVING OFFRS ACCN AT AF STN PURNEA UNDER AGE (I) (AF) PURNEA
2026_MES_773451_1
8181/E8
Open Tender
Civil Works
Item Rate
180 days
Purnea
As per Tender Documents
7 documents required · 7 mandatory
₹500
Yes
AGE(I)(AF) Purnea
₹18,000
Yes
1 Sept 2026
19 Jun 2026
18 Jul 2026
19 Jun 2026
16 Jul 2026
3 Jul 2026
19 Jun 2026 - 3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for complete removal of existing treatment on walls and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over the surface, complete all as specified and as directed.
Note:- Second coat will only be carried out after 12 Hrs of first coat. | 3,000 | Square Metre | - | - |
| 2 | Material and labour for 1 to 2mm thick cement based wall care putty on walls to give uniform surface. Before applying of wall care putty, remove existing treatment of putty, completed all as specified and as directed. | 500 | Square Metre | - | - |
| 3 | Taking down cement plaster on brick or stone walls etc. including raking out joints, hacking for keys, scrubbing down with water etc. and rubish off the premises, complete all as specified and as directed. | 104 | Square Metre | - | - |
| 4 | Material and labour for rendering 15mm thick plaster in cement mortar(1(cement):6(sand) on fair faces of concrete or brick work and finish the surface even fair, complete all as specified and as directed. | 44 | Square Metre | - | - |
| 5 | Material and labour for rendering 15mm thick plaster in cement mortar(1(cement):4(sand) on fair faces of concrete or brick work in two layers (10mm thick 1st layer + 5mm thick finishing layer) mixed with water proofing compound as per manufacturer’s instructions on top layer only and finish the surface even fair, complete all as specified and as directed.
Note :- WPC will be measured and paid separately under relevant item. | 50 | Square Metre | - | - |
| 6 | Supply of integral water proofing compound. | 2 | Kilogram | - | - |
| 7 | Material and labour for rendering 5mm thick in cement mortor (1:3) on fair faces of concrete surfaces as in ceilings (sunshed, chajja etc) and finishing surfaces even and fair, complete all as specified and as directed. | 10 | Square Metre | - | - |
| 8 | Material and labour for 1 to 2mm thick cement based wall care putty on newly plastered surfaces of walls to give uniform surface, completed all as specified and as directed. | 44 | Square Metre | - | - |
| 9 | Material and labour for preparation of newly plastered surfaces of wall and applying two coats of 1st quality acrylic distemper over a coat of alkali resistant primer, complete all as specified and as directed.
Note:- Second coat will only be carried out after 12 Hrs of first coat. | 44 | Square Metre | - | - |
| 10 | Material and labour for preparation of newly plastered surfaces of walls and applying two coats of cement base paint over a coat of alkali resistant primer, complete all as specified and as directed.
Note:-Second coat will only be carried out after 12 Hrs of first coat. | 50 | Square Metre | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_866046.xls
BOQ • 0.35 MB
TENDER8181.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .