Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.1 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹35.0 L+₹94,949.57 (2.79%)Accepted-Finance | 2 | Accepted-Finance 2 | |
| 3 | 3₹35.5 L+₹1.4 L (4.26%)Accepted-Finance | 3 | Accepted-Finance 3 | |
| 4 | 4₹36.8 L+₹2.7 L (7.94%)Accepted-Finance | 4 | Accepted-Finance 4 | |
| 5 | 5₹37.1 L+₹3.1 L (8.98%)Accepted-Finance | 5 | Accepted-Finance 5 |
Tender Value
₹50 L
EMD Value
₹1.5 L
Closing Date
27 Apr 2026, 4:00 pmClosed
Executive Engineer Jal Shakti PHE Div. Bijbehara
Executive Engineer Jal Shakti PHE Div. Bijbehara
Construction of Additional Staff Accommodation at Panjitarni under SANJY 2026-27 (UT CAPEX)
2026_PHE_308275_3
09/PHE/BIJ OF 2026-27
Open Tender
Civil Works - Water Works
Percentage
panjtharni
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti PHE Div. Bijbehara
₹1.5 L
Yes
30 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
21 Apr 2026 - 27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | - | - | - | - |
| 2 | All kinds of soil. | - | cum | - | - |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | - | - | - | - |
| 4 | All kinds of soils | - | Cum | - | - |
| 5 | Providing and laying of dry stones soling tightly hand packed including all carriages. | - | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1:4:8) 1 cement, 4 coarse sand, 8 graded stone aggregate of 40 mm nominal size) crushed. | - | cum | - | - |
| 7 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and
curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | - | cum | - | - |
| 8 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) | - | cum | - | - |
| 9 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) Raised and cut pointing | - | Sqm | - | - |
| 10 | Structural steel works welded in builtup sections, trusses and framed works including cutting, hoisting, fixing in position and applying a priming coat of approved metal primer complete. | - | Kg | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_999202.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_999202.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .