Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.3 LAccepted-AOC | ₹36.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹38.0 LRejected-AOC | ₹38.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | CLASSIC ENGINEERING L1 | SRI VISALAKSHI CO L2 |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavating and depositing on bank with an initial lead of 10metres and initial lift of 2 metres in Hard stiff clay, stiff black cotton, Hard red earth, shales, murram, gravel, stoney earth, and earth mixed with small size boulders SS20B. For pipe line TWARD -208 25/26 | 600 | m³ | 392.5 ₹2.4 L | 410.6 ₹2.5 L |
| 2.01 | Removing the burst P.V.C./ HDPE Pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc., complete (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board Officers TWARD -200 25/26 | 167 | nos | 2,573.2 ₹4.3 L | 2,691.6 ₹4.5 L |
| 3.01 | Supply and delivery of HDPE pipes for sewerage PE 100 PN 10 conforming to IS : 14333/1996 (amended in 2009) TWARD - 17 - 25/26 | 1,000 | m | 2,322.3 ₹23.2 L | 2,429.1 ₹24.3 L |
| 4.01 | Supply and delivery of HDPE pipes for sewerage PE 100 PN 10 conforming to IS : 14333/1996 (amended in 2009) TWARD - 21 - 25/26 | 4 | nos | 5,385.8 ₹21,543.20 | 5,633.5 ₹22,534 |
| 5.01 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers TWARD -192 -25/26 | 1,000 | m | 36.3 ₹36,300 | 38 ₹38,000 |
| 6.01 | Cutting P.V.C./ HDPE rigid pipes and specials true to axis and finishing the ends complete TWARD -196 -25/26 | 8 | nos | 28.6 ₹228.80 | 29.9 ₹239.20 |
| 7.01 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part- 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. TWARD -204 -25/26 | 175 | m | 28.6 ₹5,005 | 29.9 ₹5,232.50 |
| 8.01 | Attending Leakages in 700mm, 500mm, 450mm, 400mm & 300mm dia water Supply D.I, PVC, FRP, PSC, A.C main including the hire charge for JCB, Disel Pumpset Hemp Yarn Rubber sheet, Quick Setting Cement M.S Specials Fabrication for Cutting & including the Labour for Fitter, Mazdoor, etc., Completed. (Minor Pipe leakage with out P.C.C ) (DATA) | 1 | nos | 2,993 ₹2,993 | 3,130.7 ₹3,130.70 |
| 9.01 | Refilling the trenches with suitable excavated earth available along the allignment after the pipes &specials are laid joimted &tested in layers &watering ramming &consolidation directed by the engineer in charge CORPO - 11 | 568.6 | m³ | 47.1 ₹26,781.06 | 49.3 ₹28,031.98 |
| 10.01 | Add GST 18% | 1 | GST | 5,54,452.6 ₹5.5 L | 5,79,957.4 ₹5.8 L |
Tender Value
₹36.4 L
EMD Value
₹36,384
Closing Date
30 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai Thallakulam Madurai
225 MM HDPE Pipe Pumping Main Line work at Muniyandi Puram pumping station to Bykara E.B.Colony in Ward No.93
2026_MAWS_646899_1
Z5 / E8 / Est.398 / 25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹36,384
17 Feb 2026
25 Jan 2026
30 Jan 2026
25 Jan 2026
30 Jan 2026
25 Jan 2026
Earthwork excavating and depositing on bank with an initial lead of 10metres and initial lift of 2 metres in Hard stiff clay, stiff black cotton, Hard red earth, shales, murram, gravel, stoney earth, and earth mixed with small size boulders SS20B. For pipe line TWARD -208 25/26
Removing the burst P.V.C./ HDPE Pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc., complete (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board Officers TWARD -200 25/26
Supply and delivery of HDPE pipes for sewerage PE 100 PN 10 conforming to IS : 14333/1996 (amended in 2009) TWARD - 17 - 25/26
Supply and delivery of HDPE pipes for sewerage PE 100 PN 10 conforming to IS : 14333/1996 (amended in 2009) TWARD - 21 - 25/26
Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers TWARD -192 -25/26
Cutting P.V.C./ HDPE rigid pipes and specials true to axis and finishing the ends complete TWARD -196 -25/26
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part- 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. TWARD -204 -25/26
Attending Leakages in 700mm, 500mm, 450mm, 400mm & 300mm dia water Supply D.I, PVC, FRP, PSC, A.C main including the hire charge for JCB, Disel Pumpset Hemp Yarn Rubber sheet, Quick Setting Cement M.S Specials Fabrication for Cutting & including the Labour for Fitter, Mazdoor, etc., Completed. (Minor Pipe leakage with out P.C.C ) (DATA)
Refilling the trenches with suitable excavated earth available along the allignment after the pipes &specials are laid joimted &tested in layers &watering ramming &consolidation directed by the engineer in charge CORPO - 11
Add GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Doc.pdf
Tender Documents • 0.90 MB
BOQ_775415.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid